Data Element list used by SAP ABAP Table T438M (Control Parameter for MRP -Material Level-)
SAP ABAP Table
T438M (Control Parameter for MRP -Material Level-) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | ANDIS | Number of Days After Which the Material Must Be Planned | ||
| 2 | AUAR2 | Order type for process order | ||
| 3 | AUFART | Order Type | ||
| 4 | BANER | Creation Indicator for Purchase Requisitions | ||
| 5 | BBSRT_LB | MRP: Document type purchase requisition for subcontracting | ||
| 6 | BBSRT_NB | MRP:doc.type purchase requisitions for standard purchase ord | ||
| 7 | BBSRT_UL | MRP: purchase requisition for stock transfer - document type | ||
| 8 | BESAD | Determination of explosion date for BOM and routing | ||
| 9 | DISER | Creation Indicator for MRP Lists | ||
| 10 | DISGR | MRP Group | ||
| 11 | EXSGD | Do not explode bulk material items | ||
| 12 | FIXHZ | Planning time fence | ||
| 13 | FKOBS | ATP check by full confirmation logic | ||
| 14 | GRREL | Relevant for requirements grouping for project stock | ||
| 15 | GTERM | Scheduling according to purchasing info record or agreement | ||
| 16 | KZDRB | Indicator: direct procurement/production MRP | ||
| 17 | LIFKZ | Automatic Schedule Lines (Scheduling Agreements) | ||
| 18 | MANDT | Client | ||
| 19 | MDACH | Action control: planned order processing | ||
| 20 | MD_EVAPR | Evaluation Profile for Range-of-Coverage Data | ||
| 21 | PLAHZ | Planning horizon | ||
| 22 | PLSEL | Issue Storage Location Selection | ||
| 23 | PRASTA | Period split | ||
| 24 | PRREG | Checking rule for the availability check | ||
| 25 | RESHZ | Roll forward period for the master plan | ||
| 26 | RESVP | Period of adjustment for planned independent requirements | ||
| 27 | RVPKZ | Adjustment of Planned Independent Requirements | ||
| 28 | SBDIS | Share of safety stock which can be used for planning | ||
| 29 | SHFLG | Safety time indicator (with or without safety time) | ||
| 30 | SHZET | Safety time (in workdays) | ||
| 31 | STRGR | Planning strategy group | ||
| 32 | UMTHZ | Rescheduling horizon | ||
| 33 | VERGR | Start date of order proposals allowed in the past | ||
| 34 | VINT1 | Consumption period: backward | ||
| 35 | VINT2 | Consumption period: forward | ||
| 36 | VRMOD | Consumption mode | ||
| 37 | VWVER | Tolerance value for displacement in the future | ||
| 38 | VWVOR | Tolerance value for bringing forward receipt elements | ||
| 39 | WERKS_D | Plant | ||
| 40 | XFAT1 | Firm Only Schedule Lines Transmitted to Vendor by Purchasing | ||
| 41 | XFAT2 | Fant. 2 |