Data Element list used by SAP ABAP PINF CPPEACT_PIF (CPPEACT_PIF)
SAP ABAP PINF
CPPEACT_PIF (CPPEACT_PIF) is using
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
![]() |
![]() |
|||
1 | ![]() |
PPEHD_PNAME | Name of Superordinate Object | |
2 | ![]() |
PPEUIACT_PNTYPE | iPPE Object Type | |
3 | ![]() |
PPE_ACTA_PRIMRES | Primary Resource | |
4 | ![]() |
PPE_ACTA_SECRES | Secondary Resource | |
5 | ![]() |
PPE_ACTA_SECRES_NEU | New Secondary Resource | |
6 | ![]() |
PPE_ACTEFFECT | iPPE Effectivity of Order for Activity | |
7 | ![]() |
PPE_ACTN_ACT_NAME | Activity | |
8 | ![]() |
PPE_ACTN_HDR_NAME | Routing Header | |
9 | ![]() |
PPE_ACTN_OPR_NAME | Operation | |
10 | ![]() |
PPE_ACTN_PRED | Predecessor Activity/Operation | |
11 | ![]() |
PPE_ACTN_SUCC | Successor Activity - Successor Operation | |
12 | ![]() |
PPE_ACTOBJTYPE | Object Types in the iPPE Process Structure | |
13 | ![]() |
PPE_ACTTYPE | iPPE Activity Type | |
14 | ![]() |
PPE_ACT_OD_USE | Use of Object Dependencies | |
15 | ![]() |
PPE_ADD_SEQ | Indicator for Additional Relationships | |
16 | ![]() |
PPE_CAPACITY | Capacity Requirements | |
17 | ![]() |
PPE_CAPACITY_FIX | Fixed Capacity Requirements | |
18 | ![]() |
PPE_CAPUNIT | Unit of Capacity Requirements | |
19 | ![]() |
PPE_CAP_BUCKET | Variable Bucket Consumption | |
20 | ![]() |
PPE_CAP_BUCKET_FIX | Fixed Bucket Consumption | |
21 | ![]() |
PPE_CAP_UNIT_BUCKET | Unit of Measurement of Bucket Resource Usage | |
22 | ![]() |
PPE_CARFIX | Duration (Lot Size Fixed) | |
23 | ![]() |
PPE_CARVAR | Variable Duration | |
24 | ![]() |
PPE_CONSTRAINT_TYPE | Usage of Minimum and Maximum Interval | |
25 | ![]() |
PPE_COVERFLG | Strict Resource Coupling: Locks Resource for Other ACTs | |
26 | ![]() |
PPE_COVER_FLG | Continual Resource Load | |
27 | ![]() |
PPE_CRTYPE | Relationship | |
28 | ![]() |
PPE_DESC_ICON | Description | |
29 | ![]() |
PPE_DURATION | Duration | |
30 | ![]() |
PPE_DURATION_FIX | Fixed Duration | |
31 | ![]() |
PPE_DURATION_MODE | Usage Type of the Rounding Value | |
32 | ![]() |
PPE_DURFIX | Duration of an Activity (Fixed) | |
33 | ![]() |
PPE_DURRND | Quantity for Each Duration of an Activity (Rounding Unit) | |
34 | ![]() |
PPE_DURVAR | Duration of an Activity (Variable) | |
35 | ![]() |
PPE_IOCOMPONENT | Input/Output Components | |
36 | ![]() |
PPE_IO_OFFSET | Interval for Material Consumption | |
37 | ![]() |
PPE_IO_OFFSET_UNIT | Unit for Consumption Interval | |
38 | ![]() |
PPE_MATCOFLG | Time of Material Consumption | |
39 | ![]() |
PPE_MATCOOUT | Time of Material Consumption | |
40 | ![]() |
PPE_MATERIAL_FLOW | Aggregate Scrap | |
41 | ![]() |
PPE_MAX_BREAK | Duration of a Short Break During an Activity | |
42 | ![]() |
PPE_MAX_BREAK_TUNIT | Unit for Short Break | |
43 | ![]() |
