Data Element list used by SAP ABAP Table PPH_FIN_OUT_PLAF_2 (DB proxy output structure for PLAF)
SAP ABAP Table
PPH_FIN_OUT_PLAF_2 (DB proxy output structure for PLAF) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | ARSNR | Settlement reservation number | ||
| 2 | ARSPS | Item number of the settlement reservation | ||
| 3 | BAART | P.O./Order type | ||
| 4 | BEDID | ID of the capacity requirements record | ||
| 5 | BERID | MRP Area | ||
| 6 | BERTY | Type of MRP area | ||
| 7 | BESKZ | Procurement Type | ||
| 8 | CUOBJ | Configuration (internal object number) | ||
| 9 | DAT00 | Receipt/Requirements date | ||
| 10 | DAT01 | Delivery/order finish date | ||
| 11 | DAT02 | Start/release date | ||
| 12 | DAT03 | Opening date | ||
| 13 | DBSKZ | Direct procurement indicator | ||
| 14 | DELKZ | MRP element | ||
| 15 | DELNR | MRP element number | ||
| 16 | EBELN | Purchasing Document Number | ||
| 17 | EBELP | Item Number of Purchasing Document | ||
| 18 | EDGNO | Internal number for edge of object dependencies tree | ||
| 19 | EKORG | Purchasing organization | ||
| 20 | EMATN | Material number corresponding to manufacturer part number | ||
| 21 | FIX01 | Indicator: Fixing of Lot Size in Planned Order | ||
| 22 | FIX02 | Indicator: fixing explosion in planned order | ||
| 23 | FRTHW | Production note in the planned order | ||
| 24 | GROER | Scheduling error in rough scheduling | ||
| 25 | GROID | Index for rough scheduling results | ||
| 26 | KAPFX | Indicator: capacity for planned order dispatched | ||
| 27 | KDAUF | Sales Order Number | ||
| 28 | KDPOS | Item number in Sales Order | ||
| 29 | KNTTP | Account assignment category | ||
| 30 | KZBWS | Valuation of Special Stock | ||
| 31 | KZVBR | Consumption posting | ||
| 32 | LGORT_D | Storage location | ||
| 33 | LIFNR | Account Number of Vendor or Creditor | ||
| 34 | MATNR | Material Number | ||
| 35 | MDMNG | MRP: quantity field (stock in transit, receipt qty, ...) | ||
| 36 | MD_LVSCHED | Planned order: leading scheduling level (determines dates) | ||
| 37 | MD_PRSCHED | Planned order: scheduling using production dates | ||
| 38 | MNG02 | Variable scrap quantity | ||
| 39 | MNG_20 | quantity of length 20 | ||
| 40 | MONKZ | Indicator: for assembly order procedures | ||
| 41 | PALTR | Explosion date | ||
| 42 | PBDNR | Requirements Plan Number | ||
| 43 | PEDTI | End Time of Planned Order | ||
| 44 | PLAAB | Material requirements planning segment | ||
| 45 | PLANR | Planning segment number | ||
| 46 | PLUMI | Receipt/issue indicator | ||
| 47 | PLUMS | Conversion indicator for planned order | ||
| 48 | PLWRK | Planning Plant | ||
| 49 | PRNKZ | Ind.: Leading order in collective order is planned ordre | ||
| 50 | PSTMP | Last Change to Planned Order: Time Stamp | ||
| 51 | PSTTI | Start Time of Planned Order | ||
| 52 | PS_POSNR | WBS Element | ||
| 53 | PWWRK | Production plant in planned order | ||
| 54 | QUNUM | Number of quota arrangement | ||
| 55 | QUPOS | Quota arrangement item | ||
| 56 | RATER | Scheduling error in scheduling production rates | ||
| 57 | RATID | Index for the results of scheduling production rates | ||
| 58 | RESLO | Issuing Storage Location for Stock Transport Order | ||
| 59 | REVLV | Revision level | ||
| 60 | RSNUM | Number of reservation/dependent requirements | ||
| 61 | SA_AUFNR | Run schedule header number | ||
| 62 | SA_VERTO | Distribution key for quantity produced | ||
| 63 | SERNR | BOM explosion number | ||
| 64 | SOBES | Special procurement type | ||
| 65 | SOBKZ | Special Stock Indicator | ||
| 66 | SORT1 | Sort indicator 01 | ||
| 67 | SORT2 | Sort indicator 02 | ||
| 68 | STALT | Alternative BOM | ||
| 69 | STLAN | BOM Usage | ||
| 70 | STLST | BOM Statuses | ||
| 71 | TECHS | Parameter Variant/Standard Variant | ||
| 72 | TRMER | Scheduling error | ||
| 73 | VERID | Production Version | ||
| 74 | VERVP | Consumption indicator for planning requirements | ||
| 75 | VPZUO | Allocation Indicator | ||
| 76 | VRFKZ | Availability indicator | ||
| 77 | VRPLA | Indicator: planning without final assembly | ||
| 78 | WAMNG | Issued quantity | ||
| 79 | WEBAZ | Goods receipt processing time in days | ||
| 80 | WERKS_D | Plant |