Data Element list used by SAP ABAP Table SCY_AFKO (Subset structure of CAUFVD)
SAP ABAP Table SCY_AFKO (Subset structure of CAUFVD) is using
# Object Type Object Name Object Description Note
     
1 Data Element  ABCKZ ABC Indicator for Technical Object
2 Data Element  ABGR_SCHL Results Analysis Key
3 Data Element  ABNUM Maintenance Plan Call Number
4 Data Element  ADDAT PM Order: Reference Date
5 Data Element  ADUHR Time of Reference Date
6 Data Element  AEKNZ Change indicator
7 Data Element  AENNR Change Number
8 Data Element  AENNR Change Number
9 Data Element  ANING Name of Person Reponsible for System
10 Data Element  ANLBD Date until which the system is available
11 Data Element  ANLBZ Time until which the system is available
12 Data Element  ANLN1 Main Asset Number
13 Data Element  ANLN2 Asset Subnumber
14 Data Element  ANLVD Date from which the system is available
15 Data Element  ANLVZ Time from Which System is Available
16 Data Element  ANLZU Syst.Condition
17 Data Element  AP_KTEXT Short text for the work center
18 Data Element  ARTPR Priority Type
19 Data Element  AUFABKRS Processing group
20 Data Element  AUFAEDAT Change date for Order Master
21 Data Element  AUFAENAM Last changed by
22 Data Element  AUFART Order Type
23 Data Element  AUFERFDAT Created on
24 Data Element  AUFERFNAM Entered by
25 Data Element  AUFKALSM Costing Sheet
26 Data Element  AUFLOEKZ Deletion flag
27 Data Element  AUFLTEXT Long Text Exists
28 Data Element  AUFNR Order Number
29 Data Element  AUFNR Order Number
30 Data Element  AUFREFNR Reference order number
31 Data Element  AUFSTKZ Identifier for statistical order
32 Data Element  AUFTEXT Description
33 Data Element  AUFTYP Order category
34 Data Element  AUFWAERS Order Currency
35 Data Element  AUFZSCHL Overhead key
36 Data Element  AVOUEB Indicator: Display operation overview
37 Data Element  AWSLS Variance Key
38 Data Element  BASMN Base quantity
39 Data Element  BASMN Base quantity
40 Data Element  BASMN Base quantity
41 Data Element  BAUTL Assembly
42 Data Element  BEBER Organizational Area
43 Data Element  BEDID ID of the capacity requirements record
44 Data Element  BEDID ID of the capacity requirements record
45 Data Element  BEDID ID of the capacity requirements record
46 Data Element  BUKRS Company Code
47 Data Element  BUKRS Company Code
48 Data Element  CCKEY Cost collector key
49 Data Element  CCOBJID Object ID
50 Data Element  CIM_COUNT Internal counter
51 Data Element  CIM_COUNT Internal counter
52 Data Element  CIM_COUNT Internal counter
53 Data Element  CK_LOSGR Costing lot size
54 Data Element  CN_AUTH Ind.: Authorization exists
55 Data Element  CN_AUTH Ind.: Authorization exists
56 Data Element  CN_AUTH Ind.: Authorization exists
57 Data Element  CN_AUTH Ind.: Authorization exists
58 Data Element  CN_AUTH Ind.: Authorization exists
59 Data Element  CN_AUTH Ind.: Authorization exists
60 Data Element  CN_AUTH Ind.: Authorization exists
61 Data Element  CO_APRIO Order priority
62 Data Element  CO_APROZ Scrap percentage
63 Data Element  CO_APROZ Scrap percentage
64 Data Element  CO_ASTEX User status active
65 Data Element  CO_ASTTX Field displaying user status
66 Data Element  CO_AUCOST Indicator: Cost automatically
67 Data Element  CO_AUFLD Date of BOM Explosion/Routing Transfer
68 Data Element  CO_AUFPL Routing number of operations in the order
69 Data Element  CO_AUTERM Indicator: Schedule automatically
70 Data Element  CO_DISPO MRP controller for the order
71 Data Element  CO_FREIKZ Indicator: Release order immediately
72 Data Element  CO_FTRMI Actual release date
73 Data Element  CO_FTRMP Planned release date
74 Data Element  CO_FTRMS Scheduled release date
75 Data Element  CO_FTRPS Scheduled release date (forecast)
76 Data Element  CO_GETRI Confirmed Order Finish Date
77 Data Element  CO_GIAMG Expected variance from planned qty to be delivered to stock
78 Data Element  CO_GLTPP Finish date (forecast)
79 Data Element  CO_GLTPS Scheduled forecast finish
80 Data Element  CO_GLTRI Actual finish date
81 Data Element  CO_GLTRP Basic finish date
82 Data Element  CO_GLTRS Scheduled finish
83 Data Element  CO_GMEIN Common unit of measure for all order items
84 Data Element  CO_GSTPP Forecast start date
85 Data Element  CO_GSTPS Scheduled forecast start
86 Data Element  CO_GSTRI Actual start date
87 Data Element  CO_GSTRP Basic start date
