SAP ABAP Table VSAFVV_CN (Version: Quantities/Dates/Values in order operation)
Hierarchy
BBPCRM (Software Component) BBPCRM
   SRM-EBP (Application Component) Enterprise Buyer
     CNVS (Package) R/3 Application development: Version Management
Basic Data
Table Category TRANSP    Transparent table 
Transparent table VSAFVV_CN   Table Relationship Diagram
Short Description Version: Quantities/Dates/Values in order operation    
Delivery and Maintenance
Pool/cluster      
Delivery Class A   Application Table (Master- and Transaction Data) 
Data Browser/Table View Maintenance     Display/Maintenance Allowed with Restrictions 
Components
     
Field Key Data Element Domain Data
Type
Length Decimal
Places
Short Description Check
table
1 MANDT MANDT MANDT CLNT 3   0   Client T000
2 .INCLUDE       0   0   Version: PS version, version-related key fields  
3 VSNMR VSNMR VSNMR CHAR 12   0   Number or description of a version  
4 AUFPL CO_AUFPL AUFPL NUMC 10   0   Routing number of operations in the order  
5 APLZL CO_APLZL CO_APLZL NUMC 8   0   General counter for order AFVC
6 .INCLUDE       0   0   Include structure of the operation quantities/dates/values  
7 MEINH VORME MEINS UNIT 3   0   Unit of measure for activity T006
8 UMREN CP_UMREN UMBSN DEC 5   0   Denominator for converting rtg and op units of measure  
9 UMREZ CP_UMREZ UMBSZ DEC 5   0   Numerator for converting task list and oper. un. of measure  
10 BMSCH BMSCH BMSCH QUAN 13   3   Base Quantity  
11 ZMERH DZMERH VGWRT QUAN 9   3   Break  
12 ZEIER DZEIER MEINS UNIT 3   0   Unit for the break time T006
13 VGE01 VGWRTEH MEINS UNIT 3   0   Unit of measure for the standard value T006
14 VGW01 VGWRT VGWRT QUAN 9   3   Standard Value  
15 VGE02 VGWRTEH MEINS UNIT 3   0   Unit of measure for the standard value T006
16 VGW02 VGWRT VGWRT QUAN 9   3   Standard Value  
17 VGE03 VGWRTEH MEINS UNIT 3   0   Unit of measure for the standard value T006
18 VGW03 VGWRT VGWRT QUAN 9   3   Standard Value  
19 VGE04 VGWRTEH MEINS UNIT 3   0   Unit of measure for the standard value T006
20 VGW04 VGWRT VGWRT QUAN 9   3   Standard Value  
21 VGE05 VGWRTEH MEINS UNIT 3   0   Unit of measure for the standard value T006
22 VGW05 VGWRT VGWRT QUAN 9   3   Standard Value  
23 VGE06 VGWRTEH MEINS UNIT 3   0   Unit of measure for the standard value T006
24 VGW06 VGWRT VGWRT QUAN 9   3   Standard Value  
25 ZEIMU DZEIMU MEINS UNIT 3   0   Unit for the minimum overlap time T006
26 ZMINU DZMINU VGWRT QUAN 9   3   Minimum overlap time  
27 MINWE MINWEI MINWEI QUAN 13   3   Minimum Send-Ahead Quantity  
28 ZEIMB DZEIMB MEINS UNIT 3   0   Unit for the minimum processing time T006
29 ZMINB DZMINB VGWRT QUAN 9   3   Minimum processing time  
30 ZEILM DZEILM MEINS UNIT 3   0   Unit for the maximum wait time T006
31 ZLMAX DZLMAX VGWRT QUAN 9   3   Maximum wait time  
32 ZEILP DZEILP MEINS UNIT 3   0   Unit for the required wait time T006
33 ZLPRO DZLPRO VGWRT QUAN 9   3   Minimum wait time  
34 ZEIWN DZEIWN MEINS UNIT 3   0   Unit for the standard queue time T006
35 ZWNOR DZWNOR VGWRT QUAN 9   3   Standard queue time  
