Data Element list used by SAP ABAP Table PPE_PSIF01 (Selection Criteria for BOM Assignment to PS)
SAP ABAP Table
PPE_PSIF01 (Selection Criteria for BOM Assignment to PS) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | AENNR | Change Number | ||
| 2 | BDMNG | Requirement Quantity | ||
| 3 | CAPID | Application | ||
| 4 | CN_AENNR | Only items changed with the given change number | ||
| 5 | CN_AVCHK | Availability check during save | ||
| 6 | CN_FLG_PRE | In general generate preliminary requirements | ||
| 7 | CN_MEHRS | Multilevel BOM Explosion | ||
| 8 | CN_NODLG | Indicator: Run without dialog, automatic data backup | ||
| 9 | CUOBJ | Configuration (internal object number) | ||
| 10 | DATUV | Valid-From Date | ||
| 11 | DATUV | Valid-From Date | ||
| 12 | EXT_SYST | Copy data from external systems via user exit | ||
| 13 | FLG_PROTO | Generate Log | ||
| 14 | KOKRS | Controlling Area | ||
| 15 | MAKTX | Material description | ||
| 16 | MATNR | Material Number | ||
| 17 | NW_AUFNR | Network number | ||
| 18 | NW_AUFNR | Network number | ||
| 19 | POSNR_VA | Sales Document Item | ||
| 20 | PROFILE_PPE | Profile for BOM Transfer | ||
| 21 | PS_POSID | Work Breakdown Structure Element (WBS Element) | ||
| 22 | PS_POSID | Work Breakdown Structure Element (WBS Element) | ||
| 23 | PS_POSNR | WBS Element | ||
| 24 | PS_POSNR | WBS Element | ||
| 25 | PS_PRDEF | Internal number for project definition | ||
| 26 | PS_PSPID | Project definition | ||
| 27 | SERNR | BOM explosion number | ||
| 28 | STLAL | Alternative BOM | ||
| 29 | STLAN | BOM Usage | ||
| 30 | STLTY | BOM Category | ||
| 31 | STNUM | Bill of Material | ||
| 32 | TECHS | Parameter Variant/Standard Variant | ||
| 33 | VBELN_VA | Sales Document | ||
| 34 | WERKS_D | Plant | ||
| 35 | XFELD | Checkbox | ||
| 36 | XFELD | Checkbox | ||
| 37 | XFELD | Checkbox |