SAP ABAP Table DETAILABG (Detail list for evaluation in leveling)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       CY01 (Package) R/3 Application Development: Resource Planning
Basic Data
Table Category INTTAB    Structure 
Structure DETAILABG   Table Relationship Diagram
Short Description Detail list for evaluation in leveling    
Delivery and Maintenance
Pool/cluster      
Delivery Class      
Data Browser/Table View Maintenance     Display/Maintenance Allowed with Restrictions 
Components
     
Field Key Data Element Domain Data
Type
Length Decimal
Places
Short Description Check
table
1 KRUESOLL CY_KRUESOL KAPBED FLTP 16   16   Scheduled cap. requirements for the op. segment "setup"  
2 KRUEREST CY_KRUERES KAPBED FLTP 16   16   Remaining capacity rqmts. for operation segment "Setup"  
3 KBEASOLL CY_KBEASOL KAPBED FLTP 16   16   Process target capacity requirements for operation segment  
4 KBEAREST CY_KBEARES KAPBED FLTP 16   16   Remaining capacity rqmts.for operation segment "Processing"  
5 KABRSOLL CY_KABRSOL KAPBED FLTP 16   16   Scheduled cap. requirements for the op. segment teardown  
6 KABRREST CY_KABRRES KAPBED FLTP 16   16   Remaining capacity requirements for op. segment "tear down"  
7 KEINH CY_KEINH MEINS UNIT 3   0   Unit of of measure for displaying capacity requirements *
8 FSTAD FSTAD DATUM DATS 8   0   Earliest start / date  
9 FSTAU FSTAU T TIMS 6   0   Earliest start / time  
10 FENDD FENDD DATUM DATS 8   0   Earliest finish /date  
11 FENDU FENDU T TIMS 6   0   Earliest finish /time  
12 SSTAD SSTAD DATUM DATS 8   0   Latest start / date  
13 SSTAU SSTAU T TIMS 6   0   Latest start / time  
14 SENDD SENDD DATUM DATS 8   0   Latest finish / date  
15 SENDU SENDU T TIMS 6   0   Latest finish / time  
16 ISTAD ISTAD DATUM DATS 8   0   Actual start / date  
17 ISTAU ISTAU T TIMS 6   0   Actual start / time  
18 IENDD IENDD DATUM DATS 8   0   Actual finish / date  
19 IENDU IENDU T TIMS 6   0   Actual finish / time  
20 KPVER CR_VERTL CR_VERTL CHAR 8   0   Distribution of capacity requirements (Planned/prod.order) *
21 FSAVD CY_FSAVD DATUM DATS 8   0   Earliest scheduled start: Execution (date)  
22 FSAVZ CY_FSAVZ ATIME TIMS 6   0   Earliest scheduled start: Execution (time)  
23 FSSBD CY_FSSBD DATUM DATS 8   0   Earliest scheduled start: Processing (date)  
24 FSSBZ CY_FSSBZ ATIME TIMS 6   0   Earliest scheduled start: Processing (time)  
25 FSSAD CY_FSSAD DATUM DATS 8   0   Earliest scheduled start: Teardown (date)  
26 FSSAZ CY_FSSAZ ATIME TIMS 6   0   Earliest scheduled start: Teardown (time)  
27 FSEDD CY_FSEDD DATUM DATS 8   0   Earliest scheduled finish: Execution (date)  
28 FSEDZ CY_FSEDZ ATIME TIMS 6   0   Earliest scheduled finish: Execution (time)  
29 FSSLD CY_FSSLD DATUM DATS 8   0   Earliest scheduled start: Wait (date)  
30 FSSLZ CY_FSSLZ ATIME TIMS 6   0   Earliest scheduled start: Wait (time)  
31 FSELD CY_FSELD DATUM DATS 8   0   Earliest scheduled finish: Wait (date)  
32 FSELZ CY_FSELZ ATIME TIMS 6   0   Earliest scheduled finish: Wait (time)  
