Data Element list used by SAP ABAP Table TCX00 (Scheduling: Planning Levels and Control Parameters)
SAP ABAP Table
TCX00 (Scheduling: Planning Levels and Control Parameters) is using
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
![]() |
![]() |
|||
1 | ![]() |
APLS1 | Selection ID (detailed planning) | |
2 | ![]() |
APLS1_2 | Selection ID for routing (detailed planning, medium term) | |
3 | ![]() |
APLS1_3 | Selection ID for routing (detailed planning, long term) | |
4 | ![]() |
APLS2 | Selection ID (rate-based planning) | |
5 | ![]() |
APLS3 | Selection ID (rough-cut planning) | |
6 | ![]() |
AUFTA | Order type in capacity planning | |
7 | ![]() |
AUFTG | Order group for capacity planning | |
8 | ![]() |
AUF_SHIFT | Indicator: Shift order/network | |
9 | ![]() |
BREAKS | Indicator: Scheduling allowing for breaks | |
10 | ![]() |
CMACT | Assignment Material Staging Operation Segment | |
11 | ![]() |
DADJ1 | Scheduling level for adjusting basic dates | |
12 | ![]() |
DADJ2 | Adjust dates in lead time scheduling | |
13 | ![]() |
DADJ3 | Adjusting dates when dispatching planned orders | |
14 | ![]() |
FEVOR | Production Supervisor | |
15 | ![]() |
GROHR | Rough-cut planning horizon | |
16 | ![]() |
KAPKX | Indicator: Generate capacity reqmts (detailed planning) | |
17 | ![]() |
KAPKX_2 | Create capacity requirements (detailed planning,medium term) | |
18 | ![]() |
KAPKX_3 | Create capacity requirements (detailed planning, long term) | |
19 | ![]() |
KAPKX_GROB | Create capacity requirements (rough-cut planning) | |
20 | ![]() |
KAPKX_RATE | Create capacity requirements (rate-based planning) | |
21 | ![]() |
LAGE_FR | Latest date for material staging | |
22 | ![]() |
LINE_TERM | Takt time-/rate-based scheduling of planned order | |
23 | ![]() |
MANDT | Client | |
24 | ![]() |
PHORI | Scheduling horizon (detailed planning) | |
25 | ![]() |
PHORI_2 | Scheduling horizon (detailed planning, medium term) | |
26 | ![]() |
PHORI_3 | Scheduling horizon (detailed planning, long term) | |
27 | ![]() |
PROD_DATES | Scheduling based on production dates | |
28 | ![]() |
PROT_AUTO | Display scheduling log automatically | |
29 | ![]() |
RATHR | Rate-based planning horizon | |
30 | ![]() |
REDST_MAX | Maximum reduction level | |
31 | ![]() |
REDVS_S1 | Red. of floats before and after production (%) | |
32 | ![]() |
REDVS_S2 | Reduction level 2: Red. of floats bef./after prod. (in %) | |
33 | ![]() |
REDVS_S3 | Reduction level 3: Red. of floats bef./aft. prod. (in %) | |
34 | ![]() |
REDVS_S4 | Reduction level 4: Red. of floats bef./aft. prod. (in %) | |
35 | ![]() |
REDVS_S5 | Reduction level 5: Red. of floats bef./aft. prod. (in %) | |
36 | ![]() |
REDVS_S6 | Reduction level 6: Red. of floats bef./aft. prod. (in %) | |
37 | ![]() |
RED_ART | Reduction type | |
38 | ![]() |
STVERG | Maximum number of days start date can be in the past | |
39 | ![]() |
TERMKZ | Scheduling type | |
40 | ![]() |
TERMX | Lead time scheduling (detailed planning) | |
41 | ![]() |
TERMX_2 | Lead time scheduling (detailed planning, medium term) | |
42 | ![]() |
TERMX_3 | Lead time scheduling (detailed planning, long term) | |
43 | ![]() |
TERMX_GROB | Lead time scheduling (rough-cut planning) | |
44 | ![]() |
TERMX_RATE | Lead time scheduling (rate-based planning) | |
45 | ![]() |
TERM_AUTO | Indicator: Calculate dates automatically during saving | |
46 | ![]() |
TERM_KPER | Rescheduling in Workforce Planning | |
47 | ![]() |
WERKS_D | Plant |