SAP ABAP Table RCNIP01 (Selection criteria for BOM allocation to PS)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷
PS-MAT (Application Component) Material
⤷
CN_MAT (Package) Material for the project

⤷

⤷

Basic Data
Table Category | INTTAB | Structure |
Structure | RCNIP01 |
![]() |
Short Description | Selection criteria for BOM allocation to PS |
Delivery and Maintenance
Pool/cluster | ||
Delivery Class | ||
Data Browser/Table View Maintenance | Display/Maintenance Allowed with Restrictions |
Components
![]() |
Field | Key | Data Element | Domain | Data Type |
Length | Decimal Places |
Short Description | Check table |
---|---|---|---|---|---|---|---|---|---|
1 | ![]() |
PS_PRDEF | PS_PSPNR | NUMC | 8 | 0 | Internal number for project definition | PROJ | |
2 | ![]() |
PS_PSPID | PS_PSPID | CHAR | 24 | 0 | Project definition | ||
3 | ![]() |
PS_POSNR | PS_POSNR | NUMC | 8 | 0 | WBS Element | PRPS | |
4 | ![]() |
PS_POSID | PS_POSID | CHAR | 24 | 0 | Work Breakdown Structure Element (WBS Element) | ||
5 | ![]() |
PS_POSNR | PS_POSNR | NUMC | 8 | 0 | WBS Element | PRPS | |
6 | ![]() |
VBELN_VA | VBELN | CHAR | 10 | 0 | Sales Document | VBUK | |
7 | ![]() |
POSNR_VA | POSNR | NUMC | 6 | 0 | Sales Document Item | VBUP | |
8 | ![]() |
MATNR | MATNR | CHAR | 18 | 0 | Material Number | MARA | |
9 | ![]() |
BDMNG | MENG13 | QUAN | 13 | 3 | Requirement Quantity | ||
10 | ![]() |
WERKS_D | WERKS | CHAR | 4 | 0 | Plant | T001W | |
11 | ![]() |
CN_MEHRS | XFELD | CHAR | 1 | 0 | Multilevel BOM Explosion | ||
12 | ![]() |
EXT_SYST | XFELD | CHAR | 1 | 0 | Copy data from external systems via user exit | ||
13 | ![]() |
CN_FLG_ALL | XFELD | CHAR | 1 | 0 | Copy all bill of material items | ||
14 | ![]() |
CN_FLG_PRE | XFELD | CHAR | 1 | 0 | In general generate preliminary requirements | ||
15 | ![]() |
MAT_BOM | XFELD | CHAR | 1 | 0 | Indicator: only take material BOMs into account | ||
16 | ![]() |
SALES_BOM | XFELD | CHAR | 1 | 0 | Indicator: Take sales order BOM into account | ||
17 | ![]() |
PROJ_BOM | XFELD | CHAR | 1 | 0 | Indicator: Take project BOMs into account | ||
18 | ![]() |
CN_UNIQUE | XFELD | CHAR | 1 | 0 | Indicator: Ambiguity check for reference points | ||
19 | ![]() |
CN_AENNR | XFELD | CHAR | 1 | 0 | Only items changed with the given change number | ||
20 | ![]() |
CAPID | CAPID | CHAR | 4 | 0 | Application | TC04 | |
21 | ![]() |
STLAN | STLAN | CHAR | 1 | 0 | BOM Usage | T416 | |
22 | ![]() |
MAKTX | TEXT40 | CHAR | 40 | 0 | Material description | ||
23 | ![]() |
AENNR | AENNR | CHAR | 12 | 0 | Change Number | AENR | |
24 | ![]() |
DATUV | DATUM | DATS | 8 | 0 | Valid-From Date | ||
25 | ![]() |
CN_NODLG | XFELD | CHAR | 1 | 0 | Indicator: Run without dialog, automatic data backup | ||
26 | ![]() |