33 SSAVD CY_SSAVD DATUM DATS 8   0   Latest scheduled start: Execution (date)  
34 SSAVZ CY_SSAVZ ATIME TIMS 6   0   Latest scheduled start: Execution (time)  
35 SSSBD CY_SSSBD DATUM DATS 8   0   Latest scheduled start: Processing (date)  
36 SSSBZ CY_SSSBZ ATIME TIMS 6   0   Latest scheduled start: Processing (time)  
37 SSSAD CY_SSSAD DATUM DATS 8   0   Latest scheduled start: Teardown (date)  
38 SSSAZ CY_SSSAZ ATIME TIMS 6   0   Latest scheduled start: Teardown (time)  
39 SSEDD CY_SSEDD DATUM DATS 8   0   Latest scheduled finish: Execution (date)  
40 SSEDZ CY_SSEDZ ATIME TIMS 6   0   Latest scheduled finish: Execution (time)  
41 SSSLD CY_SSSLD DATUM DATS 8   0   Latest scheduled start: Wait time (date)  
42 SSSLZ CY_SSSLZ ATIME TIMS 6   0   Latest scheduled start: Wait time  
43 SSELD CY_SSELD DATUM DATS 8   0   Latest scheduled finish: Wait time (date)  
44 SSELZ CY_SSELZ ATIME TIMS 6   0   Latest scheduled finish: Wait time  
45 ISDD CY_ISDD DATUM DATS 8   0   Actual start: Execution (date)  
46 ISDZ CY_ISDZ ATIME TIMS 6   0   Actual start: Execution/setup (time)  
47 IERD CY_IERD DATUM DATS 8   0   Actual finish: Setup (date)  
48 IERZ CY_IERZ ATIME TIMS 6   0   Actual finish: Setup (time)  
49 ISBD CY_ISBD DATUM DATS 8   0   Actual start: Processing (date)  
50 ISBZ CY_ISBZ ATIME TIMS 6   0   Actual start: Processing (time)  
51 IEBD CY_IEBD DATUM DATS 8   0   Actual finish: Processing (date)  
52 IEBZ CY_IEBZ ATIME TIMS 6   0   Actual finish processing (time)  
53 ISAD CY_ISAD DATUM DATS 8   0   Actual start: Teardown (date)  
54 ISAZ CY_ISAZ ATIME TIMS 6   0   Actual start: Teardown (time)  
55 IEDD CY_IEDD DATUM DATS 8   0   Actual finish: Execution (date)  
56 IEDZ CY_IEDZ ATIME TIMS 6   0   Actual finish: Execution (time)  
57 WARTZ WARTEZEIT CX_ZEIT FLTP 16   16   Queue time used for scheduling  
58 WRTZE WTRZE EINHEIT UNIT 3   0   Unit of measure for queue time  
59 RUEST RUEST CX_ZEIT FLTP 16   16   Setup time  
60 RSTZE RSTZE EINHEIT UNIT 3   0   Unit of measure for setup time  
61 BEARZ BEARZEIT CX_ZEIT FLTP 16   16   Processing time  
62 BEAZE BEAZE EINHEIT UNIT 3   0   Unit of measure for processing time  
63 ABRUE ABRUE CX_ZEIT FLTP 16   16   Teardown  
64 ARUZE ARUZE EINHEIT UNIT 3   0   Unit of measure for teardown  
65 LIEGZ LIEGEZEIT CX_ZEIT FLTP 16   16   Wait time used for scheduling  
66 LIGZE LIGZE EINHEIT UNIT 3   0   Unit of measure for wait time  
67 TRANZ TRANSZEIT CX_ZEIT FLTP 16   16   Move time used for scheduling  
68 TRAZE TRAZE EINHEIT UNIT 3   0   Unit of measure for move time  
69 AUFNR AUFNR AUFNR CHAR 12   0   Order Number *
70 STLNR STNUM STNUM CHAR 8   0   Bill of Material  
71 DISPO CO_DISPO DISPO CHAR 3   0   MRP controller for the order *
72 FEVOR FEVOR FEVOR CHAR 3   0   Production Supervisor *
73 PVERW PLN_VERWE PLN_VERWE CHAR 3   0   Task list usage *
74 PLNAW PLNAW PLNAW CHAR 1   0   Application of the task list *
75 PLGRP VAGRP VAGRP CHAR 3   0   Responsible planner group/department *
76 FTRMP CO_FTRMP DATUM DATS 8   0   Planned release date  
