Data Element list used by SAP ABAP Table BAPI_MRP_LIST (MRP: MRP List)
SAP ABAP Table
BAPI_MRP_LIST (MRP: MRP List) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | AHDIS | MRP relevancy for dependent requirements | ||
| 2 | AUSDT | Effective-out date | ||
| 3 | AUSZX | Exception group in the MRP list | ||
| 4 | AUSZX | Exception group in the MRP list | ||
| 5 | AUSZX | Exception group in the MRP list | ||
| 6 | AUSZX | Exception group in the MRP list | ||
| 7 | AUSZX | Exception group in the MRP list | ||
| 8 | AUSZX | Exception group in the MRP list | ||
| 9 | AUSZX | Exception group in the MRP list | ||
| 10 | AUSZX | Exception group in the MRP list | ||
| 11 | BDARF | Requirements quantity from material requirements planning | ||
| 12 | BDBKZ | Selection indicator for processed MRP lists | ||
| 13 | BEADA | MRP list processing date | ||
| 14 | BEAZT | Processing time for purchase order proposal | ||
| 15 | BERW1 | Stock Days' Supply Without Receipts | ||
| 16 | BERW2 | First Receipt Days' Supply | ||
| 17 | BERW4 | Second Receipt Days' Supply | ||
| 18 | BESKZ | Procurement Type | ||
| 19 | BSKFL | Flag whether stock correction factors exist | ||
| 20 | BSTFE | Fixed lot size | ||
| 21 | BSTMA | Maximum lot size | ||
| 22 | BSTMI | Minimum lot size | ||
| 23 | BSTRF | Rounding value for purchase order quantity | ||
| 24 | COMPMRPL | Aggregated MRP list | ||
| 25 | DISGR | MRP Group | ||
| 26 | DISLS | Lot size (materials planning) | ||
| 27 | DISMM | MRP Type | ||
| 28 | DISPO | MRP controller | ||
| 29 | DISST | Low-level code | ||
| 30 | DISVF | MRP procedure | ||
| 31 | DSDAT | MRP date | ||
| 32 | DSTIME | MRP Time | ||
| 33 | DTART | Type of MRP list | ||
| 34 | DTNUM | Number of material requirements planning table | ||
| 35 | EISBE | Safety stock | ||
| 36 | EKGRP | Purchasing group | ||
| 37 | FABKZ | Indicator: Item Relevant to JIT Delivery Schedules | ||
| 38 | FIXTR | End of planning time fence (date) | ||
| 39 | GRREL | Relevant for requirements grouping for project stock | ||
| 40 | ISOCD_UNIT | ISO code for unit of measurement | ||
| 41 | KZAUS | Discontinuation indicator | ||
| 42 | KZPROMO | Indicator: Material in promotion | ||
| 43 | LFRHY | Planning cycle | ||
| 44 | LOSKZ | Lot-size indicator for the short-term period | ||
| 45 | LOSVF | Lot-sizing procedure for short-term period | ||
| 46 | MAABC | ABC indicator | ||
| 47 | MABST | Maximum stock level | ||
| 48 | MATNR | Material Number | ||
| 49 | MD_BADI_ON | Indicator: BAdI is Active | ||
| 50 | MEINS | Base Unit of Measure | ||
| 51 | MFHKZ | Planning time fence set manually (MFXDT) | ||
| 52 | MFXDT | Manual firming date | ||
| 53 | MGV_FOLLOW_UP_EXTERNAL | Long Material Number for field FOLLOW_UP | ||
| 54 | MGV_FOLLOW_UP_GUID | External GUID for FOLLOW_UP Field | ||
| 55 | MGV_FOLLOW_UP_VERSION | Version Number for FOLLOW_UP Field | ||
| 56 | MGV_MATERIAL_EXTERNAL | Long Material Number for MATERIAL Field | ||
| 57 | MGV_MATERIAL_GUID | External GUID for MATERIAL Field | ||
| 58 | MGV_MATERIAL_VERSION | Version Number for MATERIAL Field | ||
| 59 | MINBE | Reorder point | ||
| 60 | MRPPP | PPC planning calendar | ||
| 61 | MSGID | Message identification | ||
| 62 | MSGNR | Message number | ||
| 63 | MSGTY | Message Type | ||
| 64 | MSGV1 | Message variable 01 | ||
| 65 | MSGV2 | Message variable 02 | ||
| 66 | MSGV3 | Message variable 03 | ||
| 67 | MSGV4 | Message variable 04 | ||
| 68 | MTART | Material type | ||
| 69 | MTWZT | Material replenishment lead time | ||
| 70 | NAUKZ | Indicator: new exception in the MRP list | ||
| 71 | NEGBS | Negative stock | ||
| 72 | NFMAT | Follow-up material | ||
| 73 | PERAZ | Number of periods for the short-term area | ||
| 74 | PERIV | Fiscal Year Variant | ||
| 75 | PLSCN | Planning Scenario of Long-Term Planning | ||
| 76 | RDPRF | Rounding Profile | ||
| 77 | RWPRO | Range of coverage profile | ||
| 78 | SA_SAUFT | Ind.: Repetitive mfg allowed | ||
| 79 | SHFLG | Safety time indicator (with or without safety time) | ||
| 80 | SHPRO | Period profile for safety time | ||
| 81 | SHZET | Safety time (in workdays) | ||
| 82 | SLKZX | Selection indicator for exception groups | ||
| 83 | SLKZX | Selection indicator for exception groups | ||
| 84 | SLKZX | Selection indicator for exception groups | ||
| 85 | SLKZX | Selection indicator for exception groups | ||
| 86 | SLKZX | Selection indicator for exception groups | ||
| 87 | SLKZX | Selection indicator for exception groups | ||
| 88 | SLKZX | Selection indicator for exception groups | ||
| 89 | SLKZX | Selection indicator for exception groups | ||
| 90 | SOBES | Special procurement type | ||
| 91 | SOBSL | Special procurement type | ||
| 92 | SUM01W | Plant stock / only plant segment | ||
| 93 | VRKZ1 | Processing indicator 01 | ||
| 94 | VRKZ2 | Processing indicator 02 | ||
| 95 | VRKZ3 | Processing indicator - 03 | ||
| 96 | WEBAZ | Goods receipt processing time in days | ||
| 97 | WERKS_D | Plant | ||
| 98 | WRK02 | Planning/production plant |