SAP ABAP Data Element PPE_SCHED_BY_SUCC (Schedule Intervals According to Resource of Next Activity)
Hierarchy
EA-IPPE (Software Component) SAP iPPE
   AP-PPE (Application Component) Integrated Product and Process Engineering
     CPPEACT (Package) ACT-Specific iPPE Objects
Basic Data
Data Element PPE_SCHED_BY_SUCC
Short Description Schedule Intervals According to Resource of Next Activity  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type XFELD    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name SCHED_BY_SUCC   
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Scheduling 
Medium 15 Scheduling 
Long 25 Schedule by Resource 
Heading 30 Schedule by Resource 
Documentation

Definition

Controls how the system interprets the times from the relationships when scheduling.

Use

When the indicator is set, the system interprets the intervals as a net time in accordance with the resource of the next activity. This option can be used to represent move times, for example.

When the indicator is not set, the system interprets the intervals as a gross time. This option can be used to represent wait times, for example.

History
Last changed by/on SAP  20040316 
SAP Release Created in 46C2