77 GLTRP CO_GLTRP DATUM DATS 8   0   Basic finish date  
78 GSTRP CO_GSTRP DATUM DATS 8   0   Basic start date  
79 FTRMS CO_FTRMS DATUM DATS 8   0   Scheduled release date  
80 GLTRS CO_GLTRS DATUM DATS 8   0   Scheduled finish  
81 GSTRS CO_GSTRS DATUM DATS 8   0   Scheduled start  
82 GSTRI CO_GSTRI DATUM DATS 8   0   Actual start date  
83 GLTRI CO_GLTRI DATUM DATS 8   0   Actual finish date  
84 FTRMI CO_FTRMI DATUM DATS 8   0   Actual release date  
85 GAMNG CY_GAMNG MENG13 QUAN 13   3   Order quantity  
86 GMEIN MEINS MEINS UNIT 3   0   Base Unit of Measure *
87 APRIO CO_APRIO CHAR1 CHAR 1   0   Order priority  
88 AUART CY_AUFART AUFART CHAR 4   0   Category of pegged requirement *
89 AUTYP AUFTYP AUFTYP NUMC 2   0   Order category  
90 REFNR AUFREFNR AUFNR CHAR 12   0   Reference order number *
91 KTEXT CY_AUFTEXT TEXT40 CHAR 40   0   Short text for order  
92 BUKRS BUKRS BUKRS CHAR 4   0   Company Code *
93 GSBER GSBER GSBER CHAR 4   0   Business Area *
94 KOKRS KOKRS CACCD CHAR 4   0   Controlling Area *
95 CCKEY CCKEY CCKEY CHAR 23   0   Cost collector key  
96 PRONR PS_PSPID PS_PSPID CHAR 24   0   Project definition  
97 PROJN PS_POSID PS_POSID CHAR 24   0   Work Breakdown Structure Element (WBS Element)  
98 RUECK CY_RUECK CO_RUECK NUMC 10   0   Completion confirmation number for the operation  
99 CY_SEQNR CY_SEQNR CY_SEQNR NUMC 14   0   Seq. number order  
100 CY_SEQNRV CY_SEQNRV CY_SEQNR NUMC 14   0   Sequence number operation  
101 EQUNR EQUNR EQUNR CHAR 18   0   Equipment Number *
102 TPLNR TPLNR TPLNR CHAR 30   0   Functional Location *
103 QUALF QUALF QUALF CHAR 2   0   Suitability *
104 BAUTL BAUTL MATNR CHAR 18   0   Assembly *
105 ILOAN ILOAN ILOAN CHAR 12   0   Location and account assignment for technical object *
106 IWERK IWERK WERKS CHAR 4   0   Maintenance Planning Plant *
107 INGPR INGRP INGRP CHAR 3   0   Planner Group for Customer Service and Plant Maintenance *
108 APGRP VAGRP VAGRP CHAR 3   0   Responsible planner group/department *
109 KUNUM KUNUM KUNNR CHAR 10   0   Customer Number *
110 ANLBD ANLBD DATUM DATS 8   0   Date until which the system is available  
111 WARPL WARPL WARPL CHAR 12   0   Maintenance Plan *
112 LAUFN LAUFN AUFNR CHAR 12   0   Order number *
113 QMNUM QMNUM QMNUM CHAR 12   0   Message Number *
114 VAWRK WERGW WERKS CHAR 4   0   Plant associated with main work center *
115 VAPLZ GEWRK ARBPL CHAR 8   0   Main work center for maintenance tasks  
116 VATXT AP_KTEXT TEXT40 CHAR 40   0   Short text for the work center  
117 INNAM INNAM TEXT18 CHAR 18   0   Name of the Maintenance Planner Group  
118 KDAUF KDAUF VBELN CHAR 10   0   Sales Order Number *
119 KDPOS CO_KDPOS POSNR NUMC 6   0   Sales order item *
120 LGORT LGORT_D LGORT CHAR 4   0   Storage location *
121 VERID VERID VERID CHAR 4   0   Production Version *
122 CHARG CHARG_D CHARG CHAR 10   0   Batch Number *
123 NAME1 CY_NAME1 NAME CHAR 35   0   Name of the customer for the customer order  
124 PLNFL PLNFOLGE PLNFOLGE CHAR 6   0   Sequence  
125 PLNTY PLNTY PLNTY CHAR 1   0   Task List Type *
