Data Element list used by SAP ABAP Table RF61D (In/output fields for capacity planning in MPS/MRP (SAPLM61D))
SAP ABAP Table
RF61D (In/output fields for capacity planning in MPS/MRP (SAPLM61D)) is using
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
![]() |
![]() |
|||
1 | ![]() |
ARBPL | Work center | |
2 | ![]() |
CAPRQ | Capacity requirements for the order in the selected period | |
3 | ![]() |
CHAR1 | Single-Character Flag | |
4 | ![]() |
CHAR1 | Single-Character Flag | |
5 | ![]() |
CHAR1 | Single-Character Flag | |
6 | ![]() |
CR_KAPEH | Unit of measure of capacity | |
7 | ![]() |
CYSLIANGE | Available capacity in a period | |
8 | ![]() |
CY_PLADATB | End of planning period | |
9 | ![]() |
CY_PLADATV | Start of planning period | |
10 | ![]() |
DDTEXT | Explanatory short text | |
11 | ![]() |
FCODE | Function code | |
12 | ![]() |
GSMNG | Total planned order quantity | |
13 | ![]() |
ICON_TEXT | Carrier field for icons | |
14 | ![]() |
KAPART | Capacity category | |
15 | ![]() |
KAPARTTEXT | Description of the capacity category | |
16 | ![]() |
KAPA_FEIN | Capacity planning using detailed planning | |
17 | ![]() |
KAPA_GROB | Capacity planning using rough-cut planning profile | |
18 | ![]() |
KAPA_RATE | Capacity planning based on production rates | |
19 | ![]() |
KAPFX | Indicator: capacity for planned order dispatched | |
20 | ![]() |
KAPNAME | Capacity name | |
21 | ![]() |
KFLPR | Period grouping according to posting periods | |
22 | ![]() |
KMONA | Period grouping according to months | |
23 | ![]() |
KMRPP | Period grouping according to planning calendar | |
24 | ![]() |
KTAGE | Period grouping according to days | |
25 | ![]() |
KWOCH | Period grouping according to weeks | |
26 | ![]() |
MAKTX | Material description | |
27 | ![]() |
MATNR | Material Number | |
28 | ![]() |
MATNR | Material Number | |
29 | ![]() |
MAX_OLOAD | Maximum capacity load | |
30 | ![]() |
MDCX_FROM | First period | |
31 | ![]() |
MDCX_TO | Last period | |
32 | ![]() |
MDOLMAT | Overload check for material | |
33 | ![]() |
MDOLPLA | Overload check for planned order | |
34 | ![]() |
MDOLTOT | Total capacity overload check | |
35 | ![]() |
MDPCMAT | Capacity utilization by mateiral (as percentage) | |
36 | ![]() |
MDPCPLA | Capacity utilization by planned order (as percentage) | |
37 | ![]() |
MDPCTOT | Capacity utilization of the planning period (as percentage) | |
38 | ![]() |
MDRQMAT | Capacity requirements caused by material | |
39 | ![]() |
MDRQPLA | Capacity requirements caused by planned order | |
40 | ![]() |
MDRQTOT | Capacity requirements of the planning period | |
41 | ![]() |
MEINS | Base Unit of Measure | |
42 | ![]() |
MRPPP | PPC planning calendar | |
43 | ![]() |
MSEHT | Unit of Measurement Text (Maximum 10 Characters) | |
44 | ![]() |
OLOAD | Maximum capacity utilization for all periods | |
45 | ![]() |
ORDID | Order number | |
46 | ![]() |
ORDTP | Order group abbreviation | |
47 | ![]() |
OVERL | Indicator: capacity overloaded | |
48 | ![]() |
PAART | Order type | |
49 | ![]() |
PDATU | Order finish date | |
50 | ![]() |
PEDTR | Order finish date in the planned order | |
51 | ![]() |
PERIOD_DIS | Period | |
52 | ![]() |
PLNUM | Planned order number | |
53 | ![]() |
PSTTR | Order start date in planned order | |
54 | ![]() |
PWWRK | Production plant in planned order | |
55 | ![]() |
SCHED_TYPE | Scheduling level | |
56 | ![]() |
STEXT | Object Name | |
57 | ![]() |
TABIX_D | Field defined as in SY-TABIX | |
58 | ![]() |
TABIX_D | Field defined as in SY-TABIX | |
59 | ![]() |
TOTQT | Total order quantity | |
60 | ![]() |
TRMER | Scheduling error | |
61 | ![]() |
VERID | Production Version | |
62 | ![]() |
WERKS_D | Plant | |
63 | ![]() |
WERKS_D | Plant | |
64 | ![]() |
XFELD | Checkbox |