PPE_MAX_BREAK_USE | Use Maximum Possible Break | |
44 | ![]() |
PPE_MAX_SHORT_BREAK | Maximum Duration of a Short Break | |
45 | ![]() |
PPE_MODECOUPLE | Type of Mode Linkage | |
46 | ![]() |
PPE_MODEPRIORITY | Priority for Mode Selection | |
47 | ![]() |
PPE_MODEPRIORITY_EXTERN | Priority for Mode Selection | |
48 | ![]() |
PPE_MODNUM | Mode Number | |
49 | ![]() |
PPE_MODTX | Mode Description | |
50 | ![]() |
PPE_NOSYNCFLG | Synchronization Behavior of iPPE Activities on Multi-Res. | |
51 | ![]() |
PPE_OBJ_CNT | Object Counter | |
52 | ![]() |
PPE_OD_SWITCH | Object Dependencies Active in iPPE Process Structure | |
53 | ![]() |
PPE_PLANNING_TYPE | Planning Type | |
54 | ![]() |
PPE_PLANTYPE | Type of iPPE Process Structure | |
55 | ![]() |
PPE_PLANTYPE_DESC | Description of Routing Types in the iPPE Process Structure | |
56 | ![]() |
PPE_PNODE_ACT | Process Structure | |
57 | ![]() |
PPE_PROD_IN_SHIFT | Production Within a Shift | |
58 | ![]() |
PPE_SCHED_BY_SUCC | Schedule Intervals According to Resource of Next Activity | |
59 | ![]() |
PPE_SCRAP | Scrap factor | |
60 | ![]() |
PPE_SCRAP_100 | Scrap as a Percentage | |
61 | ![]() |
PPE_SEQICON | Sequence Indicator | |
62 | ![]() |
PPE_SEQTIME_AVG | Average Interoperation Time | |
63 | ![]() |
PPE_SEQTIME_INF | Average Interoperation Time | |
64 | ![]() |
PPE_SEQTIME_MAX | Maximum Interoperation Time | |
65 | ![]() |
PPE_SEQTIME_MAXI | Maximum Interoperation Time | |
66 | ![]() |
PPE_SEQTIME_MIN | Minimum Interoperation Time | |
67 | ![]() |
PPE_SEQTIME_MINI | Minimum Interoperation Time | |
68 | ![]() |
PPE_SETCALE | Indicator: Calendar Resource | |
69 | ![]() |
PPE_SLOT_START | Start of Activity | |
70 | ![]() |
PPE_STD_ACT | iPPE Standard Activity | |
71 | ![]() |
PPE_TADUR_B | Gross Time of the Time Analysis in 1/100 Second | |
72 | ![]() |
PPE_TADUR_CODE | Code for the Time Analysis | |
73 | ![]() |
PPE_TADUR_N | Net Time of the Time Analysis in 1/100 Sec. | |
74 | ![]() |
PPE_TA_FLAG | Transfer Indicator for Time Analysis | |
75 | ![]() |
PPE_TIMEUNIT | Time Unit | |
76 | ![]() |
PPE_TREELEVEL | Routing Hierarchy Level | |
77 | ![]() |
PPE_TUNIT | Time Unit | |
78 | ![]() |
PPE_TUNIT_AVG | Time Unit for Average Interoperation Time for Infinite Plng | |
79 | ![]() |
PPE_TUNIT_MAX | Time Unit for Maximum Interoperation Time | |
80 | ![]() |
PPE_TUNIT_MIN | Time Unit for Minimum Interoperation Time | |
81 | ![]() |
PPE_USE_MAX_TIME | Use the Maximum Interoperation Time | |
82 | ![]() |
PPE_USE_MIN_TIME | Use the Minimum Interoperation Time | |
83 | ![]() |
PPE_VWEA | Standard Value Determination Type | |
84 | ![]() |
PPE_VWEA_TEXT | Description of the Standard Value Determination Type | |
85 | ![]() |
PVS_ACTTYPE | Node Types in the iPPE Process Structure | |
86 | ![]() |
PVS_RES_NAME | Resource Description |