SAP ABAP Data Element CN_MEHRS (Multilevel BOM Explosion)
Hierarchy
SAP_APPL (Software Component) Logistics and Accounting
   PS-MAT (Application Component) Material
     CN_MAT (Package) Material for the project
Basic Data
Data Element CN_MEHRS
Short Description Multilevel BOM Explosion  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type XFELD    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Multilev. 
Medium 15 Multilevel 
Long 20 Multilevel 
Heading  
Documentation

Definition

You use this indicator to specify that the multi-level bill of material for the assignemet is exploded level by level.

Dependencies

If you set this indicator, you must also set the Prelim. reqmts indicator. If you do not, the requirements may be generated by the network as well as by material requirements planning since a multi-level BOM explosion is always carried out during material requirement planning. This would result in excess requirements.

Supplementary Documentation - CN_MEHRS 0010

Dependencies

If you execute a multi-level BOM explosion here, requirements can be generated from the networks and also in MRP. This means that the multiple requirements could exist, since MRP always explodes all the levels of the BOM.

History
Last changed by/on SAP  19990223 
SAP Release Created in