Data Element list used by SAP ABAP Table BADI_MT61D_EXT (Material Master MRP (Extract for BAdI))
SAP ABAP Table
BADI_MT61D_EXT (Material Master MRP (Extract for BAdI)) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | ALTSL | Method for Selecting Alternative Bills of Material | ||
| 2 | AUFTL | Splitting Indicator | ||
| 3 | AUSDT | Effective-out date | ||
| 4 | AUSME | Unit of issue | ||
| 5 | AUSSS | Assembly scrap in percent | ||
| 6 | BASMG | Base quantity | ||
| 7 | BEARZ | Processing time | ||
| 8 | BESKZ | Procurement Type | ||
| 9 | BSTFE | Fixed lot size | ||
| 10 | BSTMA | Maximum lot size | ||
| 11 | BSTME | Order unit | ||
| 12 | BSTMI | Minimum lot size | ||
| 13 | BSTRF | Rounding value for purchase order quantity | ||
| 14 | DISGR | MRP Group | ||
| 15 | DISLS | Lot size (materials planning) | ||
| 16 | DISMM | MRP Type | ||
| 17 | DISPO | MRP controller | ||
| 18 | DZEIT | In-house production time | ||
| 19 | EISBE | Safety stock | ||
| 20 | EISLO | Minimum Safety Stock | ||
| 21 | EKGRP | Purchasing group | ||
| 22 | EXPME | Unit of measure for commodity code (foreign trade) | ||
| 23 | FABKZ | Indicator: Item Relevant to JIT Delivery Schedules | ||
| 24 | FEVOR | Production Supervisor | ||
| 25 | FHORI | Scheduling Margin Key for Floats | ||
| 26 | FRTME | Production unit | ||
| 27 | FXHOR | Planning time fence | ||
| 28 | KZAUS | Discontinuation indicator | ||
| 29 | KZBED | Indicator for Requirements Grouping | ||
| 30 | KZDIE | Indicator: MRP controller is buyer (deactivated) | ||
| 31 | LAGPR | Storage costs indicator | ||
| 32 | LFRHY | Planning cycle | ||
| 33 | LGFSB | Default storage location for external procurement | ||
| 34 | LGPRO | Issue storage location | ||
| 35 | LOSFX | Ordering costs | ||
| 36 | MAABC | ABC indicator | ||
| 37 | MABST | Maximum stock level | ||
| 38 | MDACH | Action control: planned order processing | ||
| 39 | MFRNR | Manufacturer number | ||
| 40 | MFRPN | Manufacturer Part Number | ||
| 41 | MINBE | Reorder point | ||
| 42 | MISKZ | Mixed MRP indicator | ||
| 43 | MMSTA | Plant-Specific Material Status | ||
| 44 | MMSTD | Date from which the plant-specific material status is valid | ||
| 45 | MPROF | Mfr part profile | ||
| 46 | MRPPP | PPC planning calendar | ||
| 47 | MSTAE | Cross-Plant Material Status | ||
| 48 | MSTDE | Date from which the cross-plant material status is valid | ||
| 49 | MTVFP | Checking Group for Availability Check | ||
| 50 | NFMAT | Follow-up material | ||
| 51 | PERIV | Fiscal Year Variant | ||
| 52 | PERKZ | Period indicator | ||
| 53 | PFREI | Indicator: automatic fixing of planned orders | ||
| 54 | PLIFZ | Planned delivery time in days | ||
| 55 | PRBME | Base unit of measure for product group | ||
| 56 | PROKZ | Forecast indicator | ||
| 57 | QMATV | Inspection Setup Exists for Material/Plant | ||
| 58 | RDPRF | Rounding Profile | ||
| 59 | RESVP | Period of adjustment for planned independent requirements | ||
| 60 | RUEZT | Setup and teardown time | ||
| 61 | RWPRO | Range of coverage profile | ||
| 62 | SA_SAUFT | Ind.: Repetitive mfg allowed | ||
| 63 | SBDKZ | Dependent requirements ind. for individual and coll. reqmts | ||
| 64 | SCHGT | Indicator: bulk material | ||
| 65 | SERAIL | Serial Number Profile | ||
| 66 | SFEPR | Repetitive manufacturing profile | ||
| 67 | SHFLG | Safety time indicator (with or without safety time) | ||
| 68 | SHPRO | Period profile for safety time | ||
| 69 | SHZET | Safety time (in workdays) | ||
| 70 | SOBSL | Special procurement type | ||
| 71 | STRGR | Planning strategy group | ||
| 72 | TAKZT | Takt time | ||
| 73 | TRAME | Stock in transit | ||
| 74 | TRANZ | Interoperation time | ||
| 75 | UMLME | Stock in transfer (plant to plant) | ||
| 76 | UMREFF | Conversion factor: quantities | ||
| 77 | USEQU | Quota arrangement usage | ||
| 78 | VINT1 | Consumption period: backward | ||
| 79 | VINT2 | Consumption period: forward | ||
| 80 | VPMAT | Planning material | ||
| 81 | VPWRK | Planning plant | ||
| 82 | VRMOD | Consumption mode | ||
| 83 | VSPVB | Proposed Supply Area in Material Master Record | ||
| 84 | WEBAZ | Goods receipt processing time in days | ||
| 85 | WZEIT | Total replenishment lead time (in workdays) |