SAP ABAP Data Element PRIO_URG (Requirement Urgency)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM-MSA (Application Component) Mobile Sales
     CDB (Package) new CDB tables for new BDocs for CRM 3.0
Basic Data
Data Element PRIO_URG
Short Description Requirement Urgency  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type PRIO_URG    
Data Type NUMC   Character string with only digits 
Length 2    
Decimal Places 0    
Output Length 2    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 ReqmtUrgcy 
Medium 15 Reqmt Urgency 
Long 20 Requirement Urgency 
Heading 19 Requirement Urgency 
Documentation

Definition

Is used to prioritize material requisitions in detail.

In Customizing, you assign specific requirement urgency groups to requirement urgencies and therefore define how the system determines the overall priority of a material requirement by means of the requirement urgency group and organizational priority.

You can assign the requirement urgency in purchase requisitions, purchase orders, and reservations at item level. Depending on the requirement urgency you assigned, the system determines the requirement priority (overall priority) of a material requirement.

This also applies to purchase requisitions and reservations that are implemented as requirement coverage elements within requirements planning. The requirements themselves are not prioritized. Subsequent changes to the priorities do not result in requirements planning being carried out again for the relevant materials.

Use

Dependencies

Example

History
Last changed by/on SAP  20070729 
SAP Release Created in 520