SAP ABAP Data Element SA_DAT04 (Start date for production)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ PP-REM (Application Component) Repetitive Manufacturing
⤷ MD04 (Package) Repetitive Manufacturing
⤷ PP-REM (Application Component) Repetitive Manufacturing
⤷ MD04 (Package) Repetitive Manufacturing
Basic Data
Data Element | SA_DAT04 |
Short Description | Start date for production |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DATUM | |
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Prod.start |
Medium | 15 | Prod.start date |
Long | 20 | Product.start date |
Heading | 10 | Prod.start |
Documentation
Definition
Date on which the planning operation should start. The planning operation is the operation in the routing where the scheduling work center is used.
If a setup time exists before processing, the start date corresponds to the time when the setup starts.
There are two options for calculating the date:
- Using lead time scheduling
- By entering the date manually in the planned order in the planning table
Dependencies
If you change this date, the system carries out forward scheduling starting from the new date.
If you change both the start and the finish date, the system carries out backward scheduling starting from the new finish date.