SAP ABAP Table MDFE (Line item for run schedule plan value display)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       MD (Package) Application development R/3 requirements planning
Basic Data
Table Category INTTAB    Structure 
Structure MDFE   Table Relationship Diagram
Short Description Line item for run schedule plan value display    
Delivery and Maintenance
Pool/cluster      
Delivery Class      
Data Browser/Table View Maintenance     Display/Maintenance Allowed with Restrictions 
Components
     
Field Key Data Element Domain Data
Type
Length Decimal
Places
Short Description Check
table
1 ZEILE PT_ZEILE INT4 INT4 10   0   Row number in planning table  
2 SPALT DZLSP1 ZLSP1 NUMC 4   0   Line  
3 MATNR MATNR MATNR CHAR 18   0   Material Number MARA
4 PLAAB PLAAB PLAAB NUMC 2   0   Material requirements planning segment  
5 PLANR PLANR PLANR CHAR 20   0   Planning segment number  
6 DAT00 DAT00 DATUM DATS 8   0   Receipt/Requirements date  
7 DELKZ DELKZ DELKZ CHAR 2   0   MRP element  
8 FREKZ FREKZ FREKZ CHAR 1   0   Indicator in MDFEX: whether prod. order is released  
9 INDEX SA_INDEX INT4 INT4 10   0   Original index  
10 AEFLG SA_AEFLG SA_AEFLG CHAR 1   0   Change flag  
11 MNG01 SA_MNG01 MENGV13 QUAN 13   3   Quantity received or quantity required  
12 MNG02 MNG02 MENG13 QUAN 13   3   Variable scrap quantity  
13 MNG03 SA_MNG03 MENG13 QUAN 13   3   Quantity of goods received  
14 MNG04 SA_MNG04 MENG13 QUAN 13   3   Scrap quantity  
15 MNG05 SA_MNG05 MENG13 QUAN 13   3   Goods receipt quantity to date  
16 MNG06 SA_MNG06 MENG13 QUAN 13   3   Actual scrap quantity to date  
17 DAT01 DAT01 DATUM DATS 8   0   Delivery/order finish date  
18 DAT02 DAT02 DATUM DATS 8   0   Start/release date  
19 DAT03 DAT03 DATUM DATS 8   0   Opening date  
20 FIX01 FIX01 XFELD CHAR 1   0   Indicator: Fixing of Lot Size in Planned Order  
21 FIX02 FIX02 XFELD CHAR 1   0   Indicator: fixing explosion in planned order  
22 AUFNR SA_AUFNR SA_AUFNR CHAR 12   0   Run schedule header number *
23 GMEIN MEINS MEINS UNIT 3   0   Base Unit of Measure *
24 PLWRK PLWRK WERKS CHAR 4   0   Planning Plant T001W
25 PWWRK PWWRK WERKS CHAR 4   0   Production plant in planned order T001W
26 LGORT LGORT_D LGORT CHAR 4   0   Storage location T001L
27 VERID VERID VERID CHAR 4   0   Production Version MKAL
28 PLNUM PLNUM PLNUM CHAR 10   0   Planned order number *
29 LINID SP_OPID SP_OPID NUMC 15   0   ID for a schedule record  
30 MDV01 MDV01 MDVXX CHAR 8   0   Production line *
31 MDV02 MDV02 MDVXX CHAR 8   0   Planning identification 2 *
32 LINHI LD_LINE ARBPL CHAR 8   0   Line hierarchy  
33 VERTL SA_VERTL SA_VERTL CHAR 4   0   MRP Distribution Key *
34 SELEC SELEKT SEL CHAR 1   0   Selection indicator  
35 FAUFN AUFNR AUFNR CHAR 12   0   Order Number AUFK
36 POSNR CO_POSNR CO_POSNR NUMC 4   0   Order item number  
37 ELIKZ ELIKZ_SA XFELD CHAR 1   0   Final delivery indicator for repetitive manufacturing  
38 RSNUM RSNUM RSNUM NUMC 10   0   Number of reservation/dependent requirements *
39 ERUKZ SA_ERUKZ XFELD CHAR 1   0   Final backflush indicator  
40 EENKZ SA_EENKZ XFELD CHAR 1   0   End withdrawal indicator  
41 NFRKZ SA_NFRKZ XFELD CHAR 1   0   Indicator: production order not released  
42 AFGKA AFGKA SA_AEFLG CHAR 1   0   Change flag for capacity planning  
43 KPART KAPART KAPART CHAR 3   0   Capacity category *
44 SCHIV SCHICHTNR NUM01 NUMC 1   0   Shift number of the available capacity  
45 ZEITV UZEIT UZEIT TIMS 6   0   Time  
46 ZEITB UZEIT UZEIT TIMS 6   0   Time  
47 AUFN1 SA_AUFNR SA_AUFNR CHAR 12   0   Run schedule header number *
48 KAPFX KAPFX XFELD CHAR 1   0   Indicator: capacity for planned order dispatched  
49 ETART ETART ETLAR CHAR 1   0   Planned order shift type  
50 SHTNR SHTNR NUMC01 NUMC 1   0   Shift number  
51 ETLNR ETLNR NUMC04 NUMC 4   0   Planned order shift quantity number  
52 DISPO PLDSP DISPO CHAR 3   0   MRP controller *
53 DAT04 SA_DAT04 DATUM DATS 8   0   Start date for production  
54 DAT05 SA_DAT05 DATUM DATS 8   0   Finish date for production  
55 DTBDV FSSBD DATUM DATS 8   0   Earliest scheduled start: Processing (date)  
56 DTBZV FSSBZ ATIME TIMS 6   0   Earliest scheduled start: Processing (time)  
57 DTBDB FSSAD DATUM DATS 8   0   Earliest scheduled start: Teardown (date)  
58 DTBZB FSSAZ ATIME TIMS 6   0   Earliest scheduled start: Teardown (time)  
59 ANVER XFLAG XFLAG CHAR 1   0   New Input Values  
60 PLUMI PLUMI CHAR1 CHAR 1   0   Receipt/issue indicator  
61 ZLART DELKZ DELKZ CHAR 2   0   MRP element  
62 VRFKZ VRFKZ VRFKZ CHAR 1   0   Availability indicator  
63 KDAUF KDAUF VBELN CHAR 10   0   Sales Order Number *
64 KDPOS KDPOS NUM06 NUMC 6   0   Item number in Sales Order  
65 DELPS DELPS DELPS NUMC 6   0   MRP element item  
66 DELET DELET DELET NUMC 4   0   Scheduling number planning element  
67 PSPEL PS_POSNR PS_POSNR NUMC 8   0   WBS Element *
68 WEBAZ WEBAZ DEC3 DEC 3   0   Goods receipt processing time in days  
69 BAART BAART BAART CHAR 4   0   P.O./Order type  
70 TRMKZ TRMFL XFELD CHAR 1   0   Scheduling indicator  
Foreign Keys
Source Table Source Column Foreign Table Foreign Column Dependency Factor Cardinality left Cardinality right
1 MDFE FAUFN AUFK AUFNR    
2 MDFE LGORT T001L LGORT    
3 MDFE MATNR MARA MATNR    
4 MDFE PLWRK T001W WERKS    
5 MDFE PWWRK T001W WERKS    
6 MDFE VERID MKAL VERID    
History
Last changed by/on SAP  20140121 
SAP Release Created in