SAP ABAP Data Element CO_GLTRS (Scheduled finish)
Hierarchy
SAP_ABA (Software Component) Cross-Application Component
   CA-GTF-PS (Application Component) Cross-Application Objects in Project System
     BC (Package) Cross-Application Objects PP/PS
Basic Data
Data Element CO_GLTRS
Short Description Scheduled finish  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type DATUM    
Data Type DATS   Date field (YYYYMMDD) stored as char(8) 
Length 8    
Decimal Places 0    
Output Length 10    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name PRODUCTION_FINISH_DATE   
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Sched.Fin. 
Medium 15 Sched. finish 
Long 20 Scheduled finish 
Heading 55 Scheduled finish 
Documentation

Definition

Scheduled finish date

Supplementary Documentation - CO_GLTRS 0001

Finish date for the execution of the order.

Procedure

You can either

  • let the system determine this date using lead time scheduling, or
  • enter the date as a fixed date on the header screen of the order.

Supplementary Documentation - CO_GLTRS 0002

Definition

The finish date for production is the planned finish date of an order without the float after production.

Use

The production dates are calculated within lead time scheduling.

Procedure

Examples

Dependencies

Supplementary Documentation - CO_GLTRS 0050

Procedure

Enter here the scheduled finish of orders for which manufacturing instructions are to be selected.

The way in which the value entered is interpreted (for example, as a single value or as an interval limit) depends on

  • whether you maintain the field only in the left column or also in the right
  • which selection option you choose for the value

Supplementary Documentation - CO_GLTRS 0051

Procedure

Enter the scheduled finish of the orders for which manufacturing instructions are to be selected.

Use the selection options to determine how the value entered is to be interpreted (for example, as a single value or as an interval limit).

Supplementary Documentation - CO_GLTRS 0500

Finish date for the execution of the production order.

Procedure

You can either

  • let the system determine this date via lead time scheduling, or
  • enter the date as a fixed date on the header screen of the production order.

Supplementary Documentation - CO_GLTRS 2120

Use

The scheduled finish date is calculated by scheduling the network forwards.

History
Last changed by/on SAP  19990629 