SAP ABAP Data Element PPE_SEQTIME_MIN (Minimum Interoperation Time)
Hierarchy
☛
EA-IPPE (Software Component) SAP iPPE
⤷ AP-PPE (Application Component) Integrated Product and Process Engineering
⤷ CPPEACT (Package) ACT-Specific iPPE Objects
⤷ AP-PPE (Application Component) Integrated Product and Process Engineering
⤷ CPPEACT (Package) ACT-Specific iPPE Objects
Basic Data
Data Element | PPE_SEQTIME_MIN |
Short Description | Minimum Interoperation Time |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | MENG13V | |
Data Type | QUAN | Quantity field, points to a unit field with format UNIT |
Length | 13 | |
Decimal Places | 3 | |
Output Length | 18 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | SEQTIME_MIN | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Min. Time |
Medium | 20 | Minimum Time |
Long | 22 | Min. Interop. Time |
Heading | 22 | Min. Interop. Time |
Documentation
Definition
Specifies the minimum interoperation time. The interoperation time includes the following time elements:
- The move time from one activity to the next
- The wait time after the execution of an activity
- Floats for the activity, such as the queue time, for example
- The float before production and float after production for an order
Use
The time specified is the minimum time that must pass before the next activity begins.
Dependencies
The takts are scheduled in APO when you work with Repetitive Manufacturing. The interoperation time is not taken into consideration.
The interoperation time is relevant for planning only for lead time scheduling. Scheduling problems can occur for configurable routings when not all activities of a process structure are selected due to the configuration.
History
Last changed by/on | SAP | 20040316 |
SAP Release Created in |