SAP ABAP View /CUM/VIAUFKS (CU: PM Order Selection)
Hierarchy
EA-APPL (Software Component) SAP Enterprise Extension PLM, SCM, Financials
   PM-WOC-MO (Application Component) Maintenance Orders
     /CUM/ORDER (Package) Compatible unit order maintenance
Basic Data
View Type D Database View 
Database View /CUM/VIAUFKS  
Short Description CU: PM Order Selection    
Root table AFIH   Maintenance order header 
Table
# Table Name Foreign Table Foreign Field Foreign DIR
1 AFIH AFIH
2 AUFK  
3 AFKO  
4 ILOA  
Join Conditions
# Table Name Field Name Negation Operator Constants Cont. line AND/OR Offset F Length Mco Field
1 AUFK MANDT JL EQ 0 0
2 AFIH MANDT JR EQ AND 0 0
3 AUFK AUFNR JL EQ 0 0
4 AFIH AUFNR JR EQ AND 0 0
5 AUFK MANDT JL EQ 0 0
6 AFKO MANDT JR EQ AND 0 0
7 AUFK AUFNR JL EQ 0 0
8 AFKO AUFNR JR EQ AND 0 0
9 ILOA MANDT JL EQ 0 0
10 AFIH MANDT JR EQ AND 0 0
11 ILOA ILOAN JL EQ 0 0
12 AFIH ILOAN JR EQ 0 0
                     
View Fields
# View field Table Field Maintenance Flag Key Data element Mod Short Description
1 MANDT AFIH MANDT   MANDT Client
2 AUFNR AFIH AUFNR   AUFNR Order Number
3 PRIOK AFIH PRIOK   PRIOK Priority
4 EQUNR AFIH EQUNR   EQUNR Equipment Number
5 BAUTL AFIH BAUTL   BAUTL Assembly
6 ANLZU AFIH ANLZU   ANLZU Syst.Condition
7 IWERK AFIH IWERK   IWERK Maintenance Planning Plant
8 INGPR AFIH INGPR   INGRP Planner Group for Customer Service and Plant Maintenance
9 APGRP AFIH APGRP   VAGRP Responsible planner group/department
10 GEWRK AFIH GEWRK   LGWID Object ID of the Work Center
11 KUNUM AFIH KUNUM   KUNUM Customer Number
12 ANING AFIH ANING   ANING Name of Person Reponsible for System
13 GAUEH AFIH GAUEH   MAUEH Unit for Breakdown Duration
14 GAUZT AFIH GAUZT   GAUZT Planned downtime in hours
15 ANLBD AFIH ANLBD   ANLBD Date until which the system is available
16 ANLVD AFIH ANLVD   ANLVD Date from which the system is available
17 ANLBZ AFIH ANLBZ   ANLBZ Time until which the system is available
18 ANLVZ AFIH ANLVZ   ANLVZ Time from Which System is Available
19 WARPL AFIH WARPL   WARPL Maintenance Plan
20 WAPOS AFIH WAPOS   WAPOS Maintenance item
21 REVNR AFIH REVNR   REVNI Revision of Plant Maintenance and Customer Service
22 ARTPR AFIH ARTPR   ARTPR Priority Type
23 ILOAN AFIH ILOAN   ILOAN Location and account assignment for technical object
24 ILOAI AFIH ILOAI   ILOAI ILOA Individual
25 PM_OBJTY AFIH PM_OBJTY   PM_OBJTY Object Type of CIM Resources for Work Center
26 INSPK AFIH INSPK   INSPK Name of Person Responsible for Technical Inspection
27 DATAN AFIH DATAN   DATAN Date of Technical Inspection
28 ABNUM AFIH ABNUM   ABNUM Maintenance Plan Call Number
29 LAUFN AFIH LAUFN   LAUFN Order number
30 OBKNR AFIH OBKNR   OBJKNR Object list number
31 AUART AUFK AUART   AUFART Order Type
32 AUTYP AUFK AUTYP   AUFTYP Order category
33 ERNAM AUFK ERNAM   AUFERFNAM Entered by
34 ERDAT AUFK ERDAT   AUFERFDAT Created on
35 AENAM AUFK AENAM   AUFAENAM Last changed by
36 AEDAT AUFK AEDAT   AUFAEDAT Change date for Order Master
37 KTEXT AUFK KTEXT   AUFTEXT Description
