Data Element list used by SAP ABAP Table MT61D (Material Master: MRP)
SAP ABAP Table
MT61D (Material Master: MRP) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | AHDIS | MRP relevancy for dependent requirements | ||
| 2 | ALTSL | Method for Selecting Alternative Bills of Material | ||
| 3 | APOKZ | Indicator: Is material relevant for APO | ||
| 4 | ATTYP | Material Category | ||
| 5 | AUFTL | Splitting Indicator | ||
| 6 | AUSDT | Effective-out date | ||
| 7 | AUSME | Unit of issue | ||
| 8 | AUSSS | Assembly scrap in percent | ||
| 9 | BASMG | Base quantity | ||
| 10 | BEARZ | Processing time | ||
| 11 | BERID | MRP Area | ||
| 12 | BESKZ | Procurement Type | ||
| 13 | BFLME | Generic Material with Logistical Variants | ||
| 14 | BKLAS | Valuation Class | ||
| 15 | BSEXT | External Purchase Orders Allowed | ||
| 16 | BSINT | Internal purchase orders allowed | ||
| 17 | BSTFE | Fixed lot size | ||
| 18 | BSTMA | Maximum lot size | ||
| 19 | BSTME | Order unit | ||
| 20 | BSTMI | Minimum lot size | ||
| 21 | BSTRF | Rounding value for purchase order quantity | ||
| 22 | BWESB | Valuated Goods Receipt Blocked Stock | ||
| 23 | BWSCL | Source of Supply | ||
| 24 | CC_MTEFF | Assign effectivity parameter values/ override change numbers | ||
| 25 | CUOBM | Internal object number | ||
| 26 | CUOBM | Internal object number | ||
| 27 | CUOBV | Internal object number of configurable material for planning | ||
| 28 | DIBER | Indicator: MRP area exists | ||
| 29 | DISGR | MRP Group | ||
| 30 | DISLS | Lot size (materials planning) | ||
| 31 | DISMM | MRP Type | ||
| 32 | DISPO | MRP controller | ||
| 33 | DISST | Low-level code | ||
| 34 | DPLFS | Fair share rule | ||
| 35 | DPLHO | Deployment horizon in days | ||
| 36 | DPLPU | Indicator: push distribution | ||
| 37 | DZEIT | In-house production time | ||
| 38 | EISBE | Safety stock | ||
| 39 | EISLO | Minimum Safety Stock | ||
| 40 | EKGRP | Purchasing group | ||
| 41 | EPRIO | Withdrawal sequence group for stocks | ||
| 42 | EXPME | Unit of measure for commodity code (foreign trade) | ||
| 43 | FABKZ | Indicator: Item Relevant to JIT Delivery Schedules | ||
| 44 | FEVOR | Production Supervisor | ||
| 45 | FHORI | Scheduling Margin Key for Floats | ||
| 46 | FRTME | Production unit | ||
| 47 | FXHOR | Planning time fence | ||
| 48 | INSMK | Stock Type | ||
| 49 | KZAUS | Discontinuation indicator | ||
| 50 | KZBED | Indicator for Requirements Grouping | ||
| 51 | KZDIE | Indicator: MRP controller is buyer (deactivated) | ||
| 52 | KZGRP | Grouping indicator | ||
| 53 | KZKFG | Configurable Material | ||
| 54 | KZPSP | Indicator for cross-project material | ||
| 55 | KZREV | Indicator: revision level has been assigned to the material | ||
| 56 | KZWSO | Units of measure usage | ||
| 57 | LAGPR | Storage costs indicator | ||
| 58 | LFRHY | Planning cycle | ||
| 59 | LGFSB | Default storage location for external procurement | ||
| 60 | LGPRO | Issue storage location | ||
| 61 | LOSFX | Ordering costs | ||
| 62 | LVORM | Deletion Indicator | ||
| 63 | MAABC | ABC indicator | ||
| 64 | MABST | Maximum stock level | ||
| 65 | MAKTX | Material description | ||
| 66 | MATKL | Material Group | ||
