Hierarchy
⤷ CA-GTF-PS (Application Component) Cross-Application Objects in Project System
⤷ BC (Package) Cross-Application Objects PP/PS
Basic Data
Data Element | CO_GLTRS |
Short Description | Scheduled finish |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DATUM | |
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | PRODUCTION_FINISH_DATE | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Sched.Fin. |
Medium | 15 | Sched. finish |
Long | 20 | Scheduled finish |
Heading | 55 | Scheduled finish |
Documentation
Definition
Scheduled finish date
Supplementary Documentation - CO_GLTRS 0001
Finish date for the execution of the order.
Procedure
You can either
- let the system determine this date using lead time scheduling, or
- enter the date as a fixed date on the header screen of the order.
Supplementary Documentation - CO_GLTRS 0002
Definition
The finish date for production is the planned finish date of an order without the float after production.
Use
The production dates are calculated within lead time scheduling.
Procedure
Examples
Dependencies
Supplementary Documentation - CO_GLTRS 0050
Procedure
Enter here the scheduled finish of orders for which manufacturing instructions are to be selected.
The way in which the value entered is interpreted (for example, as a single value or as an interval limit) depends on
- whether you maintain the field only in the left column or also in the right
- which selection option you choose for the value
Supplementary Documentation - CO_GLTRS 0051
Procedure
Enter the scheduled finish of the orders for which manufacturing instructions are to be selected.
Use the selection options to determine how the value entered is to be interpreted (for example, as a single value or as an interval limit).
Supplementary Documentation - CO_GLTRS 0500
Finish date for the execution of the production order.
Procedure
You can either
- let the system determine this date via lead time scheduling, or
- enter the date as a fixed date on the header screen of the production order.
Supplementary Documentation - CO_GLTRS 2120
Use
The scheduled finish date is calculated by scheduling the network forwards.
History
Last changed by/on | SAP | 19990629 |
SAP Release Created in |