Data Element list used by SAP ABAP Table ICH_MDPS_STR (Item MRP Document for RSMIPROACT)
SAP ABAP Table ICH_MDPS_STR (Item MRP Document for RSMIPROACT) is using
# Object Type Object Name Object Description Note
     
1 Data Element  ABEKZ Exception indicator
2 Data Element  AENNR Change Number
3 Data Element  AKTAL Current explosion available
4 Data Element  AKTFT Indicator "Detailed scheduling available"
5 Data Element  AKTFT Indicator "Detailed scheduling available"
6 Data Element  AKTGT Indicator: "rough-cut scheduling available"
7 Data Element  ARSNR Settlement reservation number
8 Data Element  ARSPS Item number of the settlement reservation
9 Data Element  AUFTM MRP element: order quantity
10 Data Element  AUFVR Source number for order
11 Data Element  AUSSL Exception message key
12 Data Element  AUTET Source List Usage in Materials Planning
13 Data Element  BAART P.O./Order type
14 Data Element  BAUGR Material number of higher-level assembly
15 Data Element  BEDAT Purchase Order Date
16 Data Element  BEDID ID of the capacity requirements record
17 Data Element  BERID MRP Area
18 Data Element  BESKZ Procurement Type
19 Data Element  BSTYP Purchasing document category
20 Data Element  CHARG_D Batch Number
21 Data Element  CIM_COUNT Internal counter
22 Data Element  CS_KZNFP Indicator: Follow-Up Item
23 Data Element  CS_NFEAG Discontinuation Group
24 Data Element  CS_NFGRP Follow-Up Group
25 Data Element  CUOBJ Configuration (internal object number)
26 Data Element  DAT00 Receipt/Requirements date
27 Data Element  DAT01 Delivery/order finish date
28 Data Element  DAT02 Start/release date
29 Data Element  DAT03 Opening date
30 Data Element  DBSKZ Direct procurement indicator
31 Data Element  DEL12 MRP element number
32 Data Element  DELB0 Abbreviation for MRP element
33 Data Element  DELET Scheduling number planning element
34 Data Element  DELKZ MRP element
35 Data Element  DELKZ MRP element
36 Data Element  DELNR MRP element number
37 Data Element  DELPS MRP element item
38 Data Element  DZUVKZ Consumption indicator
39 Data Element  EBELN Purchasing Document Number
40 Data Element  EBELP Item Number of Purchasing Document
41 Data Element  EDGNO Internal number for edge of object dependencies tree
42 Data Element  EINVR Source schedule line number
43 Data Element  EKGRP Purchasing group
44 Data Element  EKORG Purchasing organization
45 Data Element  EMATN Material number corresponding to manufacturer part number
46 Data Element  ERFME Unit of entry
47 Data Element  ERFMG Quantity in unit of entry
48 Data Element  ESOBS Special procurement - external display
49 Data Element  ETMEN Scheduled Quantity
50 Data Element  EXTNL Indicator for External Procurement
51 Data Element  FIX01 Indicator: Fixing of Lot Size in Planned Order
52 Data Element  FIX02 Indicator: fixing explosion in planned order
53 Data Element  FRTHW Production note in the planned order
54 Data Element  GLMNG Quantity Delivered (Stock Transfer)
55 Data Element  GROER Scheduling error in rough scheduling
56 Data Element  GROID Index for rough scheduling results
57 Data Element  KAPFX Indicator: capacity for planned order dispatched
58 Data Element  KDAUF Sales Order Number
59 Data Element  KDPOS Item number in Sales Order
60 Data Element  KNTTP Account assignment category
61 Data Element  KUNNR Customer Number
62 Data Element  KZAUS Discontinuation indicator
63 Data Element  KZBWS Valuation of Special Stock
64 Data Element  KZVBR Consumption posting
65 Data Element  LGORT_D Storage location
66 Data Element  LIFNR Account Number of Vendor or Creditor
67 Data Element  LSOBS Special procurement type at storage location level
68 Data Element  MATKL Material Group
69 Data Element  MATNR Material Number
70 Data Element  MDFST Production order status: internal ind. for MRP
71 Data Element  MDLOC Location of MRP Element
72 Data Element  MDMNG MRP: quantity field (stock in transit, receipt qty, ...)
73 Data Element  MD_ADINF Field for Additional Information