38 LTEXT AUFK LTEXT   AUFLTEXT Long Text Exists
39 BUKRS AUFK BUKRS   BUKRS Company Code
40 WERKS AUFK WERKS   WERKS_D Plant
41 GSBER AUFK GSBER   GSBER Business Area
42 KOKRS AUFK KOKRS   KOKRS Controlling Area
43 CCKEY AUFK CCKEY   CCKEY Cost collector key
44 KOSTV AUFK KOSTV   AUFKOSTV Responsible cost center
45 STORT AUFK STORT   AUFSTORT Location
46 SOWRK AUFK SOWRK   AUFSOWRK Location plant
47 ASTKZ AUFK ASTKZ   AUFSTKZ Identifier for statistical order
48 WAERS AUFK WAERS   AUFWAERS Order Currency
49 ASTNR AUFK ASTNR   AUFASTNR Order status
50 STDAT AUFK STDAT   AUFSTDAT Date of last status change
51 ESTNR AUFK ESTNR   AUFESTNR Status reached so far
52 PDAT1 AUFK PDAT1   AUFPDAT1 Planned release date
53 PDAT2 AUFK PDAT2   AUFPDAT2 Planned completion date
54 PDAT3 AUFK PDAT3   AUFPDAT3 Planned closing date
55 IDAT1 AUFK IDAT1   AUFIDAT1 Release date
56 IDAT2 AUFK IDAT2   AUFIDAT2 Technical completion date
57 IDAT3 AUFK IDAT3   AUFIDAT3 Close date
58 OBJID AUFK OBJID   CCOBJID Object ID
59 VOGRP AUFK VOGRP   AUFSPSET Group of disallowed transactions
60 LOEKZ AUFK LOEKZ   AUFLOEKZ Deletion flag
61 PLGKZ AUFK PLGKZ   PLGKZ Identifier for planning with line items
62 KVEWE AUFK KVEWE   KVEWE Usage of the Condition Table
63 KAPPL AUFK KAPPL   KAPPL Application
64 KALSM AUFK KALSM   AUFKALSM Costing Sheet
65 ZSCHL AUFK ZSCHL   AUFZSCHL Overhead key
66 ABKRS AUFK ABKRS   AUFABKRS Processing group
67 KSTAR AUFK KSTAR   AUFKSTAR Settlement cost element
68 KOSTL ILOA KOSTL   KOSTL Cost Center
69 SAKNR AUFK SAKNR   AUFSAKNR G/L account for basic settlement
70 SETNM AUFK SETNM   AUFSETNM Allocation set
71 CYCLE AUFK CYCLE   ST_KOSTL Cost center to which costs are actually posted
72 SDATE AUFK SDATE   SDATE Start Date
73 SEQNR AUFK SEQNR   AUFSEQNR Sequence number
74 OBJNR AUFK OBJNR   J_OBJNR Object number
75 PRCTR AUFK PRCTR   PRCTR Profit Center
76 VNAME AUFK VNAME   JV_NAME Joint venture
77 RECID AUFK RECID   JV_RECIND Recovery Indicator
78 ETYPE AUFK ETYPE   JV_ETYPE Equity type
79 PSPEL AUFK PSPEL   PS_PSP_ELE Work breakdown structure element (WBS element)
80 AWSLS AUFK AWSLS   AWSLS Variance Key
81 ABGSL AUFK ABGSL   ABGR_SCHL Results Analysis Key
82 TPLNR ILOA TPLNR   TPLNR Functional Location
83 ABCKZ ILOA ABCKZ   ABCKZ ABC Indicator for Technical Object
84 EQFNR ILOA EQFNR   EQFNR Sort Field
85 SWERK ILOA SWERK   SWERK Maintenance Plant
86 STORT_ILOA ILOA STORT   PMLOC Location of maintenance object
87 MSGRP ILOA MSGRP   RAUMNR Room
88 BEBER ILOA BEBER   BEBER Organizational Area
89 CR_OBJTY ILOA CR_OBJTY   CR_OBJTY Object types of the CIM resource
90 PPSID ILOA PPSID   PPSID Object ID of PP work center
91 GSBER_ILOA ILOA GSBER   GSBER Business Area
92 KOKRS_ILOA ILOA KOKRS   KOKRS Controlling Area
93 PROID ILOA PROID   PS_PSP_PNR Work Breakdown Structure Element (WBS Element)
94 BUKRS_ILOA ILOA BUKRS   BUKRS Company Code
95 ANLNR ILOA ANLNR   ANLN1 Main Asset Number
96 ANLUN ILOA ANLUN   ANLN2 Asset Subnumber
97 DAUFN ILOA DAUFN   DAUFN Standing order number
98 AUFNR_ILOA ILOA AUFNR   ILOM_ORDST Settlement order
