SAP ABAP Data Element CS_NFGRP (Follow-Up Group)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM-MD-PRO (Application Component) Products
     CS (Package) R/3 Application development: PP Bills of Material
Basic Data
Data Element CS_NFGRP
Short Description Follow-Up Group  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type CHAR2    
Data Type CHAR   Character String 
Length 2    
Decimal Places 0    
Output Length 2    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name NEXT_GRP   
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Fol. Group 
Medium 15 Follow-Up Group 
Long 20 Follow-Up Group 
Heading FolGp 
Documentation

Definition

This is a freely-definable character string which is assigned to linked follow-up items in a bill of material. The follow-up group shows which follow-up item(s) are to replace the item to be discontinued.

Use

You can control the discontinuation in the following way:

  • Simple discontinuation
    • Settings in the material master record (MRP 4 view):
    • The discontinuation indicator value 1 is set In the material master record of the material to be discontinued.
    • Settings in the BOM:
    • The value of the follow-up group of the item to be introduced and the discontinuation group of the item to be discontinued must be the same.
  • Dependent parallel discontinuation

    One group of materials is replaced by another group of materials. When an item (main item) is discontinued, another item (dependent item) is also discontinued.

    • Settings in the material master record (materials planning):
      Material of the main item to be discontinued: discontinuation indicator value 1
      Material of the dependent item: value 3
    • Settings in the BOM:
      The main item and the dependent parallel item to be discontinued are identified by the same discontinuation group.
      The value of the follow-up group of the item to be introduced and the discontinuation group of the item to be discontinued must be the same.

Procedure

You can only maintain an item as a follow-up item when you enter it for the first time. The field value cannot be changed after you have entered and saved the item.

Dependencies

The follow-up item(s) that are to replace the item to be discontinued must have the same value in the Discontinuation group field as the item to be discontinued has in the Follow-up group field (see the example below).
The follow-up item defined in the BOM overrides any follow-up material defined in the material master record.

You can only maintain the follow-up group for one item if:

  • the component is planned to a schedule (for example, a warehouse item)
  • the base unit of measure of the materials is identical

Examples

  1. Example of a simple discontinuationf

Item 0010 to be discontinued (material M-1) is replaced by item 0010 to be introduced (material M-2).

Discontinuation indicator in the material master record M-1: value 1

Item    Material    Discontinuation group    Follow-up group

0010    M-1    A1    -

0010    M-2    -    A1

  1. Example of a parallel discontinuation

the items 0010 (material M-1) and 0011 (material M-2) are replaced by the items 0010 (material M-3) and 0011 (material M-4) to be ntroduced.

Discontinuation indicator in the material master record:

  • M-1: Value 1 (main discontinued item)
  • M-2: Value 3 (dependent discontinued item)

Item    Material    Discontinuation group    Follow-up group

0010    M-1    A1    -

0011    M-2    A1    -

0010    M-3    -    A1

0011    M-4    -    A1

Abbreviations:

Item.        Item

Mat.        Material

DisconGrp        Discontinuation group

FollGrp.        Follow-up group

History
Last changed by/on SAP  19991102 
SAP Release Created in