36 ZEIWM DZEIWM MEINS UNIT 3   0   Unit for the minumum queue time T006
37 ZWMIN DZWMIN VGWRT QUAN 9   3   Minimum queue time  
38 ZEITN DZEITN MEINS UNIT 3   0   Unit for the standard move time T006
39 ZTNOR DZTNOR VGWRT QUAN 9   3   Standard move time  
40 ZEITM DZEITM MEINS UNIT 3   0   Unit for the minimum move time T006
41 ZTMIN DZTMIN VGWRT QUAN 9   3   Minimum move time  
42 PLIFZ PLIFZ DEC3 DEC 3   0   Planned delivery time in days  
43 DAUNO DAUNOR DAUER_4_1 QUAN 5   1   Normal duration of the activity  
44 DAUNE DAUNORE MEINS UNIT 3   0   Normal duration/unit T006
45 DAUMI DAUMIN DAUER_4_1 QUAN 5   1   Minimum activity duration  
46 DAUME DAUMINE MEINS UNIT 3   0   Unit for the minimum duration T006
47 EINSA EINSCHRA RESTRIKSTR CHAR 1   0   Constraint on the basic start date for the activity  
48 EINSE EINSCHRE RESTRIKEND CHAR 1   0   Constraint on the finish date of the activity  
49 ARBEI ARBEIT ARBEIT QUAN 7   1   Work involved in the activity  
50 ARBEH ARBEITE MEINS UNIT 3   0   Unit for work T006
51 MGVRG MGVRG MENG13 QUAN 13   3   Operation Quantity  
52 ASVRG ASVRG MENG13 QUAN 13   3   Operation scrap  
53 LMNGA LMNGA MENG13 QUAN 13   3   Total Yield Confirmed  
54 XMNGA XMNGA MENG13 QUAN 13   3   Total scrap quantity confirmed  
55 GMNGA GMNGA MENG13 QUAN 13   3   Confirmed yield in order unit of measure  
56 ISM01 CO_RUMNG MENGV13 QUAN 13   3   Previously confirmed activity  
57 ISM02 CO_RUMNG MENGV13 QUAN 13   3   Previously confirmed activity  
58 ISM03 CO_RUMNG MENGV13 QUAN 13   3   Previously confirmed activity  
59 ISM04 CO_RUMNG MENGV13 QUAN 13   3   Previously confirmed activity  
60 ISM05 CO_RUMNG MENGV13 QUAN 13   3   Previously confirmed activity  
61 ISM06 CO_RUMNG MENGV13 QUAN 13   3   Previously confirmed activity  
62 ISMNW CO_ISMNW MENG13 QUAN 13   3   Actual work  
63 FSAVD FSAVD DATUM DATS 8   0   Earliest scheduled start: Execution (date)  
64 FSAVZ FSAVZ ATIME TIMS 6   0   Earliest scheduled start: Execution (time)  
65 FSSBD FSSBD DATUM DATS 8   0   Earliest scheduled start: Processing (date)  
66 FSSBZ FSSBZ ATIME TIMS 6   0   Earliest scheduled start: Processing (time)  
67 FSSAD FSSAD DATUM DATS 8   0   Earliest scheduled start: Teardown (date)  
68 FSSAZ FSSAZ ATIME TIMS 6   0   Earliest scheduled start: Teardown (time)  
69 FSEDD FSEDD DATUM DATS 8   0   Earliest scheduled finish: Execution (date)  
70 FSEDZ FSEDZ ATIME TIMS 6   0   Earliest scheduled finish: Execution (time)  
71 FSSLD FSSLD DATUM DATS 8   0   Earliest scheduled start: Wait (date)  
72 FSSLZ FSSLZ ATIME TIMS 6   0   Earliest scheduled start: Wait (time)  
73 FSELD FSELD DATUM DATS 8   0   Earliest scheduled finish: Wait (date)  
74 FSELZ FSELZ ATIME TIMS 6   0   Earliest scheduled finish: Wait (time)  
75 SSAVD SSAVD DATUM DATS 8   0   Latest scheduled start: Execution (date)  
76 SSAVZ SSAVZ ATIME TIMS 6   0   Latest scheduled start: Execution (time)  
77 SSSBD SSSBD DATUM DATS 8   0   Latest scheduled start: Processing (date)  
78 SSSBZ SSSBZ ATIME TIMS 6   0   Latest scheduled start: Processing (time)  
