SAP ABAP View V_TCX00_SOP (Specify scheduling parameters)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷
PP-CRP-SCH (Application Component) Scheduling
⤷
CX0C (Package) Customizing scheduling

⤷

⤷

Basic Data
View Type | C | Maintenance View |
Maintenance View | V_TCX00_SOP | |
Short Description | Specify scheduling parameters | |
Root table | TCX00 | Scheduling: Planning Levels and Control Parameters |
Table
# | Table Name | Foreign Table | Foreign Field | Foreign DIR |
---|---|---|---|---|
1 | ![]() |
TCX00 | ||
2 | ![]() |
TCX00 | WERKS | E |
3 | ![]() |
TCX00 | VAGRP | E |
4 | ![]() |
TCX00 | TERMKZ | E |
5 | ![]() |
T482 | TERMKZ | I |
Join Conditions
# | Table Name | Field Name | Negation | Operator | Constants | Cont. line | AND/OR | Offset | F Length | Mco Field |
---|---|---|---|---|---|---|---|---|---|---|
1 | ![]() |
AUFTG | EQ | '1' | 0 | 0 | ||||
View Fields
# | View field | Table | Field | Maintenance Flag | Key | Data element | Mod | Short Description |
---|---|---|---|---|---|---|---|---|
1 | ![]() |
![]() |
MANDT | MANDT | Client | |||
2 | ![]() |
![]() |
WERKS | WERKS_D | Plant | |||
3 | ![]() |
![]() |
AUFTG | AUFTG | Order group for capacity planning | |||
4 | ![]() |
![]() |
AUFTA | AUFTA | Order type in capacity planning | |||
5 | ![]() |
![]() |
VAGRP | FEVOR | Production Supervisor | |||
6 | ![]() |
![]() |
NAME1 | R | NAME1 | Name | ||
7 | ![]() |
![]() |
TXT | R | TXT_FEVOR | Description of production scheduler | ||
8 | ![]() |
![]() |
PHORI | PHORI | Scheduling horizon (detailed planning) | |||
9 | ![]() |
![]() |
APLS1 | APLS1 | Selection ID (detailed planning) | |||
10 | ![]() |
![]() |
TERM1 | TERMX | Lead time scheduling (detailed planning) | |||
11 | ![]() |
![]() |
KAPK1 | KAPKX | Indicator: Generate capacity reqmts (detailed planning) | |||
12 | ![]() |
![]() |
PHORI_2 | PHORI_2 | Scheduling horizon (detailed planning, medium term) | |||
13 | ![]() |
![]() |
APLS1_2 | APLS1_2 | Selection ID for routing (detailed planning, medium term) | |||
14 | ![]() |
![]() |
TERM1_2 | TERMX_2 | Lead time scheduling (detailed planning, medium term) | |||
15 | ![]() |
![]() |
KAPK1_2 | KAPKX_2 | Create capacity requirements (detailed planning,medium term) | |||
16 | ![]() |
![]() |
PHORI_3 | PHORI_3 | Scheduling horizon (detailed planning, long term) | |||
17 | ![]() |
![]() |
APLS1_3 | APLS1_3 | Selection ID for routing (detailed planning, long term) | |||
18 | ![]() |
![]() |
KAPK1_3 | KAPKX_3 | Create capacity requirements (detailed planning, long term) | |||
19 | ![]() |
![]() |
TERM1_3 | TERMX_3 | Lead time scheduling (detailed planning, long term) | |||
20 | ![]() |
![]() |
RATHR | RATHR | Rate-based planning horizon | |||
21 | ![]() |
![]() |
APLS2 | APLS2 | Selection ID (rate-based planning) | |||
22 | ![]() |
![]() |
TERM2 | TERMX_RATE | Lead time scheduling (rate-based planning) | |||
23 | ![]() |
![]() |
KAPK2 | KAPKX_RATE | Create capacity requirements (rate-based planning) | |||
24 | ![]() |
![]() |
GROHR | GROHR | Rough-cut planning horizon | |||
25 | ![]() |
![]() |
APLS3 | APLS3 | Selection ID (rough-cut planning) | |||
26 | ![]() |
![]() |
TERM3 | TERMX_GROB | Lead time scheduling (rough-cut planning) | |||
27 | ![]() |
![]() |
KAPK3 | KAPKX_GROB | Create capacity requirements (rough-cut planning) | |||
28 | ![]() |
![]() |
DADJ1 | DADJ1 | Scheduling level for adjusting basic dates | |||
29 | ![]() |
![]() |
DADJ2 | DADJ2 | Adjust dates in lead time scheduling | |||
30 | ![]() |
![]() |
DADJ3 | DADJ3 | Adjusting dates when dispatching planned orders | |||
31 | ![]() |
![]() |
TERMKZ | TERMKZ | Scheduling type | |||
32 | ![]() |
![]() |
TXT | R | TERMKZ_TXT | Description of scheduling type | ||
33 | ![]() |
![]() |
TERM_AUTO | TERM_AUTO | Indicator: Calculate dates automatically during saving | |||
34 | ![]() |
![]() |
PROT_AUTO | PROT_AUTO | Display scheduling log automatically | |||
35 | ![]() |
![]() |
STVERG | STVERG | Maximum number of days start date can be in the past | |||
36 | ![]() |
![]() |
MATFRUEH | LAGE_FR | Latest date for material staging | |||
37 | ![]() |
![]() |
BREAKS | BREAKS | Indicator: Scheduling allowing for breaks | |||
38 | ![]() |
![]() |
PROD_DATES | PROD_DATES | Scheduling based on production dates | |||
39 | ![]() |
![]() |
AUF_SHIFT | AUF_SHIFT | Indicator: Shift order/network | |||
40 | ![]() |
![]() |
REDST_MAX | REDST_MAX | Maximum reduction level | |||
41 | ![]() |
![]() |
REDVS_S1 | REDVS_S1 | Red. of floats before and after production (%) | |||
42 | ![]() |
![]() |
REDVS_S2 | REDVS_S2 | Reduction level 2: Red. of floats bef./after prod. (in %) | |||
43 | ![]() |
![]() |
REDVS_S3 | REDVS_S3 | Reduction level 3: Red. of floats bef./aft. prod. (in %) | |||
44 | ![]() |
![]() |
REDVS_S4 | REDVS_S4 | Reduction level 4: Red. of floats bef./aft. prod. (in %) | |||
45 | ![]() |
![]() |
REDVS_S5 | REDVS_S5 | Reduction level 5: Red. of floats bef./aft. prod. (in %) | |||
46 | ![]() |
![]() |
REDVS_S6 | REDVS_S6 | Reduction level 6: Red. of floats bef./aft. prod. (in %) | |||
Maintenance Status
read only |
read and change |
Time-dependent views: like U, validity data like ' ' |
read, change, delete and insert |
Delivery Class | C | Customizing table, maintenance only by cust., not SAP import |
Data Browser/Table View Maintenance | X | Display/Maintenance Allowed |
History
Last changed by/on | SAP | 20130529 |
SAP Release Created in |