126 VORNR CY_VORNR CHAR4 CHAR 4   0   Operation number  
127 UVORN CY_UVORN CHAR4 CHAR 4   0   Sub-operation  
128 LTXA1 LTXA1 TEXT40 CHAR 40   0   Operation short text  
129 LOART LOHNART LOART CHAR 4   0   Wage type  
130 MGVRG MGVRG MENG13 QUAN 13   3   Operation Quantity  
131 MEINH VORME MEINS UNIT 3   0   Unit of measure for activity *
132 RFGRP RUEFAGRP RUEFAGRP CHAR 10   0   Setup group category *
133 RFSCH RUEFASCHLU RUEFASCHLU CHAR 10   0   Setup group key *
134 RASCH RUEARSCHLU RUEARSCHLU CHAR 2   0   Setup Type Key *
135 ARBEI ARBEIT ARBEIT QUAN 7   1   Work involved in the activity  
136 ARBEH ARBEITE MEINS UNIT 3   0   Unit for work *
137 PSTXTTI TXTTI CHAR20 CHAR 20   0   PS text description  
138 DAUNO DAUNOR DAUER_4_1 QUAN 5   1   Normal duration of the activity  
139 DAUNE DAUNORE MEINS UNIT 3   0   Normal duration/unit *
140 EWDAN EWDAN DAUER_4_1 QUAN 5   1   Normal duration (from forecast) of activity  
141 EWDNE EWDNE MEINS UNIT 3   0   Unit for forecast normal duration *
142 OFMNW OFMNW ARBEIT QUAN 7   1   Forecasted work (actual + remaining)  
143 ASVRG ASVRG MENG13 QUAN 13   3   Operation scrap  
144 VGE01 VGWRTEH MEINS UNIT 3   0   Unit of measure for the standard value *
145 VGW01 VGWRT VGWRT QUAN 9   3   Standard Value  
146 VGE02 VGWRTEH MEINS UNIT 3   0   Unit of measure for the standard value *
147 VGW02 VGWRT VGWRT QUAN 9   3   Standard Value  
148 VGE03 VGWRTEH MEINS UNIT 3   0   Unit of measure for the standard value *
149 VGW03 VGWRT VGWRT QUAN 9   3   Standard Value  
150 VGE04 VGWRTEH MEINS UNIT 3   0   Unit of measure for the standard value *
151 VGW04 VGWRT VGWRT QUAN 9   3   Standard Value  
152 VGE05 VGWRTEH MEINS UNIT 3   0   Unit of measure for the standard value *
153 VGW05 VGWRT VGWRT QUAN 9   3   Standard Value  
154 VGE06 VGWRTEH MEINS UNIT 3   0   Unit of measure for the standard value *
155 VGW06 VGWRT VGWRT QUAN 9   3   Standard Value  
156 USR04 USRQUAN13 USRQUAN13 QUAN 13   3   User field for quantity (length 10.3)  
157 USE04 USRUNIT MEINS UNIT 3   0   User field: Unit for quantity fields *
158 USR05 USRQUAN13 USRQUAN13 QUAN 13   3   User field for quantity (length 10.3)  
159 USE05 USRUNIT MEINS UNIT 3   0   User field: Unit for quantity fields *
160 PLNUM PLNUM PLNUM CHAR 10   0   Planned order number *
161 MATNR CYMATNR MATNR CHAR 18   0   Material in planned order *
162 PLWRK PLWRK WERKS CHAR 4   0   Planning Plant *
163 PWWRK PWWRK WERKS CHAR 4   0   Production plant in planned order *
164 PAART CY_PAART PAART CHAR 4   0   Type of planned order  
165 GSMNG GSMNG MENG13 QUAN 13   3   Total planned order quantity  
166 MEINS MEINS MEINS UNIT 3   0   Base Unit of Measure *
167 SERNR SERNR SERNR CHAR 8   0   BOM explosion number *
168 PLSCN PLSCN PLSCN NUMC 3   0   Planning Scenario of Long-Term Planning *
169 KAPFX KAPFX XFELD CHAR 1   0   Indicator: capacity for planned order dispatched  
170 SEQNR CY_SEQNR CY_SEQNR NUMC 14   0   Seq. number order  
171 ABKRS AUFABKRS AKREIS NUMC 2   0   Processing group *
172 KOSTL AUFKOSTL KOSTL CHAR 10   0   Cost center for basic settlement *