79 SSSAD SSSAD DATUM DATS 8   0   Latest scheduled start: Teardown (date)  
80 SSSAZ SSSAZ ATIME TIMS 6   0   Latest scheduled start: Teardown (time)  
81 SSEDD SSEDD DATUM DATS 8   0   Latest scheduled finish: Execution (date)  
82 SSEDZ SSEDZ ATIME TIMS 6   0   Latest scheduled finish: Execution (time)  
83 SSSLD SSSLD DATUM DATS 8   0   Latest scheduled start: Wait time (date)  
84 SSSLZ SSSLZ ATIME TIMS 6   0   Latest scheduled start: Wait time  
85 SSELD SSELD DATUM DATS 8   0   Latest scheduled finish: Wait time (date)  
86 SSELZ SSELZ ATIME TIMS 6   0   Latest scheduled finish: Wait time  
87 ISAVD ISAVD DATUM DATS 8   0   Actual operation start (date)  
88 IEAVD IEAVD DATUM DATS 8   0   Actual finish of operation (date)  
89 ISDD ISDD DATUM DATS 8   0   Actual start: Execution (date)  
90 ISDZ ISDZ ATIME TIMS 6   0   Actual start: Execution/setup (time)  
91 IERD IERD DATUM DATS 8   0   Actual finish: Setup (date)  
92 IERZ IERZ ATIME TIMS 6   0   Actual finish: Setup (time)  
93 ISBD ISBD DATUM DATS 8   0   Actual start: Processing (date)  
94 ISBZ ISBZ ATIME TIMS 6   0   Actual start: Processing (time)  
95 IEBD IEBD DATUM DATS 8   0   Actual finish: Processing (date)  
96 IEBZ IEBZ ATIME TIMS 6   0   Actual processing finish (time)  
97 ISAD ISAD DATUM DATS 8   0   Actual start: Teardown (date)  
98 ISAZ ISAZ ATIME TIMS 6   0   Actual start: Teardown (time)  
99 IEDD IEDD DATUM DATS 8   0   Actual finish: Execution (date)  
100 IEDZ IEDZ ATIME TIMS 6   0   Actual finish: Execution (time)  
101 PEDD CO_PEDD DATUM DATS 8   0   Forecast finish date of operation from confirmation  
102 PEDZ CO_PEDZ ATIME TIMS 6   0   Forecast finish time of operation from confirmation  
103 PUFFR PUFFR_FREI PUFFER DEC 3   0   Free float  
104 PUFGS PUFFR_GESM PUFFER DEC 3   0   Total float  
105 NTANF VORGABESTD VORGABESTR DATS 8   0   Constraint for activity start (Basic)  
106 NTANZ VORGABESTZ ATIME TIMS 6   0   Constraint for activity start time (Basic)  
107 NTEND VORGABEEND2 VORGABEEND DATS 8   0   Constraint for Finish of Activity (Basic)  
108 NTENZ VORGABEENZ ATIME TIMS 6   0   Basic finish time of the activity  
109 EWSTD EWSTARTD DATUM DATS 8   0   Forecasted start date for the activity  
110 EWSTZ EWSTARTZ ATIME TIMS 6   0   Forecast start time of the activity  
111 EWEND EWENDED DATUM DATS 8   0   Forecast finish date  
112 EWENZ EWENDEZ ATIME TIMS 6   0   Forecast finish time for the activity  
113 EWDAN EWDAN DAUER_4_1 QUAN 5   1   Normal duration (from forecast) of activity  
114 EWDNE EWDNE MEINS UNIT 3   0   Unit for forecast normal duration T006
115 EWDAM EWDAM DAUER_4_1 QUAN 5   1   Minimum duration (from forecast) for activity  
116 EWDME EWDME MEINS UNIT 3   0   Unit for forecast minimum duration T006
117 EWSTE PS_RESTE RESTRIKEND CHAR 1   0   Forecast date constraint on activity finish  
118 EWSTA PS_RESTA RESTRIKSTR CHAR 1   0   Forecast date constraint on activity start  
119 WARTZ WARTEZEIT CX_ZEIT FLTP 16   16   Queue time used for scheduling  
120 WRTZE WTRZE EINHEIT UNIT 3   0   Unit of measure for queue time  
121 RUEST RUEST CX_ZEIT FLTP 16   16   Setup time  
