Data Element list used by SAP ABAP Table AFRU_WIPB_RT2 (Runtime Structure for WIP Batches (But Excluding GR Include))
SAP ABAP Table
AFRU_WIPB_RT2 (Runtime Structure for WIP Batches (But Excluding GR Include)) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | AENAM | Name of Person Who Changed Object | ||
| 2 | ANZMS | Number of employees | ||
| 3 | ARBEITE | Unit for work | ||
| 4 | ARBEITE | Unit for work | ||
| 5 | ARBEITE | Unit for work | ||
| 6 | AUERU_VS | Partial/Final Confirmation | ||
| 7 | AUFNR | Order Number | ||
| 8 | AUSBU | Clear Open Reservations | ||
| 9 | BEMOT | Accounting Indicator | ||
| 10 | BUCHDATUM | Posting date | ||
| 11 | CATSBELNR | Document number | ||
| 12 | CATSPRICE | Price in Transaction Currency | ||
| 13 | CHAR01 | Character Field Length 1 | ||
| 14 | CHAR01 | Character Field Length 1 | ||
| 15 | CHAR01 | Character Field Length 1 | ||
| 16 | CHAR01 | Character Field Length 1 | ||
| 17 | CHAR01 | Character Field Length 1 | ||
| 18 | CHAR01 | Character Field Length 1 | ||
| 19 | CHAR01 | Character Field Length 1 | ||
| 20 | CHARG_D | Batch Number | ||
| 21 | CHARG_D | Batch Number | ||
| 22 | CHARG_D | Batch Number | ||
| 23 | CHARG_D | Batch Number | ||
| 24 | CO_ABARB | Confirmation: Degree of processing | ||
| 25 | CO_AGRND | Reason for Variance | ||
| 26 | CO_APLZL | General counter for order | ||
| 27 | CO_AUFPL | Routing number of operations in the order | ||
| 28 | CO_BELNR | Document Number | ||
| 29 | CO_BELNR | Document Number | ||
| 30 | CO_GRDTX | Text describing the reason for a variance in a confirmation | ||
| 31 | CO_GRSTAT | Indicator: Goods Receipt Status | ||
| 32 | CO_ISMNGEH | Unit of measure for the activity to be confirmed | ||
| 33 | CO_ISMNGEH | Unit of measure for the activity to be confirmed | ||
| 34 | CO_ISMNGEH | Unit of measure for the activity to be confirmed | ||
| 35 | CO_ISMNGEH | Unit of measure for the activity to be confirmed | ||
| 36 | CO_ISMNGEH | Unit of measure for the activity to be confirmed | ||
| 37 | CO_ISMNGEH | Unit of measure for the activity to be confirmed | ||
| 38 | CO_LEIKZ | Indicator: No remaining activity expected | ||
| 39 | CO_LEIKZ | Indicator: No remaining activity expected | ||
| 40 | CO_LEIKZ | Indicator: No remaining activity expected | ||
| 41 | CO_LEIKZ | Indicator: No remaining activity expected | ||
| 42 | CO_LEIKZ | Indicator: No remaining activity expected | ||
| 43 | CO_LEIKZ | Indicator: No remaining activity expected | ||
| 44 | CO_MES_INT_SFCID | SFC Number from the ME System | ||
| 45 | CO_MES_SECOND_CONF_QTY | Rework Quantity Confirmed from SAP ME | ||
| 46 | CO_ORDERPRE | Predecessor Order Number | ||
| 47 | CO_PEDD | Forecast finish date of operation from confirmation | ||
| 48 | CO_PEDZ | Forecast finish time of operation from confirmation | ||
| 49 | CO_PERNR | Personnel number | ||
| 50 | CO_POSNR | Order item number | ||
| 51 | CO_POSPRE | Predecessor Item Number | ||
| 52 | CO_PRZNR | Business Process | ||
| 53 | CO_RMZHL | Confirmation counter | ||
| 54 | CO_RMZHL | Confirmation counter | ||
| 55 | CO_RTEXT | Confirmation text | ||
| 56 | CO_RUECK | Completion confirmation number for the operation | ||
| 57 | CO_RUECK | Completion confirmation number for the operation | ||
| 58 | CO_SATZA | Record type for confirmation | ||
| 59 | CO_SCHAETZ | Forecast value used to update the standard value | ||
| 60 | CO_SCHAETZ | Forecast value used to update the standard value | ||
| 61 | CO_SCHAETZ | Forecast value used to update the standard value | ||
| 62 | CO_SCHAETZ | Forecast value used to update the standard value | ||
| 63 | CO_SCHAETZ | Forecast value used to update the standard value | ||
| 64 | CO_SCHAETZ | Forecast value used to update the standard value | ||
| 65 | CO_STOKZ | Indicator: Document Has Been Reversed | ||
| 66 | CO_STZHL | Confirmation counter of cancelled confirmation | ||
