SAP ABAP Data Element DAT00 (Receipt/Requirements date)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM (Application Component) Customer Relationship Management
⤷
CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷
MD01 (Package) Appl. dev. R/3 consumption driven gen. requirements planning
⤷
⤷
⤷
Basic Data
| Data Element | DAT00 |
| Short Description | Receipt/Requirements date |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | DATUM | |
| Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
| Length | 8 | |
| Decimal Places | 0 | |
| Output Length | 10 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | AVAIL_DATE | |
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Date |
| Medium | 15 | Planned dates |
| Long | 20 | Date |
| Heading | 8 | Date |
Documentation
Definition
Date which is relevant for Material Requirements Planning and which, depending on the MRP element in question, indicates:
- When a material receipt occurs
- When a material requirement exists.
Dependencies
The requirements or receipt dates of the requirement or receipt elements can be displayed in color in the order report as follows:
- Red (= Requirements date smaller than receipt date)
The receipt date lies after the requirements date. - Yellow (= Requirements/receipt date smaller than current date)
The requirements/receipt date lies in the past.
The colors used are independent of the settings that you have made for exception messages in the profile.
History
| Last changed by/on | SAP | 20040223 |
| SAP Release Created in |