122 RSTZE RSTZE EINHEIT UNIT 3   0   Unit of measure for setup time  
123 BEARZ BEARZEIT CX_ZEIT FLTP 16   16   Processing time  
124 BEAZE BEAZE EINHEIT UNIT 3   0   Unit of measure for processing time  
125 ABRUE ABRUE CX_ZEIT FLTP 16   16   Teardown  
126 ARUZE ARUZE EINHEIT UNIT 3   0   Unit of measure for teardown  
127 LIEGZ LIEGEZEIT CX_ZEIT FLTP 16   16   Wait time used for scheduling  
128 LIGZE LIGZE EINHEIT UNIT 3   0   Unit of measure for wait time  
129 TRANZ TRANSZEIT CX_ZEIT FLTP 16   16   Move time used for scheduling  
130 TRAZE TRAZE EINHEIT UNIT 3   0   Unit of measure for move time  
131 ISERH ISERH VGWRT QUAN 9   3   Confirmed break time  
132 OFM01 CO_SCHAETZ VGWRT QUAN 9   3   Forecast value used to update the standard value  
133 OFM02 CO_SCHAETZ VGWRT QUAN 9   3   Forecast value used to update the standard value  
134 OFM03 CO_SCHAETZ VGWRT QUAN 9   3   Forecast value used to update the standard value  
135 OFM04 CO_SCHAETZ VGWRT QUAN 9   3   Forecast value used to update the standard value  
136 OFM05 CO_SCHAETZ VGWRT QUAN 9   3   Forecast value used to update the standard value  
137 OFM06 CO_SCHAETZ VGWRT QUAN 9   3   Forecast value used to update the standard value  
138 OFMNW OFMNW ARBEIT QUAN 7   1   Forecasted work (actual + remaining)  
139 BZOFFB CP_OBZOFFB CP_BZOFF CHAR 2   0   Reference date for start of sub-operation TCA54
140 EHOFFB CP_OEHOFFB MEINS UNIT 3   0   Unit for offset to start T006
141 OFFSTB CP_OOFFSTB VNZTV QUAN 5   0   Offset to sub-operation start  
142 OFFSTE CP_OOFFSTE VNZTV QUAN 5   0   Offset to sub-operation finish  
143 BZOFFE CP_OBZOFFE CP_BZOFF CHAR 2   0   Reference date for finish of sub-operation TCA54
144 EHOFFE CP_OEHOFFE MEINS UNIT 3   0   Unit for offset to finish T006
145 FPAVD FPAVD DATUM DATS 8   0   Earliest scheduled start date (forecast)  
146 FPAVZ FPAVZ ATIME TIMS 6   0   Earliest scheduled start time (forecast)  
147 FPEDD FPEDD DATUM DATS 8   0   Earliest scheduled finish date (forecast)  
148 FPEDZ FPEDZ ATIME TIMS 6   0   Earliest scheduled finish time (forecast)  
149 SPAVD SPAVD DATUM DATS 8   0   Latest scheduled start date (forecast)  
150 SPAVZ SPAVZ ATIME TIMS 6   0   Latest scheduled start time (forecast)  
151 SPEDD SPEDD DATUM DATS 8   0   Latest scheduled finish date (forecast)  
152 SPEDZ SPEDZ ATIME TIMS 6   0   Latest scheduled finish time (forecast)  
153 BEAZP BEAZEP EINHEIT UNIT 3   0   Unit of processing time (Forecast)  
154 PUFGP PPUFF_GESM PUFFER DEC 3   0   Total float (from forecast)  
155 PUFFP PPUFF_FREI PUFFER DEC 3   0   Free float (from forecast)  
156 BEARP PBEARZEIT CX_ZEIT FLTP 16   16   Processing time (forecast)  
157 EPANF EPANF DATUM DATS 8   0   Dispatched start date for operation  
158 EPANZ EPANZ ATIME TIMS 6   0   Dispatched start time for operation  
159 EPEND EPEND DATUM DATS 8   0   Dispatched finish date  
160 EPENZ EPENZ ATIME TIMS 6   0   Dispatched finish time  
161 PDAU PDAU DAUER_4_1 QUAN 5   1   Forecasted duration of activity from confirmation  
162 PDAE PDAE MEINS UNIT 3   0   Unit of the forecasted duration from the confirmation T006
