Hierarchy
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ MG (Package) Application development R/3 material master prior to 3.0
Basic Data
Data Element | MINBE |
Short Description | Reorder point |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | MENG13 | |
Data Type | QUAN | Quantity field, points to a unit field with format UNIT |
Length | 13 | |
Decimal Places | 3 | |
Output Length | 17 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | REORDER_PT | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Reorder pt |
Medium | 15 | Reorder point |
Long | 20 | Reorder point |
Heading | 13 | Reorder point |
Documentation
Definition
If the stock falls below this quantity, the system flags the material for requirements planning by creating a planning file entry.
Supplementary Documentation - MINBE 0001
Use
The order level can be defined either manually or automatically using a forecast. The automatic method checks the order level periodically and adjusts it in accordance with requirements.
Procedure
Example
Dependencies
Supplementary Documentation - MINBE 0002
Use
The reorder point is important only for reorder point planning.
Procedure
With manual reorder point planning, you enter the reorder point manually. With automatic reorder point planning, the system determines the reorder point automatically for forecasting purposes.
If you are creating a material master record, you must always enter the reorder point manually, even if it is later overwritten by the system. This makes it possible to plan material requirements, even before forecasting.
History
Last changed by/on | SAP | 19991108 |
SAP Release Created in |