SAP ABAP Table TCX0L (Scheduling long term planning: Levels and control parameters)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM (Application Component) Customer Relationship Management
⤷
CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷
CX (Package) R/3 Application development: R/3 Scheduling

⤷

⤷

⤷

Basic Data
Table Category | TRANSP | Transparent table |
Transparent table | TCX0L |
![]() |
Short Description | Scheduling long term planning: Levels and control parameters |
Delivery and Maintenance
Pool/cluster | ||
Delivery Class | C | Customizing table, maintenance only by cust., not SAP import |
Data Browser/Table View Maintenance | X | Display/Maintenance Allowed |
Components
![]() |
Field | Key | Data Element | Domain | Data Type |
Length | Decimal Places |
Short Description | Check table |
---|---|---|---|---|---|---|---|---|---|
1 | ![]() |
MANDT | MANDT | CLNT | 3 | 0 | Client | T000 | |
2 | ![]() |
WERKS_D | WERKS | CHAR | 4 | 0 | Plant | T001W | |
3 | ![]() |
AUFTG | AUFTG | CHAR | 2 | 0 | Order group for capacity planning | ||
4 | ![]() |
AUFTA | AUFTA | CHAR | 4 | 0 | Order type in capacity planning | ||
5 | ![]() |
FEVOR | FEVOR | CHAR | 3 | 0 | Production Supervisor | T024F | |
6 | ![]() |
PLSCN | PLSCN | NUMC | 3 | 0 | Planning Scenario of Long-Term Planning | PLSC | |
7 | ![]() |
SCHED_TYPE | SCHED_TYPE | CHAR | 1 | 0 | Scheduling level | ||
8 | ![]() |
APLS1_LTP | CP_SEL_ID | CHAR | 2 | 0 | Selection ID for routing (long term planning) | TCA43 | |
9 | ![]() |
KAPKX_LTP | XFELD | CHAR | 1 | 0 | Create capacity requirements (long term planning) | ||
10 | ![]() |
TERMX_LTP | XFELD | CHAR | 1 | 0 | Lead time scheduling (long term planning) | ||
11 | ![]() |
DADJ2 | DADJ2 | CHAR | 1 | 0 | Adjust dates in lead time scheduling | ||
12 | ![]() |
DADJ3 | DADJ3 | CHAR | 1 | 0 | Adjusting dates when dispatching planned orders | ||
13 | ![]() |
TERMKZ | TERART | CHAR | 1 | 0 | Scheduling type | T482 | |
14 | ![]() |
STVERG | STVERG | NUMC | 3 | 0 | Maximum number of days start date can be in the past | ||
15 | ![]() |
LAGE_FR | LAGE_FR | CHAR | 1 | 0 | Latest date for material staging | ||
16 | ![]() |
BREAKS | XFELD | CHAR | 1 | 0 | Indicator: Scheduling allowing for breaks | ||
17 | ![]() |
PROD_DATES | XFELD | CHAR | 1 | 0 | Scheduling based on production dates | ||
18 | ![]() |
REDST_MAX | REDST_MAX | NUMC | 1 | 0 | Maximum reduction level | ||
19 | ![]() |
REDVS_S1 | CX_RPROZ | DEC | 3 | 0 | Red. of floats before and after production (%) | ||
20 | ![]() |
REDVS_S2 | CX_RPROZ | DEC | 3 | 0 | Reduction level 2: Red. of floats bef./after prod. (in %) | ||
21 | ![]() |
REDVS_S3 | CX_RPROZ | DEC | 3 | 0 | Reduction level 3: Red. of floats bef./aft. prod. (in %) | ||
22 | ![]() |
REDVS_S4 | CX_RPROZ | DEC | 3 | 0 | Reduction level 4: Red. of floats bef./aft. prod. (in %) | ||
23 | ![]() |
REDVS_S5 | CX_RPROZ | DEC | 3 | 0 | Reduction level 5: Red. of floats bef./aft. prod. (in %) | ||
24 | ![]() |
REDVS_S6 | CX_RPROZ | DEC | 3 | 0 | Reduction level 6: Red. of floats bef./aft. prod. (in %) |
Foreign Keys
![]() |
Source Table | Source Column | Foreign Table | Foreign Column | Dependency Factor | Cardinality left | Cardinality right |
---|---|---|---|---|---|---|---|
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
1 | TCX0L | APLS1_LTP | ![]() |
![]() |
KEY | 1 | CN |
2 | TCX0L | MANDT | ![]() |
![]() |
KEY | 1 | CN |
3 | TCX0L | PLSCN | ![]() |
![]() |
KEY | 1 | CN |
4 | TCX0L | TERMKZ | ![]() |
![]() |
KEY | 1 | CN |
5 | TCX0L | VAGRP | ![]() |
![]() |
KEY | 1 | CN |
6 | TCX0L | WERKS | ![]() |
![]() |
KEY | 1 | CN |
History
Last changed by/on | SAP | 20110901 |
SAP Release Created in |