163 KNOTE KNOTE KNOTN CHAR 10   0   Transportation Connection Points TVKN
164 VSTZW VSTZW VSTZW CHAR 4   0   Deadline function TVTZ
165 VSTGA VSTGA VSTGA CHAR 4   0   Deadline deviation reason TVTG
166 QRASTZEHT QRASTZEHT MEINS UNIT 3   0   Time Unit *
167 QRASTZFAK QRASTZFAK QPROBEFAK DEC 5   2   Time Factor  
168 QRASTMENG QRASTMENG MENG13 QUAN 13   3   Quantity Between Two Inspections  
169 QRASTEREH QRASTEREH MEINS UNIT 3   0   Grid Unit of Measure *
170 AUFKT AFAKT AFAKT DEC 3   0   Execution Factor  
171 RMNGA RMNGA MENGV13 QUAN 13   3   Total confirmed rework quantity  
172 ILE01 CO_ISMNGEH MEINS UNIT 3   0   Unit of measure for the activity to be confirmed *
173 ILE02 CO_ISMNGEH MEINS UNIT 3   0   Unit of measure for the activity to be confirmed *
174 ILE03 CO_ISMNGEH MEINS UNIT 3   0   Unit of measure for the activity to be confirmed *
175 ILE04 CO_ISMNGEH MEINS UNIT 3   0   Unit of measure for the activity to be confirmed *
176 ILE05 CO_ISMNGEH MEINS UNIT 3   0   Unit of measure for the activity to be confirmed *
177 ILE06 CO_ISMNGEH MEINS UNIT 3   0   Unit of measure for the activity to be confirmed *
178 RWFAK RWFAK AUSCHUFAK DEC 5   3   Rework factor (is not used yet)  
179 IPRZ1 CO_IPRZS MENGV13 QUAN 13   3   Confirmed quantity/work for business process  
180 IPRE1 RU_IPRZE MEINS UNIT 3   0   Unit of measurement for conf. quantity for business process *
181 IPRK1 RU_IPRZK XFELD CHAR 1   0   No remaining quantity expected for business process  
182 TAKT LD_TAKT LD_TAKT NUMC 4   0   takt within a line segment  
183 OPRZ1 OPRZ1 MENGV13 QUAN 13   3   Remaining quantity for business process  
184 OPRE1 OPRE1 MEINS UNIT 3   0   Unit for remaining quantity of business process *
185 PSPM_INDICATOR PSPM_INDICATOR PSPM_INDICATOR CHAR 1   0   Indicates PMCS date influence activity scheduling  
Foreign Keys
Source Table Source Column Foreign Table Foreign Column Dependency Factor Cardinality left Cardinality right
1 VSAFVV_CN APLZL AFVC APLZL KEY 1 CN
2 VSAFVV_CN ARBEH T006 MSEHI    
3 VSAFVV_CN BZOFFB TCA54 BZOFF    
4 VSAFVV_CN BZOFFE TCA54 BZOFF    
5 VSAFVV_CN DAUME T006 MSEHI    
6 VSAFVV_CN DAUNE T006 MSEHI    
7 VSAFVV_CN EHOFFB T006 MSEHI    
8 VSAFVV_CN EHOFFE T006 MSEHI    
9 VSAFVV_CN EWDME T006 MSEHI    
10 VSAFVV_CN EWDNE T006 MSEHI    
11 VSAFVV_CN KNOTE TVKN KNOTE    
12 VSAFVV_CN MANDT T000 MANDT KEY 1 CN
13 VSAFVV_CN MEINH T006 MSEHI    
14 VSAFVV_CN PDAE T006 MSEHI    
15 VSAFVV_CN VGE01 T006 MSEHI    
16 VSAFVV_CN VGE02 T006 MSEHI    
17 VSAFVV_CN VGE03 T006 MSEHI    
18 VSAFVV_CN VGE04 T006 MSEHI    
19 VSAFVV_CN VGE05 T006 MSEHI    
20 VSAFVV_CN VGE06 T006 MSEHI    
21 VSAFVV_CN VSTGA TVTG VSTGA    
22 VSAFVV_CN VSTZW TVTZ VSTZW    
23 VSAFVV_CN ZEIER T006 MSEHI    
24 VSAFVV_CN ZEILM T006 MSEHI    
25 VSAFVV_CN ZEILP T006 MSEHI    
26 VSAFVV_CN ZEIMB T006 MSEHI    
27 VSAFVV_CN ZEIMU T006 MSEHI    
28 VSAFVV_CN ZEITM T006 MSEHI    
29 VSAFVV_CN ZEITN T006 MSEHI    
30 VSAFVV_CN ZEIWM T006 MSEHI    
31 VSAFVV_CN ZEIWN T006 MSEHI    
History
Last changed by/on SAP  20110901 
SAP Release Created in