| 67 | CO_WIPBACT | Activity Confirmation WIP Batch | ||
| 68 | CO_WIPBTYPE | Type of Batch in WIP Batch Management | ||
| 69 | CO_WIPB_FLG_GRBATCH | Indictor for Finished Batches | ||
| 70 | CO_WIPB_FLG_OB | Indicator for Original Batches | ||
| 71 | CO_WIPB_FLG_POS | Indicator for WIP Batches with Item Reference | ||
| 72 | CO_WIPB_LVL | WIP Batch Level | ||
| 73 | CO_WIPB_LVL_PRE | Predecessor WIP Batch Level | ||
| 74 | CO_WIPB_ORD | Order Number at Time of Creation of WIP Batch | ||
| 75 | CO_WIPB_ORDER | Order Number of Assignment Target of WIP Batch | ||
| 76 | CO_WIPB_PREB_BATCH | Predecessor Batch | ||
| 77 | CO_WIPB_PREB_EXIST | Indicator: Predecessor Batch Exists | ||
| 78 | CO_WIPB_PREB_MAT | Material of Predecessor Batch | ||
| 79 | CY_COUNT | Counters for cap. rqmts. records (various caps. + indiv.caps | ||
| 80 | CY_SPLIT | Split number | ||
| 81 | DEFSET | Default values set in collective confirmation | ||
| 82 | DELTAARB | Deviation (in %) permitted for work in confirmation | ||
| 83 | DELTAARB | Deviation (in %) permitted for work in confirmation | ||
| 84 | DELTADAU | Permitted deviation (in %) for duration in confirmation | ||
| 85 | DELTADAU | Permitted deviation (in %) for duration in confirmation | ||
| 86 | DZAUSW | Time Recording ID Number | ||
| 87 | DZCODE | Reference number for standard value code | ||
| 88 | DZEIER | Unit for the break time | ||
| 89 | IDAUR | Actual duration for confirmation | ||
| 90 | IDAURE | Unit for actual duration | ||
| 91 | INDUPD | Update indicator (I/U/D) | ||
| 92 | ISERH | Confirmed break time | ||
| 93 | ISMNW | Actual work | ||
| 94 | ISMNW_2 | Actual Work | ||
| 95 | KAPART | Capacity category | ||
| 96 | KAPID | Capacity ID | ||
| 97 | KAPTPROG | Shift definition | ||
| 98 | KOKRS | Controlling Area | ||
| 99 | KOKRS | Controlling Area | ||
| 100 | KOSTL | Cost Center | ||
| 101 | LAEDA | Date of Last Change | ||
| 102 | LDATE | Logical Date | ||
| 103 | LEARR | Activity type for confirmation | ||
| 104 | LEKNW | Indicator: No Remaining Work Expected | ||
| 105 | LFDNR | Sequence Number | ||
| 106 | LICHN | Vendor Batch Number | ||
| 107 | LMNGA | Total Yield Confirmed | ||
| 108 | LOHNART | Wage type | ||
| 109 | LOHNGRP | Wage group | ||
| 110 | LTIME | Logical time | ||
| 111 | MANDT | Client | ||
| 112 | MANUR | Indicator for type of confirmation | ||
| 113 | MATNR | Material Number | ||
| 114 | MATNR | Material Number | ||
| 115 | MBLNR | Number of Material Document | ||
| 116 | MBLNR | Number of Material Document | ||
| 117 | MBLPO | Item in material document | ||
| 118 | MEILR | Indicator: Milestone confirmation carried out | ||
| 119 | MEINH | Unit of Measure for Display | ||
| 120 | MEINS | Base Unit of Measure | ||
| 121 | MGVRG | Operation Quantity | ||
| 122 | MJAHR | Year of material document | ||
| 123 | MJAHR | Year of material document | ||
| 124 | NODAT | Do not update actual date in the operation | ||
| 125 | OBJEKTID | Object ID | ||
| 126 | ODAUE | Unit for remaining duration | ||
| 127 | ODAUR | Remaining duration of activity | ||
| 128 | OFMNE | Unit of measure for remaining work | ||
| 129 | OPRE1 | Unit for remaining quantity of business process | ||
| 130 | OPRZ1 | Remaining quantity for business process | ||
| 131 | ORIGF | Origin Indicator of PDC Message | ||
| 132 | ORIND | Origin Indicator of PDC Message (Application) | ||
| 133 | PACKNO | Package number | ||
| 134 | PDSNR_D | Sequential number for PDC messages | ||
| 135 | PEINH | Price unit | ||
| 136 | PERSA | Personnel Area | ||
| 137 | PLNFOLGE | Sequence | ||
| 138 | QUALF | Suitability | ||
| 139 | REMNW | Remaining work | ||
| 140 | REMNW_2 | Remaining Work | ||
| 141 | RMAN_PRSP_ROLEID | Role ID for Confirmation in Portal | ||
| 142 | RU_ARBPLI | Work Center | ||
| 143 | RU_ERNAM | Name of the person who entered the confirmation | ||
| 144 | RU_ERSDA | Confirmation entry date | ||
