SAP ABAP Data Element CMACT (Assignment Material Staging Operation Segment)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ CX (Package) R/3 Application development: R/3 Scheduling
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ CX (Package) R/3 Application development: R/3 Scheduling
Basic Data
Data Element | CMACT |
Short Description | Assignment Material Staging Operation Segment |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CMACT | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Segment |
Medium | 15 | Segment |
Long | 37 | Assignment Component Operation Seg. |
Heading | 20 | Operation Segment |
Documentation
Definition
Determines to which operation segment (set up, processing, tear down) the components with a positive requirements quantity are assigned.
Use
Components with a positive requirements quantity are assigned to the start of the corresponding operation segment as a requirements date (if required, moved by stored operation-related positive lead time).
Dependencies
Depending upon the "Latest Dates Material Staging" indicator the latest or earliest start date of the selected operation segment is assigned to the requirements date.
Example
History
Last changed by/on | SAP | 20030327 |
SAP Release Created in | 470 |