99 GLTRP AFKO GLTRP   CO_GLTRP Basic finish date
100 GSTRP AFKO GSTRP   PM_ORDGSTRP Basic Start Date
101 FTRMS AFKO FTRMS   CO_FTRMS Scheduled release date
102 GLTRS AFKO GLTRS   CO_GLTRS Scheduled finish
103 GSTRS AFKO GSTRS   CO_GSTRS Scheduled start
104 GSTRI AFKO GSTRI   CO_GSTRI Actual start date
105 GETRI AFKO GETRI   CO_GETRI Confirmed Order Finish Date
106 GLTRI AFKO GLTRI   CO_GLTRI Actual finish date
107 FTRMI AFKO FTRMI   CO_FTRMI Actual release date
108 FTRMP AFKO FTRMP   CO_FTRMP Planned release date
109 RSNUM AFKO RSNUM   RSNUM Number of reservation/dependent requirements
110 GASMG AFKO GASMG   GASMG Total scrap quantity in the order
111 GAMNG AFKO GAMNG   GAMNG Total order quantity
112 GMEIN AFKO GMEIN   MEINS Base Unit of Measure
113 PLNBEZ AFKO PLNBEZ   MATNR Material Number
114 PLNTY AFKO PLNTY   PLNTY Task List Type
115 PLNNR AFKO PLNNR   PLNNR Key for Task List Group
116 PLNAW AFKO PLNAW   PLNAW Application of the task list
117 PLNAL AFKO PLNAL   PLNAL Group Counter
118 PVERW AFKO PVERW   PLN_VERWE Task list usage
119 PLAUF AFKO PLAUF   CO_PLAUF Date for routing transfer
120 PLSVB AFKO PLSVB   LOSGRBIS To lot size
121 PLNME AFKO PLNME   PLNME Task list unit of measure
122 PLSVN AFKO PLSVN   LOSGRVON From Lot Size
123 PDATV AFKO PDATV   DATUV Valid-From Date
124 PAENR AFKO PAENR   AENNR Change Number
125 PLGRP AFKO PLGRP   VAGRP Responsible planner group/department
126 LODIV AFKO LODIV   LOSDIV Lot size divisor
127 STLTY AFKO STLTY   STLTY BOM Category
128 STLBEZ AFKO STLBEZ   MATNR Material Number
129 STLST AFKO STLST   STLST BOM Statuses
130 STLNR AFKO STLNR   STNUM Bill of Material
131 SDATV AFKO SDATV   DATUV Valid-From Date
132 SBMNG AFKO SBMNG   BASMN Base quantity
133 SBMEH AFKO SBMEH   MEINS Base Unit of Measure
134 SAENR AFKO SAENR   AENNR Change Number
135 STLAL AFKO STLAL   STALT Alternative BOM
136 STLAN AFKO STLAN   STLAN BOM Usage
137 SLSVN AFKO SLSVN   LOSVN From Lot Size
138 SLSBS AFKO SLSBS   LOSBS To Lot Size
139 AUFLD AFKO AUFLD   CO_AUFLD Date of BOM Explosion/Routing Transfer
140 DISPO AFKO DISPO   CO_DISPO MRP controller for the order
141 AUFPL AFKO AUFPL   CO_AUFPL Routing number of operations in the order
142 FEVOR AFKO FEVOR   FEVOR Production Supervisor
143 FHORI AFKO FHORI   FHORI Scheduling Margin Key for Floats
144 TERKZ AFKO TERKZ   TERMKZ Scheduling type
145 REDKZ AFKO REDKZ   REDKZ Reduction indicator for scheduling
146 APRIO AFKO APRIO   CO_APRIO Order priority
147 AUFNT AFKO AUFNT   CO_TEILNET Number of superior network
148 AUFPT AFKO AUFPT   CO_AUFPL Routing number of operations in the order
149 APLZT AFKO APLZT   CO_APLZL General counter for order
150 PROFID AFKO PROFID   PROFIDNZPL Network profile
151 VORGZ AFKO VORGZ   VORGZ Float before production (in days)
152 SICHZ AFKO SICHZ   SICHZ Float after production (in days)
153 FREIZ AFKO FREIZ   FREIZ Release period (in days)
154 UPTER AFKO UPTER   CO_UPTER Indicator: Change to Scheduled Dates
155 BEDID AFKO BEDID   BEDID ID of the capacity requirements record
