SAP ABAP Data Element PROD_DATES (Scheduling based on production dates)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM (Application Component) Customer Relationship Management
⤷
CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷
CX (Package) R/3 Application development: R/3 Scheduling
⤷
⤷
⤷
Basic Data
| Data Element | PROD_DATES |
| Short Description | Scheduling based on production dates |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | XFELD | |
| Data Type | CHAR | Character String |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Prod.dates |
| Medium | 15 | frm ProdDates |
| Long | 20 | Sch. from prod. date |
| Heading | 5 | PrDts |
Documentation
Definition
Indicator with which you specify which dates have to be entered when you create or change an order:
- If the indicator is set, you must enter one or more production dates (scheduled dates).
- If the indicator is not set, you must enter one or more basic dates.
Dependencies
The system displays in the order header in addition to each date the time, if you:
- specified that production dates (scheduled dates) have to be entered, by using the indicator
- chose a scheduling type that displays the time.
History
| Last changed by/on | SAP | 19970812 |
| SAP Release Created in |