88 Data Element  CO_GSTRS Scheduled start
89 Data Element  CO_GWEMG Delivered quantity
90 Data Element  CO_IGMNG Yield confirmed from order confirmation
91 Data Element  CO_KONTI Account assignment
92 Data Element  CO_KORRK Order conversion with the possibility of making corrections
93 Data Element  CO_LTEXT Long text exists
94 Data Element  CO_MATNR Material Number for Order
95 Data Element  CO_MATXT Material description
96 Data Element  CO_MIMEZ Expected yield variance
97 Data Element  CO_PLAFKZ Indicator: Convert planned order with RSNUM
98 Data Element  CO_PLAUF Date for routing transfer
99 Data Element  CO_POSNR Order item number
100 Data Element  CO_RUECK Completion confirmation number for the operation
101 Data Element  CO_SDATB To selection date
102 Data Element  CO_SDATV From selection date
103 Data Element  CO_STTXT System Status
104 Data Element  CO_UMSKZ Indicator: Collective conversion of planned orders
105 Data Element  CO_UPTER Indicator: Change to Scheduled Dates
106 Data Element  CREA_APL Application code, where the order/network was created
107 Data Element  CR_OBJID Object ID of the resource
108 Data Element  CR_OBJID Object ID of the resource
109 Data Element  CR_OBJTY Object types of the CIM resource
110 Data Element  CR_OBJTY Object types of the CIM resource
111 Data Element  CR_OBJTY Object types of the CIM resource
112 Data Element  CUOBJ Configuration (internal object number)
113 Data Element  DATAN Date of Technical Inspection
114 Data Element  DATUV Valid-From Date
115 Data Element  DATUV Valid-From Date
116 Data Element  DAUFN Standing order number
117 Data Element  DZKRIZ Counter for additional criteria
118 Data Element  EQFNR Sort Field
119 Data Element  EQUNR Equipment Number
120 Data Element  FEVOR Production Supervisor
121 Data Element  FHORI Scheduling Margin Key for Floats
122 Data Element  FLG_AOB Indicator: relationships
123 Data Element  FLG_ARBEI Indicator: Default value work is relevant
124 Data Element  FLG_CALC Indicator: Order (network etc.) still to be calculated
125 Data Element  FLG_DIRECT Indicator: Direct function call
126 Data Element  FLG_PRINT Indicator: Order still to be printed (internal field)
127 Data Element  FLG_TERDIA Indicator: Refill dialog table for scheduling
128 Data Element  FLG_TERM Indicator: Scheduling must take data changes into account
129 Data Element  FLG_TRME Indicator: Scheduling is carried out at least once
130 Data Element  FLG_TRMV Indicator: Operation changes relevant to scheduling
131 Data Element  FREIZ Release period (in days)
132 Data Element  FSAVZ Earliest scheduled start: Execution (time)
133 Data Element  FSEDZ Earliest scheduled finish: Execution (time)
134 Data Element  GAMNG Total order quantity
135 Data Element  GASMG Total scrap quantity in the order
136 Data Element  GAUZT Planned downtime in hours
137 Data Element  GEWRK Main work center for maintenance tasks
138 Data Element  GSBER Business Area
139 Data Element  GSBER Business Area
140 Data Element  HISDA PM request: History date
141 Data Element  HISTU Level (in Multi-Level BOM Explosions)
142 Data Element  ILA Maintenance activity type
143 Data Element  ILOAI ILOA Individual
144 Data Element  ILOAN Location and account assignment for technical object
145 Data Element  INGRP Planner Group for Customer Service and Plant Maintenance
146 Data Element  INHER Data origin indicator
147 Data Element  INHER Data origin indicator
148 Data Element  INHER Data origin indicator
149 Data Element  INHER Data origin indicator
150 Data Element  INHER Data origin indicator
151 Data Element  INHER Data origin indicator
152 Data Element  INHER Data origin indicator
153 Data Element  INHER Data origin indicator
154 Data Element  INHER Data origin indicator
155 Data Element  INHER Data origin indicator
156 Data Element  INHER Data origin indicator
157 Data Element  INHER Data origin indicator
158 Data Element  INHER Data origin indicator
159 Data Element  INHER Data origin indicator
160 Data Element  INHER Data origin indicator
161 Data Element  INHER Data origin indicator
162 Data Element  INHER Data origin indicator
163 Data Element  INNAM Name of the Maintenance Planner Group
164 Data Element  INSPK Name of Person Responsible for Technical Inspection
165 Data Element  IWERK Maintenance Planning Plant
166 Data Element  JV_NAME Joint venture
