SAP ABAP Table RCNIP01 (Selection criteria for BOM allocation to PS)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷
PS-MAT (Application Component) Material
⤷
CN_MAT (Package) Material for the project
⤷
⤷
Basic Data
| Table Category | INTTAB | Structure |
| Structure | RCNIP01 |
|
| Short Description | Selection criteria for BOM allocation to PS |
Delivery and Maintenance
| Pool/cluster | ||
| Delivery Class | ||
| Data Browser/Table View Maintenance | Display/Maintenance Allowed with Restrictions |
Components
| |
Field | Key | Data Element | Domain | Data Type |
Length | Decimal Places |
Short Description | Check table |
|---|---|---|---|---|---|---|---|---|---|
| 1 | |
PS_PRDEF | PS_PSPNR | NUMC | 8 | 0 | Internal number for project definition | PROJ | |
| 2 | |
PS_PSPID | PS_PSPID | CHAR | 24 | 0 | Project definition | ||
| 3 | |
PS_POSNR | PS_POSNR | NUMC | 8 | 0 | WBS Element | PRPS | |
| 4 | |
PS_POSID | PS_POSID | CHAR | 24 | 0 | Work Breakdown Structure Element (WBS Element) | ||
| 5 | |
PS_POSNR | PS_POSNR | NUMC | 8 | 0 | WBS Element | PRPS | |
| 6 | |
VBELN_VA | VBELN | CHAR | 10 | 0 | Sales Document | VBUK | |
| 7 | |
POSNR_VA | POSNR | NUMC | 6 | 0 | Sales Document Item | VBUP | |
| 8 | |
MATNR | MATNR | CHAR | 18 | 0 | Material Number | MARA | |
| 9 | |
BDMNG | MENG13 | QUAN | 13 | 3 | Requirement Quantity | ||
| 10 | |
WERKS_D | WERKS | CHAR | 4 | 0 | Plant | T001W | |
| 11 | |
CN_MEHRS | XFELD | CHAR | 1 | 0 | Multilevel BOM Explosion | ||
| 12 | |
EXT_SYST | XFELD | CHAR | 1 | 0 | Copy data from external systems via user exit | ||
| 13 | |
CN_FLG_ALL | XFELD | CHAR | 1 | 0 | Copy all bill of material items | ||
| 14 | |
CN_FLG_PRE | XFELD | CHAR | 1 | 0 | In general generate preliminary requirements | ||
| 15 | |
MAT_BOM | XFELD | CHAR | 1 | 0 | Indicator: only take material BOMs into account | ||
| 16 | |
SALES_BOM | XFELD | CHAR | 1 | 0 | Indicator: Take sales order BOM into account | ||
| 17 | |
PROJ_BOM | XFELD | CHAR | 1 | 0 | Indicator: Take project BOMs into account | ||
| 18 | |
CN_UNIQUE | XFELD | CHAR | 1 | 0 | Indicator: Ambiguity check for reference points | ||
| 19 | |
CN_AENNR | XFELD | CHAR | 1 | 0 | Only items changed with the given change number | ||
| 20 | |
CAPID | CAPID | CHAR | 4 | 0 | Application | TC04 | |
| 21 | |
STLAN | STLAN | CHAR | 1 | 0 | BOM Usage | T416 | |
| 22 | |
MAKTX | TEXT40 | CHAR | 40 | 0 | Material description | ||
| 23 | |
AENNR | AENNR | CHAR | 12 | 0 | Change Number | AENR | |
| 24 | |
DATUV | DATUM | DATS | 8 | 0 | Valid-From Date | ||
| 25 | |
CN_NODLG | XFELD | CHAR | 1 | 0 | Indicator: Run without dialog, automatic data backup | ||
| 26 | |
DATUV | DATUM | DATS | 8 | 0 | Valid-From Date | ||
| 27 | |
STLTY | STLTY | CHAR | 1 | 0 | BOM Category | ||
| 28 | |
STNUM | STNUM | CHAR | 8 | 0 | Bill of Material | ||
| 29 | |
STLAL | ALTNR | CHAR | 2 | 0 | Alternative BOM | ||
| 30 | |
KOKRS | CACCD | CHAR | 4 | 0 | Controlling Area | * | |
| 31 | |
NW_AUFNR | AUFNR | CHAR | 12 | 0 | Network number | AUFK | |
| 32 | |
NW_AUFNR | AUFNR | CHAR | 12 | 0 | Network number | AUFK | |
| 33 | |
PROFILE_IF | PROFILE_IF | CHAR | 4 | 0 | Profile for BOM transfer | TCNIFP | |
| 34 | |
CN_AVCHK | XFELD | CHAR | 1 | 0 | Availability check during save | ||
| 35 | |
CUOBJ | CUOBJ | NUMC | 18 | 0 | Configuration (internal object number) | ||
| 36 | |
TECHS | TECHS | CHAR | 12 | 0 | Parameter Variant/Standard Variant | ||
| 37 | |
SERNR | SERNR | CHAR | 8 | 0 | BOM explosion number | * | |
| 38 | |
VBELN_VA | VBELN | CHAR | 10 | 0 | Sales Document | VBUK | |
| 39 | |
POSNR_VA | POSNR | NUMC | 6 | 0 | Sales Document Item | * | |
| 40 | |
PS_POSNR | PS_POSNR | NUMC | 8 | 0 | WBS Element | PRPS | |
| 41 | |
CN_MRPOFFST | XFELD | CHAR | 1 | 0 | Check Requirements Date | ||
| 42 | |
CN10_OFFSET | INT3 | NUMC | 3 | 0 | Time Interval (In Days) for Determining Requirements Date | ||
| 43 | |
CC_AEFRK | CC_XFELD | CHAR | 1 | 0 | Release for costing | ||
| 44 | |
CC_AEFRP | CC_XFELD | CHAR | 1 | 0 | Release for planning | ||
| 45 | |
CC_AEFRF | CC_XFELD | CHAR | 1 | 0 | Release for production | ||
| 46 | |
CC_AEFRS | CC_XFELD | CHAR | 1 | 0 | Release for simulation | ||
| 47 | |
CS_MAXST | DEC3 | DEC | 3 | 0 | Maximum explosion level of the BOM |
Foreign Keys
| |
Source Table | Source Column | Foreign Table | Foreign Column | Dependency Factor | Cardinality left | Cardinality right |
|---|---|---|---|---|---|---|---|
| 1 | RCNIP01 | AENNR | |
|
C | CN | |
| 2 | RCNIP01 | CAPID | |
|
1 | CN | |
| 3 | RCNIP01 | MATNR | |
|
1 | CN | |
| 4 | RCNIP01 | NPLNR_HIGH | |
|
C | CN | |
| 5 | RCNIP01 | NPLNR_LOW | |
|
C | CN | |
| 6 | RCNIP01 | POSNR | |
|
1 | CN | |
| 7 | RCNIP01 | PROFILE | |
|
C | CN | |
| 8 | RCNIP01 | PRONR | |
|
C | CN | |
| 9 | RCNIP01 | PSPNR_BOM | |
|
1 | N | |
| 10 | RCNIP01 | PSPNR_HIGH | |
|
1 | CN | |
| 11 | RCNIP01 | PSPNR_LOW | |
|
1 | CN | |
| 12 | RCNIP01 | STLAN | |
|
1 | CN | |
| 13 | RCNIP01 | VBELN | |
|
1 | CN | |
| 14 | RCNIP01 | VBELN_BOM | |
|
1 | N | |
| 15 | RCNIP01 | WERKS | |
|
1 | CN |
History
| Last changed by/on | SAP | 20130529 |
| SAP Release Created in |