SAP ABAP Data Element MSGTY (Message Type)
Hierarchy
☛
SAP_ABA (Software Component) Cross-Application Component
⤷
CA-GTF-PS (Application Component) Cross-Application Objects in Project System
⤷
BC (Package) Cross-Application Objects PP/PS
⤷
⤷
Basic Data
| Data Element | MSGTY |
| Short Description | Message Type |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | MSGAR | |
| Data Type | CHAR | Character String |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | MESSAGE_TYPE | |
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | MessageTyp |
| Medium | 15 | Message Type |
| Long | 20 | Message Type |
| Heading | 2 | MT |
Documentation
Definition
Message type (E,I,W,...)
Supplementary Documentation - MSGTY 0110
Definition
Key you use to specify what happens if
- The operation sequence is not adhered to during confirmation.
For example, you want to confirm operation 20 before operation 10 has been confirmed.
- You want to confirm a greater quantity than was confirmed for the previous operation.
Here, the system checks the quantity to be confirmed (yield + reworked quantity + scrap) against the confirmed yield + rework quantity from the previous operation.
You can choose between the following:
- information message
- error message
- termination message
- message on the following screen
Dependencies
A milestone confirmation cannot be confirmed until the previous milestone operation has at least been "partially confirmed".
History
| Last changed by/on | SAP | 19990629 |
| SAP Release Created in |