| 145 | RU_ERZET | Confirmation entry time | ||
| 146 | RU_EXERD | External date of entry for confirmation | ||
| 147 | RU_EXERZ | External time of entry for confirmation | ||
| 148 | RU_EXNAM | External creator of confirmation | ||
| 149 | RU_EXTID | External Key for Confirmation (for example, from PDC System) | ||
| 150 | RU_GMNGA | Previously confirmed yield in order unit of measure | ||
| 151 | RU_IEBD | Confirmed date for 'processing finish' | ||
| 152 | RU_IEBZ | Confirmed time for 'processing finish' | ||
| 153 | RU_IEDD | Confirmed date for execution finish | ||
| 154 | RU_IEDZ | Confirmed time for 'Execution finish' | ||
| 155 | RU_IERD | Confirmed date for 'Setup finish' | ||
| 156 | RU_IERZ | Confirmed time for 'Setup finish' | ||
| 157 | RU_IPRZE | Unit of measurement for conf. quantity for business process | ||
| 158 | RU_IPRZK | No remaining quantity expected for business process | ||
| 159 | RU_IPRZS | Current quantity to be confirmed for the business process | ||
| 160 | RU_ISAD | Confirmed date for 'teardown start' | ||
| 161 | RU_ISAZ | Confirmed time for 'teardown start' | ||
| 162 | RU_ISBD | Confirmed date for 'Processing start' | ||
| 163 | RU_ISBZ | Confirmed time for 'Processing start' | ||
| 164 | RU_ISDD | Confirmed date for start of execution | ||
| 165 | RU_ISDZ | Confirmed time for 'Execution start' | ||
| 166 | RU_ISMNG | Activity currently to be confirmed | ||
| 167 | RU_ISMNG | Activity currently to be confirmed | ||
| 168 | RU_ISMNG | Activity currently to be confirmed | ||
| 169 | RU_ISMNG | Activity currently to be confirmed | ||
| 170 | RU_ISMNG | Activity currently to be confirmed | ||
| 171 | RU_ISMNG | Activity currently to be confirmed | ||
| 172 | RU_LMNGA | Yield currently to be confirmed | ||
| 173 | RU_NAME | Name of employee | ||
| 174 | RU_PROGVGE | Unit of measurement for the forecast standard value | ||
| 175 | RU_PROGVGE | Unit of measurement for the forecast standard value | ||
| 176 | RU_PROGVGE | Unit of measurement for the forecast standard value | ||
| 177 | RU_PROGVGE | Unit of measurement for the forecast standard value | ||
| 178 | RU_PROGVGE | Unit of measurement for the forecast standard value | ||
| 179 | RU_PROGVGE | Unit of measurement for the forecast standard value | ||
| 180 | RU_RMNGA | Current rework quantity to be confirmed | ||
| 181 | RU_TARGET_ACTIVITY | Indicator: Determine target activity | ||
| 182 | RU_TARGET_ACTIVITY | Indicator: Determine target activity | ||
| 183 | RU_TARGET_ACTIVITY | Indicator: Determine target activity | ||
| 184 | RU_TARGET_ACTIVITY | Indicator: Determine target activity | ||
| 185 | RU_TARGET_ACTIVITY | Indicator: Determine target activity | ||
| 186 | RU_TARGET_ACTIVITY | Indicator: Determine target activity | ||
| 187 | RU_TARGET_BUS_PROC | Indicator: Determine target qty for business transaction | ||
| 188 | RU_VORME | Confirmation unit of measure | ||
| 189 | RU_XMNGA | Scrap currently to be confirmed | ||
| 190 | SCHGRUP | Grouping for Shift Definitions and Shift Sequences | ||
| 191 | SKOSTL | Sender Cost Center | ||
| 192 | SPRAS | Language Key | ||
| 193 | STNDR | Indicator: Standard confirmation | ||
| 194 | SUMKNTNR | Node number of the superior operation | ||
| 195 | TABIX_D | Field defined as in SY-TABIX | ||
| 196 | TABIX_D | Field defined as in SY-TABIX | ||
| 197 | TWAER | Transaction Currency | ||
| 198 | UCCHA | Original Batch | ||
| 199 | UCCHA | Original Batch | ||
| 200 | UCMAT | Material from Original Batch | ||
| 201 | UCMAT | Material from Original Batch | ||
| 202 | UVORN | Suboperation | ||
| 203 | VORNR | Operation/Activity Number | ||
| 204 | VORNR | Operation/Activity Number | ||
| 205 | VSDAT | Indicator: Actual data already proposed | ||
| 206 | VSWBN | Indicator: Goods movements are already determined | ||
| 207 | WEBLNR | Number of a document from a goods movement with errors | ||
| 208 | WERKS_D | Plant |