SAP ABAP Table RF61D (In/output fields for capacity planning in MPS/MRP (SAPLM61D))
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM (Application Component) Customer Relationship Management
⤷
CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷
MD03 (Package) Appl. development R/3 MPS/determin. requirements planning
⤷
⤷
⤷
Basic Data
| Table Category | INTTAB | Structure |
| Structure | RF61D |
|
| Short Description | In/output fields for capacity planning in MPS/MRP (SAPLM61D) |
Delivery and Maintenance
| Pool/cluster | ||
| Delivery Class | ||
| Data Browser/Table View Maintenance | Display/Maintenance Allowed with Restrictions |
Components
| |
Field | Key | Data Element | Domain | Data Type |
Length | Decimal Places |
Short Description | Check table |
|---|---|---|---|---|---|---|---|---|---|
| 1 | |
ARBPL | ARBPL | CHAR | 8 | 0 | Work center | ||
| 2 | |
STEXT | TEXT40 | CHAR | 40 | 0 | Object Name | ||
| 3 | |
KAPART | KAPART | CHAR | 3 | 0 | Capacity category | * | |
| 4 | |
KAPARTTEXT | TEXT20 | CHAR | 20 | 0 | Description of the capacity category | ||
| 5 | |
KAPNAME | KAPNAME | CHAR | 8 | 0 | Capacity name | ||
| 6 | |
CR_KAPEH | MEINS | UNIT | 3 | 0 | Unit of measure of capacity | * | |
| 7 | |
MSEHT | TEXT10 | CHAR | 10 | 0 | Unit of Measurement Text (Maximum 10 Characters) | ||
| 8 | |
MATNR | MATNR | CHAR | 18 | 0 | Material Number | * | |
| 9 | |
MAKTX | TEXT40 | CHAR | 40 | 0 | Material description | ||
| 10 | |
WERKS_D | WERKS | CHAR | 4 | 0 | Plant | * | |
| 11 | |
PLNUM | PLNUM | CHAR | 10 | 0 | Planned order number | * | |
| 12 | |
PERIOD_DIS | CHAR10 | CHAR | 10 | 0 | Period | ||
| 13 | |
CYSLIANGE | DEC8_2 | DEC | 10 | 2 | Available capacity in a period | ||
| 14 | |
MDRQTOT | DEC6_2 | DEC | 8 | 2 | Capacity requirements of the planning period | ||
| 15 | |
MDRQMAT | DEC6_2 | DEC | 8 | 2 | Capacity requirements caused by material | ||
| 16 | |
MDRQPLA | DEC6_2 | DEC | 8 | 2 | Capacity requirements caused by planned order | ||
| 17 | |
MDPCTOT | CHAR5 | CHAR | 5 | 0 | Capacity utilization of the planning period (as percentage) | ||
| 18 | |
MDPCMAT | CHAR5 | CHAR | 5 | 0 | Capacity utilization by mateiral (as percentage) | ||
| 19 | |
MDPCPLA | CHAR5 | CHAR | 5 | 0 | Capacity utilization by planned order (as percentage) | ||
| 20 | |
FCODE | FCODE | CHAR | 20 | 0 | Function code | ||
| 21 | |
TABIX_D | TABIX | INT4 | 10 | 0 | Field defined as in SY-TABIX | ||
| 22 | |
TABIX_D | TABIX | INT4 | 10 | 0 | Field defined as in SY-TABIX | ||
| 23 | |
GSMNG | MENG13 | QUAN | 13 | 3 | Total planned order quantity | ||
| 24 | |
PSTTR | DATUM | DATS | 8 | 0 | Order start date in planned order | ||
| 25 | |
PEDTR | DATUM | DATS | 8 | 0 | Order finish date in the planned order | ||
| 26 | |
ORDTP | CHAR5 | CHAR | 5 | 0 | Order group abbreviation | ||
| 27 | |
ORDID | AUFNR | CHAR | 12 | 0 | Order number | * | |
| 28 | |
MATNR | MATNR | CHAR | 18 | 0 | Material Number | * | |
| 29 | |
TOTQT | MENG13 | QUAN | 13 | 3 | Total order quantity | ||
| 30 | |