167 Data Element  JV_RECIND Recovery Indicator
168 Data Element  J_OBJNR Object number
169 Data Element  J_STSMA Status Profile
170 Data Element  KALKVARIST Costing variant for actual costs
171 Data Element  KALKVARPLN Costing variant for planned costs
172 Data Element  KAPPL Application
173 Data Element  KOKRS Controlling Area
174 Data Element  KOKRS Controlling Area
175 Data Element  KOSTL Cost Center
176 Data Element  KUNUM Customer Number
177 Data Element  KVEWE Usage of the Condition Table
178 Data Element  LAUFN Order number
179 Data Element  LGWID Object ID of the Work Center
180 Data Element  LOSBS To Lot Size
181 Data Element  LOSDIV Lot size divisor
182 Data Element  LOSGRBIS To lot size
183 Data Element  LOSGRVON From Lot Size
184 Data Element  LOSVN From Lot Size
185 Data Element  MANDT Client
186 Data Element  MATNR Material Number
187 Data Element  MATNR Material Number
188 Data Element  MAUEH Unit for Breakdown Duration
189 Data Element  MEINS Base Unit of Measure
190 Data Element  MEINS Base Unit of Measure
191 Data Element  NWART Type of network
192 Data Element  OBJKNR Object list number
193 Data Element  PLART_TX Description of the basis for scheduling
194 Data Element  PLGKZ Identifier for planning with line items
195 Data Element  PLNAL Group Counter
196 Data Element  PLNAW Application of the task list
197 Data Element  PLNME Task list unit of measure
198 Data Element  PLNNR Key for Task List Group
199 Data Element  PLNNR_REF Number of standard networks to be copied
200 Data Element  PLNTY Task List Type
201 Data Element  PLN_VERWE Task list usage
202 Data Element  PM_ABR_FLG Flag: Maintenance plan call
203 Data Element  PM_OBJTY Object Type of CIM Resources for Work Center
204 Data Element  PM_PHASE Maintenance Processing Phase
205 Data Element  PM_PRT_FLG Indicator: Order Printing Requested
206 Data Element  PM_WO_FLG Indicator: Order Creation from PM Notification
207 Data Element  PPSID Object ID of PP work center
208 Data Element  PRCTR Profit Center
209 Data Element  PRIOK Priority
210 Data Element  PROFIDNZPL Network profile
211 Data Element  PRTRV Indicator: Project date definition
212 Data Element  PS_PLART Basis for scheduling
213 Data Element  PS_PSP_ELE Work breakdown structure element (WBS element)
214 Data Element  PS_PSP_PNR Work Breakdown Structure Element (WBS Element)
215 Data Element  PS_PSP_PNR Work Breakdown Structure Element (WBS Element)
216 Data Element  PS_PSP_PRO Project definition
217 Data Element  PS_TERMBAS Set of dates for network
218 Data Element  QMNUM Message Number
219 Data Element  QPLOS Inspection Lot Number
220 Data Element  RAUMNR Room
221 Data Element  REDKZ Reduction indicator for scheduling
222 Data Element  REDKZP Reduction indicator for scheduling (forecast)
223 Data Element  REDKZ_TX Description of reduction indicator
224 Data Element  REVLV Revision level
225 Data Element  REVNI Revision of Plant Maintenance and Customer Service
226 Data Element  RGEKZ Indicator: Backflush
227 Data Element  RSNUM Number of reservation/dependent requirements
228 Data Element  SICHZ Float after production (in days)
229 Data Element  STALT Alternative BOM
230 Data Element  STLAN BOM Usage
231 Data Element  STLST BOM Statuses
232 Data Element  STLTY BOM Category
233 Data Element  STNUM Bill of Material
234 Data Element  STORT Asset location
235 Data Element  SWERK Maintenance Plant
236 Data Element  TABIX_D Field defined as in SY-TABIX
237 Data Element  TERMKZ Scheduling type
238 Data Element  TERMKZP Scheduling type (forecast)
239 Data Element  TERMKZ_TXT Description of scheduling type
240 Data Element  TEXT40 Text, 40 Characters Long
241 Data Element  TMBAS_TX Description of the planning type
242 Data Element  TPLNR Functional Location
243 Data Element  TYPKZ Type of object causing the load (order category)
244 Data Element  VAGRP Responsible planner group/department
245 Data Element  VAGRP Responsible planner group/department
246 Data Element  VANTW Person/Group responsible for the network
247 Data Element  VORGZ Float before production (in days)
248 Data Element  WAPOS Maintenance item
249 Data Element  WARPL Maintenance Plan
250 Data Element  WEGXX Path (for Multi-Level BOM Explosions)
251 Data Element  WEGXX Path (for Multi-Level BOM Explosions)
252 Data Element  WERGW Plant associated with main work center
253 Data Element  WERKS_D Plant