SAP ABAP Data Element CN_MEHRS (Multilevel BOM Explosion)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ PS-MAT (Application Component) Material
⤷ CN_MAT (Package) Material for the project
⤷ PS-MAT (Application Component) Material
⤷ CN_MAT (Package) Material for the project
Basic Data
Data Element | CN_MEHRS |
Short Description | Multilevel BOM Explosion |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Multilev. |
Medium | 15 | Multilevel |
Long | 20 | Multilevel |
Heading | 0 |
Documentation
Definition
You use this indicator to specify that the multi-level bill of material for the assignemet is exploded level by level.
Dependencies
If you set this indicator, you must also set the Prelim. reqmts indicator. If you do not, the requirements may be generated by the network as well as by material requirements planning since a multi-level BOM explosion is always carried out during material requirement planning. This would result in excess requirements.
Supplementary Documentation - CN_MEHRS 0010
Dependencies
If you execute a multi-level BOM explosion here, requirements can be generated from the networks and also in MRP. This means that the multiple requirements could exist, since MRP always explodes all the levels of the BOM.
History
Last changed by/on | SAP | 19990223 |
SAP Release Created in |