PDATU | DATUM | DATS | 8 | 0 | Order finish date | ||
| 31 | |
CAPRQ | DEC6_2 | DEC | 8 | 2 | Capacity requirements for the order in the selected period | ||
| 32 | |
TRMER | TRMER | CHAR | 2 | 0 | Scheduling error | ||
| 33 | |
DDTEXT | DDTEXT | CHAR | 60 | 0 | Explanatory short text | ||
| 34 | |
XFELD | XFELD | CHAR | 1 | 0 | Checkbox | ||
| 35 | |
MEINS | MEINS | UNIT | 3 | 0 | Base Unit of Measure | * | |
| 36 | |
KAPA_FEIN | XFELD | CHAR | 1 | 0 | Capacity planning using detailed planning | ||
| 37 | |
KAPA_RATE | XFELD | CHAR | 1 | 0 | Capacity planning based on production rates | ||
| 38 | |
KAPA_GROB | XFELD | CHAR | 1 | 0 | Capacity planning using rough-cut planning profile | ||
| 39 | |
SCHED_TYPE | SCHED_TYPE | CHAR | 1 | 0 | Scheduling level | ||
| 40 | |
KTAGE | CHAR1 | CHAR | 1 | 0 | Period grouping according to days | ||
| 41 | |
KWOCH | CHAR1 | CHAR | 1 | 0 | Period grouping according to weeks | ||
| 42 | |
KMONA | CHAR1 | CHAR | 1 | 0 | Period grouping according to months | ||
| 43 | |
KFLPR | CHAR1 | CHAR | 1 | 0 | Period grouping according to posting periods | ||
| 44 | |
KMRPP | CHAR1 | CHAR | 1 | 0 | Period grouping according to planning calendar | ||
| 45 | |
CHAR1 | CHAR1 | CHAR | 1 | 0 | Single-Character Flag | ||
| 46 | |
CHAR1 | CHAR1 | CHAR | 1 | 0 | Single-Character Flag | ||
| 47 | |
CHAR1 | CHAR1 | CHAR | 1 | 0 | Single-Character Flag | ||
| 48 | |
OVERL | CHAR1 | CHAR | 1 | 0 | Indicator: capacity overloaded | ||
| 49 | |
OLOAD | CHAR5 | CHAR | 5 | 0 | Maximum capacity utilization for all periods | ||
| 50 | |
VERID | VERID | CHAR | 4 | 0 | Production Version | MKAL | |
| 51 | |
PWWRK | WERKS | CHAR | 4 | 0 | Production plant in planned order | T001W | |
| 52 | |
KAPFX | XFELD | CHAR | 1 | 0 | Indicator: capacity for planned order dispatched | ||
| 53 | |
MRPPP | MRPPP | CHAR | 3 | 0 | PPC planning calendar | T439G | |
| 54 | |
MAX_OLOAD | INT1 | INT1 | 3 | 0 | Maximum capacity load | ||
| 55 | |
MDCX_FROM | CHAR10 | CHAR | 10 | 0 | First period | ||
| 56 | |
MDCX_TO | CHAR10 | CHAR | 10 | 0 | Last period | ||
| 57 | |
MDOLPLA | XFELD | CHAR | 1 | 0 | Overload check for planned order | ||
| 58 | |
MDOLMAT | XFELD | CHAR | 1 | 0 | Overload check for material | ||
| 59 | |
MDOLTOT | XFELD | CHAR | 1 | 0 | Total capacity overload check | ||
| 60 | |
CY_PLADATV | DATUM | DATS | 8 | 0 | Start of planning period | ||
| 61 | |
CY_PLADATB | DATUM | DATS | 8 | 0 | End of planning period | ||
| 62 | |
WERKS_D | WERKS | CHAR | 4 | 0 | Plant | * | |
| 63 | |
PAART | PAART | CHAR | 4 | 0 | Order type | ||
| 64 | |
ICON_TEXT | SYCHAR132 | CHAR | 132 | 0 | Carrier field for icons |
Foreign Keys
| |
Source Table | Source Column | Foreign Table | Foreign Column | Dependency Factor | Cardinality left | Cardinality right |
|---|---|---|---|---|---|---|---|
| 1 | RF61D | MRPPP | |
|
REF | C | CN |
| 2 | RF61D | PWWRK | |
|
REF | C | CN |
| 3 | RF61D | VERID | |
|
REF | C | CN |
History
| Last changed by/on | SAP | 20130529 |
| SAP Release Created in |