Data Element list used by SAP ABAP Table MDKP (Header Data for MRP Document)
SAP ABAP Table
MDKP (Header Data for MRP Document) is using
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
![]() |
![]() |
|||
1 | ![]() |
AHDIS | MRP relevancy for dependent requirements | |
2 | ![]() |
AUSDT | Effective-out date | |
3 | ![]() |
AUSZX | Exception group in the MRP list | |
4 | ![]() |
AUSZX | Exception group in the MRP list | |
5 | ![]() |
AUSZX | Exception group in the MRP list | |
6 | ![]() |
AUSZX | Exception group in the MRP list | |
7 | ![]() |
AUSZX | Exception group in the MRP list | |
8 | ![]() |
AUSZX | Exception group in the MRP list | |
9 | ![]() |
AUSZX | Exception group in the MRP list | |
10 | ![]() |
AUSZX | Exception group in the MRP list | |
11 | ![]() |
BDARF | Requirements quantity from material requirements planning | |
12 | ![]() |
BDBKZ | Selection indicator for processed MRP lists | |
13 | ![]() |
BEADA | MRP list processing date | |
14 | ![]() |
BEAZT | Processing time for purchase order proposal | |
15 | ![]() |
BERW1 | Stock Days' Supply Without Receipts | |
16 | ![]() |
BERW2 | First Receipt Days' Supply | |
17 | ![]() |
BERW4 | Second Receipt Days' Supply | |
18 | ![]() |
BESKZ | Procurement Type | |
19 | ![]() |
BSKFL | Flag whether stock correction factors exist | |
20 | ![]() |
BSTFE | Fixed lot size | |
21 | ![]() |
BSTMA | Maximum lot size | |
22 | ![]() |
BSTMI | Minimum lot size | |
23 | ![]() |
BSTRF | Rounding value for purchase order quantity | |
24 | ![]() |
COMPMRPL | Aggregated MRP list | |
25 | ![]() |
DISGR | MRP Group | |
26 | ![]() |
DISLS | Lot size (materials planning) | |
27 | ![]() |
DISMM | MRP Type | |
28 | ![]() |
DISPO | MRP controller | |
29 | ![]() |
DISST | Low-level code | |
30 | ![]() |
DISVF | MRP procedure | |
31 | ![]() |
DSDAT | MRP date | |
32 | ![]() |
DTART | Type of MRP list | |
33 | ![]() |
DTNUM | Number of material requirements planning table | |
34 | ![]() |
EISBE | Safety stock | |
35 | ![]() |
EKGRP | Purchasing group | |
36 | ![]() |
FABKZ | Indicator: Item Relevant to JIT Delivery Schedules | |
37 | ![]() |
FIXTR | End of planning time fence (date) | |
38 | ![]() |
GRREL | Relevant for requirements grouping for project stock | |
39 | ![]() |
KZAUS | Discontinuation indicator | |
40 | ![]() |
KZPROMO | Indicator: Material in promotion | |
41 | ![]() |
LFRHY | Planning cycle | |
42 | ![]() |
LOSKZ | Lot-size indicator for the short-term period | |
43 | ![]() |
LOSVF | Lot-sizing procedure for short-term period | |
44 | ![]() |
MAABC | ABC indicator | |
45 | ![]() |
MABST | Maximum stock level | |
46 | ![]() |
MANDT | Client | |
47 | ![]() |
MATNR | Material Number | |
48 | ![]() |
MD_BADI_ON | Indicator: BAdI is Active | |
49 | ![]() |
MEINS | Base Unit of Measure | |
50 | ![]() |
MFHKZ | Planning time fence set manually (MFXDT) | |
51 | ![]() |
MFXDT | Manual firming date | |
52 | ![]() |
MINBE | Reorder point | |
53 | ![]() |
MRPPP | PPC planning calendar | |
54 | ![]() |
MSGID | Message identification | |
55 | ![]() |
MSGNR | Message number | |
56 | ![]() |
MSGTY | Message Type | |
57 | ![]() |
MSGV1 | Message variable 01 | |
58 | ![]() |
MSGV2 | Message variable 02 | |
59 | ![]() |
MSGV3 | Message variable 03 | |
60 | ![]() |
MSGV4 | Message variable 04 | |
61 | ![]() |
MTART | Material type | |
62 | ![]() |
MTWZT | Material replenishment lead time | |
63 | ![]() |
NAUKZ | Indicator: new exception in the MRP list | |
64 | ![]() |
NEGBS | Negative stock | |
65 | ![]() |
NFMAT | Follow-up material | |
66 | ![]() |
NOUSE | No longer used/do not use!! | |
67 | ![]() |
NOUSE | No longer used/do not use!! | |
68 | ![]() |
NOUSE | No longer used/do not use!! | |
69 | ![]() |
NOUSE | No longer used/do not use!! | |
70 | ![]() |
PERAZ | Number of periods for the short-term area | |
71 | ![]() |
PERIV | Fiscal Year Variant | |
72 | ![]() |
PLDIS | Planning controller (no longer used) | |
73 | ![]() |
PLSCN | Planning Scenario of Long-Term Planning | |
74 | ![]() |
PPH_HANA_ON | HANA Optimizations Active / Inactive | |
75 | ![]() |
RDPRF | Rounding Profile | |
76 | ![]() |
RWPRO | Range of coverage profile | |
77 | ![]() |
SA_SAUFT | Ind.: Repetitive mfg allowed | |
78 | ![]() |
SHFLG | Safety time indicator (with or without safety time) | |
79 | ![]() |
SHPRO | Period profile for safety time | |
80 | ![]() |
SHZET | Safety time (in workdays) | |
81 | ![]() |
SLKZX | Selection indicator for exception groups | |
82 | ![]() |
SLKZX | Selection indicator for exception groups | |
83 | ![]() |
SLKZX | Selection indicator for exception groups | |
84 | ![]() |
SLKZX | Selection indicator for exception groups | |
85 | ![]() |
SLKZX | Selection indicator for exception groups | |
86 | ![]() |
SLKZX | Selection indicator for exception groups | |
87 | ![]() |
SLKZX | Selection indicator for exception groups | |
88 | ![]() |
SLKZX | Selection indicator for exception groups | |
89 | ![]() |
SOBES | Special procurement type | |
90 | ![]() |
SOBSL | Special procurement type | |
91 | ![]() |
SUM01W | Plant stock / only plant segment | |
92 | ![]() |
VRKZ1 | Processing indicator 01 | |
93 | ![]() |
VRKZ2 | Processing indicator 02 | |
94 | ![]() |
VRKZ3 | Processing indicator - 03 | |
95 | ![]() |
WEBAZ | Goods receipt processing time in days | |
96 | ![]() |
WERKS_D | Plant | |
97 | ![]() |
WRK02 | Planning/production plant |