74 Data Element  MD_LVSCHED Planned order: leading scheduling level (determines dates)
75 Data Element  MD_PERKZ Period indicator
76 Data Element  MD_PRSCHED Planned order: scheduling using production dates
77 Data Element  MD_STAEX Status information on BOM explosion in planned order
78 Data Element  MNG01 Quantity received or quantity required
79 Data Element  MNG02 Variable scrap quantity
80 Data Element  MNG03 Shortage Quantity
81 Data Element  MNG04 ATP quantity
82 Data Element  MONKZ Indicator: for assembly order procedures
83 Data Element  NAFKZ Indicator: follow-up material active/not active
84 Data Element  NFMAT Follow-up material
85 Data Element  NFMNG Follow-up quantity
86 Data Element  OLDSL Key of the second exception message
87 Data Element  PALTR Explosion date
88 Data Element  PBDNR Requirements Plan Number
89 Data Element  PEDTI End Time of Planned Order
90 Data Element  PLAAB Material requirements planning segment
91 Data Element  PLANR Planning segment number
92 Data Element  PLART Planning type
93 Data Element  PLIFZ Planned delivery time in days
94 Data Element  PLUMI Receipt/issue indicator
95 Data Element  PLUMS Conversion indicator for planned order
96 Data Element  PLWRK Planning Plant
97 Data Element  POSVR Source item number
98 Data Element  PRIO_REQ Requirement Priority
99 Data Element  PRIO_URG Requirement Urgency
100 Data Element  PRNKZ Ind.: Leading order in collective order is planned ordre
101 Data Element  PRPER Forecast period
102 Data Element  PSTMP Last Change to Planned Order: Time Stamp
103 Data Element  PSTTI Start Time of Planned Order
104 Data Element  PS_POSNR WBS Element
105 Data Element  PWWRK Production plant in planned order
106 Data Element  QUNUM Number of quota arrangement
107 Data Element  QUPOS Quota arrangement item
108 Data Element  RATER Scheduling error in scheduling production rates
109 Data Element  RATID Index for the results of scheduling production rates
110 Data Element  RDMNG Excess stock quantity
111 Data Element  RESLO Issuing Storage Location for Stock Transport Order
112 Data Element  REVLV Revision level
113 Data Element  RSART Record type
114 Data Element  RSNUM Number of reservation/dependent requirements
115 Data Element  SA_AUFNR Run schedule header number
116 Data Element  SA_VERTO Distribution key for quantity produced
117 Data Element  SERNR BOM explosion number
118 Data Element  SOBES Special procurement type
119 Data Element  SOBKZ Special Stock Indicator
120 Data Element  SORT1 Sort indicator 01
121 Data Element  SORT2 Sort indicator 02
122 Data Element  SRM_CONTRACT_ID Central Contract
123 Data Element  SRM_CONTRACT_ITEM Central Contract Item Number
124 Data Element  STALT Alternative BOM
125 Data Element  STLAN BOM Usage
126 Data Element  STLKN BOM Item Node Number
127 Data Element  STLST BOM Statuses
128 Data Element  STLTY BOM Category
129 Data Element  STNUM Bill of Material
130 Data Element  TAG00 Daily shift (sort indicator 0)
131 Data Element  TECHS Parameter Variant/Standard Variant
132 Data Element  TPQTY Overall quantity MRP element (for static pegging)
133 Data Element  TRMER Scheduling error
134 Data Element  UKZ01 Indicator: MRP element can be brought forward
135 Data Element  UMDAT Rescheduling date
136 Data Element  UMDAT Rescheduling date
137 Data Element  UMREN Denominator for conversion to base units of measure
138 Data Element  UMREZ Numerator for Conversion to Base Units of Measure
139 Data Element  VERID Production Version
140 Data Element  VERSB Version number for independent requirements
141 Data Element  VERVP Consumption indicator for planning requirements
142 Data Element  VPZUO Allocation Indicator
143 Data Element  VRFKZ Availability indicator
144 Data Element  VRPLA Indicator: planning without final assembly
145 Data Element  VSTAT_D Processing Status
146 Data Element  WAMNG Issued quantity
147 Data Element  WEBAZ Goods receipt processing time in days
148 Data Element  WERKS_D Plant
149 Data Element  XFEHL Pre-allocated stock