173 PSTTR CY_PSTTR DATUM DATS 8   0   Basic start in planned order  
174 PEDTR CY_PEDTR DATUM DATS 8   0   Basic date in planned order  
175 PERNR PERNR_D PERNR NUMC 8   0   Personnel Number  
176 OTYPE OTYPE OTYPE CHAR 2   0   Object Type *
177 ORGEH ORGEH ORGEH NUMC 8   0   Organizational Unit *
178 ORGEH_TXT CYSTEXT TEXT40 CHAR 40   0   Description of organizational unit  
179 BEGDA BEGDA DATUM DATS 8   0   Start Date  
180 ENDDA ENDDA DATUM DATS 8   0   End Date  
181 PLANS HROBJID HROBJID NUMC 8   0   Object ID *
182 PLANS_TXT CYPLANS TEXT40 CHAR 40   0   Position name  
183 STELL STELL STELL NUMC 8   0   Job *
184 STELL_TXT CYSTELL TEXT40 CHAR 40   0   Description of position key  
185 ENAME EMNAM TEXT40 CHAR 40   0   Formatted Name of Employee or Applicant  
186 TITEL TITEL TITEL CHAR 15   0   Title *
187 GBDAT GBDAT GBDAT DATS 8   0   Date of Birth  
188 FAMST FAMST FAMST CHAR 1   0   Marital Status Key *
189 PSTLZ PSTLZ PSTLZ CHAR 10   0   Postal Code  
190 ORT01 ORT01 TEXT25 CHAR 25   0   City  
191 STRAS STRAS TEXT30 CHAR 30   0   House number and street  
192 ANRED ANRDE ANRDE CHAR 1   0   Form-of-Address Key *
193 NATIO NATSL LAND1 CHAR 3   0   Nationality *
194 VERWE AP_VERWE AP_VERWE CHAR 4   0   Work Center Category *
195 VERAN AP_VERAN AP_VERAN CHAR 3   0   Person responsible for the work center *
196 MATYP MATYP MATYP CHAR 10   0   Machine type *
197 ARBPLTEXT ARBPLTEXT TEXT40 CHAR 40   0   Text describing work center in more detail  
198 AZMAX KAPANZAHL KAPANZAHL INT2 5   0   Number of individual capacities  
199 KAPARTEXT KAPTEXT TEXT40 CHAR 40   0   Capacity short text  
200 NAME KAPNAME KAPNAME CHAR 8   0   Capacity name  
201 PLANR KAPPLANER KAPPLANER CHAR 3   0   Capacity planner group *
202 POOLK KAP_KZPOOL XFELD CHAR 1   0   Indicator for pooled capacity  
203 MEHR KAP_MEHR XFELD CHAR 1   0   Has individual capacities  
204 BEDARF CY_BEDARF MENG15 QUAN 15   3   Capacity requirements  
205 LIEINH CY_KEINH MEINS UNIT 3   0   Unit of of measure for displaying capacity requirements *
206 VRG_ARBPL VRG_ARBPL ARBPL CHAR 8   0   Work center of the operation  
207 VRG_ARBPLT VRG_ARBPLT TEXT40 CHAR 40   0   Work center text of sub-operation  
208 STATUS STATUS_TXT STATUS_TXT CHAR 4   0   Text of order status  
209 STATUV STATUV_TXT STATUV_TXT CHAR 4   0   Text for the status of an operation or a network activity  
210 MATTEXT MAKTX TEXT40 CHAR 40   0   Material description  
211 ANGEB CY_ANGEB MENG13 QUAN 13   3   Available capacity as field of type P  
212 LIEINHA CY_KEINH MEINS UNIT 3   0   Unit of of measure for displaying capacity requirements *
213 BED_VERUR BED_VERUR AUFNR CHAR 12   0   Pegged requirements (work- or planned order) as type char. *
214 BED_MENGE BED_GSMNG MENG13 QUAN 13   3   Order quantity displayed in a list  
215 BED_EINH CY_KEINH MEINS UNIT 3   0   Unit of of measure for displaying capacity requirements *
216 STTXT CO_STTXT CHAR40 CHAR 40   0   System Status  
History
Last changed by/on SAP  20110901 
SAP Release Created in