156 PRONR AFKO PRONR   PS_PSP_PRO Project definition
157 ZAEHL AFKO ZAEHL   CIM_COUNT Internal counter
158 MZAEHL AFKO MZAEHL   CIM_COUNT Internal counter
159 ZKRIZ AFKO ZKRIZ   DZKRIZ Counter for additional criteria
160 PRUEFLOS AFKO PRUEFLOS   QPLOS Inspection Lot Number
161 KLVARP AFKO KLVARP   KALKVARPLN Costing variant for planned costs
162 KLVARI AFKO KLVARI   KALKVARIST Costing variant for actual costs
163 RGEKZ AFKO RGEKZ   CO_RGEKZ Indicator: Backflushing for order
164 PLART AFKO PLART   PS_PLART Basis for scheduling
165 ADDAT AFIH ADDAT   ADDAT PM Order: Reference Date
166 ADUHR AFIH ADUHR   ADUHR Time of Reference Date
167 IPHAS AFIH IPHAS   PM_PHASE Maintenance Processing Phase
168 ILART AFIH ILART   ILA Maintenance activity type
169 QMNUM AFIH QMNUM   QMNUM Message Number
170 FLG_AOB AFKO FLG_AOB   FLG_AOB Indicator: relationships
171 FLG_ARBEI AFKO FLG_ARBEI   FLG_ARBEI Indicator: Default value work is relevant
172 GLTPP AFKO GLTPP   CO_GLTPP Finish date (forecast)
173 GSTPP AFKO GSTPP   CO_GSTPP Forecast start date
174 GLTPS AFKO GLTPS   CO_GLTPS Scheduled forecast finish
175 GSTPS AFKO GSTPS   CO_GSTPS Scheduled forecast start
176 FTRPS AFKO FTRPS   CO_FTRPS Scheduled release date (forecast)
177 RDKZP AFKO RDKZP   REDKZP Reduction indicator for scheduling (forecast)
178 TRKZP AFKO TRKZP   TERMKZP Scheduling type (forecast)
179 VKORG ILOA VKORG   VKORG Sales Organization
180 VTWEG ILOA VTWEG   VTWEG Distribution Channel
181 SPART ILOA SPART   SPART Division
182 ADRNR_ILOA ILOA ADRNR   AD_ADDRNUM Address number
183 KDAUF AUFK KDAUF   KDAUF Sales Order Number
184 KDPOS AUFK KDPOS   KDPOS Item number in Sales Order
185 GLUZP AFKO GLUZP   CO_GLUZP Basic finish (time)
186 GSUZP AFKO GSUZP   CO_GSUZP Basic start time
187 GLUZS AFKO GLUZS   CO_GLUZS Scheduled finish time
188 GSUZS AFKO GSUZS   CO_GSUZS Scheduled Start (Time)
189 MAUFNR AFKO MAUFNR   MAUFNR Number of superior order
190 LEAD_AUFNR AFKO LEAD_AUFNR   CO_LAUFNR Leading order in current processing
191 GEUZI AFKO GEUZI   CO_GEUZI Confirmed order finish (time)
192 GSUZI AFKO GSUZI   CO_GSUZI Actual start time
193 OWNER ILOA OWNER   ILOM_OWNER Object reference indicator
194 PLKNZ AFIH PLKNZ   AUF_PLKNZ Maintenance order planning indicator
195 USER4 AUFK USER4   AUFUSER4 Estimated total costs of order
196 RSORD AUFK RSORD   RSORD Refurbishment order indicator (PM)
197 BEMOT AUFK BEMOT   BEMOT Accounting Indicator
198 SERMAT AFIH SERMAT   MATNR Material Number
199 SERIALNR AFIH SERIALNR   GERNR Serial Number
200 DEVICEID AFIH DEVICEID   DEVICEID Additional Device Data
201 ADRNRA AUFK ADRNRA   AD_ADDRNUM Address number
202 .APPEND /CUM/VIAUFKS_APP      
203 /CUM/CMNUM AUFK /CUM/CMNUM   /CUM/CMNUM CU: Construction Measure Number
                 
Maintenance Status
Access
  read only
  read and change
  Time-dependent views: like U, validity data like ' '
  read, change, delete and insert
Delivery Class      
Data Browser/Table View Maintenance    Display/Maintenance Allowed with Restrictions  
History
Last changed by/on SAP  20130603 
SAP Release Created in