DATUV | DATUM | DATS | 8 | 0 | Valid-From Date | ||
27 | ![]() |
STLTY | STLTY | CHAR | 1 | 0 | BOM Category | ||
28 | ![]() |
STNUM | STNUM | CHAR | 8 | 0 | Bill of Material | ||
29 | ![]() |
STLAL | ALTNR | CHAR | 2 | 0 | Alternative BOM | ||
30 | ![]() |
KOKRS | CACCD | CHAR | 4 | 0 | Controlling Area | * | |
31 | ![]() |
NW_AUFNR | AUFNR | CHAR | 12 | 0 | Network number | AUFK | |
32 | ![]() |
NW_AUFNR | AUFNR | CHAR | 12 | 0 | Network number | AUFK | |
33 | ![]() |
PROFILE_IF | PROFILE_IF | CHAR | 4 | 0 | Profile for BOM transfer | TCNIFP | |
34 | ![]() |
CN_AVCHK | XFELD | CHAR | 1 | 0 | Availability check during save | ||
35 | ![]() |
CUOBJ | CUOBJ | NUMC | 18 | 0 | Configuration (internal object number) | ||
36 | ![]() |
TECHS | TECHS | CHAR | 12 | 0 | Parameter Variant/Standard Variant | ||
37 | ![]() |
SERNR | SERNR | CHAR | 8 | 0 | BOM explosion number | * | |
38 | ![]() |
VBELN_VA | VBELN | CHAR | 10 | 0 | Sales Document | VBUK | |
39 | ![]() |
POSNR_VA | POSNR | NUMC | 6 | 0 | Sales Document Item | * | |
40 | ![]() |
PS_POSNR | PS_POSNR | NUMC | 8 | 0 | WBS Element | PRPS | |
41 | ![]() |
CN_MRPOFFST | XFELD | CHAR | 1 | 0 | Check Requirements Date | ||
42 | ![]() |
CN10_OFFSET | INT3 | NUMC | 3 | 0 | Time Interval (In Days) for Determining Requirements Date | ||
43 | ![]() |
CC_AEFRK | CC_XFELD | CHAR | 1 | 0 | Release for costing | ||
44 | ![]() |
CC_AEFRP | CC_XFELD | CHAR | 1 | 0 | Release for planning | ||
45 | ![]() |
CC_AEFRF | CC_XFELD | CHAR | 1 | 0 | Release for production | ||
46 | ![]() |
CC_AEFRS | CC_XFELD | CHAR | 1 | 0 | Release for simulation | ||
47 | ![]() |
CS_MAXST | DEC3 | DEC | 3 | 0 | Maximum explosion level of the BOM |
Foreign Keys
![]() |
Source Table | Source Column | Foreign Table | Foreign Column | Dependency Factor | Cardinality left | Cardinality right |
---|---|---|---|---|---|---|---|
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
1 | RCNIP01 | AENNR | ![]() |
![]() |
C | CN | |
2 | RCNIP01 | CAPID | ![]() |
![]() |
1 | CN | |
3 | RCNIP01 | MATNR | ![]() |
![]() |
1 | CN | |
4 | RCNIP01 | NPLNR_HIGH | ![]() |
![]() |
C | CN | |
5 | RCNIP01 | NPLNR_LOW | ![]() |
![]() |
C | CN | |
6 | RCNIP01 | POSNR | ![]() |
![]() |
1 | CN | |
7 | RCNIP01 | PROFILE | ![]() |
![]() |
C | CN | |
8 | RCNIP01 | PRONR | ![]() |
![]() |
C | CN | |
9 | RCNIP01 | PSPNR_BOM | ![]() |
![]() |
1 | N | |
10 | RCNIP01 | PSPNR_HIGH | ![]() |
![]() |
1 | CN | |
11 | RCNIP01 | PSPNR_LOW | ![]() |
![]() |
1 | CN | |
12 | RCNIP01 | STLAN | ![]() |
![]() |
1 | CN | |
13 | RCNIP01 | VBELN | ![]() |
![]() |
1 | CN | |
14 | RCNIP01 | VBELN_BOM | ![]() |
![]() |
1 | N | |
15 | RCNIP01 | WERKS | ![]() |
![]() |
1 | CN |
History
Last changed by/on | SAP | 20130529 |
SAP Release Created in |