| 67 | MATNR | Material Number | ||
| 68 | MDACH | Action control: planned order processing | ||
| 69 | MEINS | Base Unit of Measure | ||
| 70 | MENGU | Quantity Updating in Material Master Record | ||
| 71 | MFRNR | Manufacturer number | ||
| 72 | MFRPN | Manufacturer Part Number | ||
| 73 | MINBE | Reorder point | ||
| 74 | MISKZ | Mixed MRP indicator | ||
| 75 | MMSTA | Plant-Specific Material Status | ||
| 76 | MMSTD | Date from which the plant-specific material status is valid | ||
| 77 | MPROF | Mfr part profile | ||
| 78 | MRPPP | PPC planning calendar | ||
| 79 | MSTAE | Cross-Plant Material Status | ||
| 80 | MSTDE | Date from which the cross-plant material status is valid | ||
| 81 | MTART | Material type | ||
| 82 | MTVFP | Checking Group for Availability Check | ||
| 83 | NFMAT | Follow-up material | ||
| 84 | PEINH | Price unit | ||
| 85 | PERIV | Fiscal Year Variant | ||
| 86 | PERKZ | Period indicator | ||
| 87 | PFREI | Indicator: automatic fixing of planned orders | ||
| 88 | PLIFZ | Planned delivery time in days | ||
| 89 | PRBME | Base unit of measure for product group | ||
| 90 | PRCTR | Profit Center | ||
| 91 | PROKZ | Forecast indicator | ||
| 92 | PSTAT_D | Maintenance status | ||
| 93 | QMATV | Inspection Setup Exists for Material/Plant | ||
| 94 | RDPRF | Rounding Profile | ||
| 95 | RESVP | Period of adjustment for planned independent requirements | ||
| 96 | RUEZT | Setup and teardown time | ||
| 97 | RWPRO | Range of coverage profile | ||
| 98 | SATNR | Cross-Plant Configurable Material | ||
| 99 | SA_SAUFT | Ind.: Repetitive mfg allowed | ||
| 100 | SBDKZ | Dependent requirements ind. for individual and coll. reqmts | ||
| 101 | SCHGT | Indicator: bulk material | ||
| 102 | SERAIL | Serial Number Profile | ||
| 103 | SERLV | Level of Explicitness for Serial Number | ||
| 104 | SFEPR | Repetitive manufacturing profile | ||
| 105 | SHFLG | Safety time indicator (with or without safety time) | ||
| 106 | SHPRO | Period profile for safety time | ||
| 107 | SHZET | Safety time (in workdays) | ||
| 108 | SOBSL | Special procurement type | ||
| 109 | SPART | Division | ||
| 110 | STDPD | Configurable material | ||
| 111 | STPRS | Standard price | ||
| 112 | STRGR | Planning strategy group | ||
| 113 | TAKZT | Takt time | ||
| 114 | TRAME | Stock in transit | ||
| 115 | TRANZ | Interoperation time | ||
| 116 | UMLME | Stock in transfer (plant to plant) | ||
| 117 | UMREFF | Conversion factor: quantities | ||
| 118 | USEQU | Quota arrangement usage | ||
| 119 | VERPR | Moving Average Price/Periodic Unit Price | ||
| 120 | VINT1 | Consumption period: backward | ||
| 121 | VINT2 | Consumption period: forward | ||
| 122 | VPMAT | Planning material | ||
| 123 | VPRSV | Price control indicator | ||
| 124 | VPWRK | Planning plant | ||
| 125 | VRMOD | Consumption mode | ||
| 126 | VSPVB | Proposed Supply Area in Material Master Record | ||
| 127 | WEBAZ | Goods receipt processing time in days | ||
| 128 | WERKS_D | Plant | ||
| 129 | WERTU | Value Updating in Material Master Record | ||
| 130 | WZEIT | Total replenishment lead time (in workdays) | ||
| 131 | XCHPF | Batch management requirement indicator |