SAP ABAP Table PPE_PSIF01 (Selection Criteria for BOM Assignment to PS)
Hierarchy
☛
EA-APPL (Software Component) SAP Enterprise Extension PLM, SCM, Financials
⤷ LO-MD-PPE (Application Component) Integrated Product and Process Engineering
⤷ CPPEPRO (Package) iPPE Objects in the Project System Connection
⤷ LO-MD-PPE (Application Component) Integrated Product and Process Engineering
⤷ CPPEPRO (Package) iPPE Objects in the Project System Connection
Basic Data
Table Category | INTTAB | Structure |
Structure | PPE_PSIF01 | Table Relationship Diagram |
Short Description | Selection Criteria for BOM Assignment to PS |
Delivery and Maintenance
Pool/cluster | ||
Delivery Class | ||
Data Browser/Table View Maintenance | Display/Maintenance Allowed with Restrictions |
Components
Field | Key | Data Element | Domain | Data Type |
Length | Decimal Places |
Short Description | Check table |
|
---|---|---|---|---|---|---|---|---|---|
1 | PRONR | PS_PRDEF | PS_PSPNR | NUMC | 8 | 0 | Internal number for project definition | PROJ | |
2 | PSPID | PS_PSPID | PS_PSPID | CHAR | 24 | 0 | Project definition | ||
3 | PSPNR_LOW | PS_POSNR | PS_POSNR | NUMC | 8 | 0 | WBS Element | PRPS | |
4 | POSID_HIGH | PS_POSID | PS_POSID | CHAR | 24 | 0 | Work Breakdown Structure Element (WBS Element) | ||
5 | POSID_LOW | PS_POSID | PS_POSID | CHAR | 24 | 0 | Work Breakdown Structure Element (WBS Element) | ||
6 | PSPNR_HIGH | PS_POSNR | PS_POSNR | NUMC | 8 | 0 | WBS Element | PRPS | |
7 | VBELN | VBELN_VA | VBELN | CHAR | 10 | 0 | Sales Document | VBUK | |
8 | POSNR | POSNR_VA | POSNR | NUMC | 6 | 0 | Sales Document Item | VBUP | |
9 | MATNR | MATNR | MATNR | CHAR | 18 | 0 | Material Number | MARA | |
10 | BDMNG | BDMNG | MENG13 | QUAN | 13 | 3 | Requirement Quantity | ||
11 | WERKS | WERKS_D | WERKS | CHAR | 4 | 0 | Plant | T001W | |
12 | MEHRS | CN_MEHRS | XFELD | CHAR | 1 | 0 | Multilevel BOM Explosion | ||
13 | FLG_FOKUS | XFELD | XFELD | CHAR | 1 | 0 | Checkbox | ||
14 | FLG_PVS | XFELD | XFELD | CHAR | 1 | 0 | Checkbox | ||
15 | FLG_RESOURCE | XFELD | XFELD | CHAR | 1 | 0 | Checkbox | ||
16 | FLG_EXT | EXT_SYST | XFELD | CHAR | 1 | 0 | Copy data from external systems via user exit | ||
17 | FLG_PRE | CN_FLG_PRE | XFELD | CHAR | 1 | 0 | In general generate preliminary requirements | ||
18 | FLG_AENNR | CN_AENNR | XFELD | CHAR | 1 | 0 | Only items changed with the given change number | ||
19 | CAPID | CAPID | CAPID | CHAR | 4 | 0 | Application | TC04 | |
20 | STLAN | STLAN | STLAN | CHAR | 1 | 0 | BOM Usage | T416 | |
21 | MAKTX | MAKTX | TEXT40 | CHAR | 40 | 0 | Material description | ||
22 | AENNR | AENNR | AENNR | CHAR | 12 | 0 | Change Number | AENR | |
23 | STTAG | DATUV | DATUM | DATS | 8 | 0 | Valid-From Date | ||
24 | NODLG | CN_NODLG | XFELD | CHAR | 1 | 0 | Indicator: Run without dialog, automatic data backup | ||
25 | PROT_AB | DATUV | DATUM | DATS | 8 | 0 | Valid-From Date | ||
26 | STLTY | STLTY | STLTY | CHAR | 1 | 0 | BOM Category | ||
27 | STLNR | STNUM | STNUM | CHAR | 8 | 0 | Bill of Material | ||
28 | STLAL | STLAL | ALTNR | CHAR | 2 | 0 | Alternative BOM | ||
29 | KOKRS | KOKRS | CACCD | CHAR | 4 | 0 | Controlling Area | * | |
30 | NPLNR_LOW | NW_AUFNR | AUFNR | CHAR | 12 | 0 | Network number | AUFK | |
31 | NPLNR_HIGH | NW_AUFNR | AUFNR | CHAR | 12 | 0 | Network number | AUFK | |
32 | PROFILE | PROFILE_PPE | PROFILE_IF | CHAR | 4 | 0 | Profile for BOM Transfer | PROFILCUST01 | |
33 | AV_CHECK | CN_AVCHK | XFELD | CHAR | 1 | 0 | Availability check during save | ||
34 | CUOBJ | CUOBJ | CUOBJ | NUMC | 18 | 0 | Configuration (internal object number) | ||
35 | TECHS | TECHS | TECHS | CHAR | 12 | 0 | Parameter Variant/Standard Variant | ||
36 | SERNR | SERNR | SERNR | CHAR | 8 | 0 | BOM explosion number | * | |
37 | FLG_PROTOCOL | FLG_PROTO | XFELD | CHAR | 1 | 0 | Generate Log |
Foreign Keys
Source Table | Source Column | Foreign Table | Foreign Column | Dependency Factor | Cardinality left | Cardinality right | |
---|---|---|---|---|---|---|---|
1 | PPE_PSIF01 | AENNR | AENR | AENNR | C | CN | |
2 | PPE_PSIF01 | CAPID | TC04 | CAPID | 1 | CN | |
3 | PPE_PSIF01 | MATNR | MARA | MATNR | 1 | CN | |
4 | PPE_PSIF01 | NPLNR_HIGH | AUFK | AUFNR | C | CN | |
5 | PPE_PSIF01 | NPLNR_LOW | AUFK | AUFNR | C | CN | |
6 | PPE_PSIF01 | POSNR | VBUP | POSNR | 1 | CN | |
7 | PPE_PSIF01 | PROFILE | PROFILCUST01 | PROFILE | C | CN | |
8 | PPE_PSIF01 | PRONR | PROJ | PSPNR | C | CN | |
9 | PPE_PSIF01 | PSPNR_HIGH | PRPS | PSPNR | 1 | CN | |
10 | PPE_PSIF01 | PSPNR_LOW | PRPS | PSPNR | 1 | CN | |
11 | PPE_PSIF01 | STLAN | T416 | STLAN | 1 | CN | |
12 | PPE_PSIF01 | VBELN | VBUK | VBELN | 1 | CN | |
13 | PPE_PSIF01 | WERKS | T001W | WERKS | 1 | CN |
History
Last changed by/on | SAP | 20130529 |
SAP Release Created in | 46C2 |