SAP ABAP Data Element PS_PSP_ELE (Work breakdown structure element (WBS element))
Hierarchy
☛
SAP_ABA (Software Component) Cross-Application Component
⤷ CA-GTF-TS (Application Component) Technical Application Support
⤷ BK (Package) CO Cross-application Objects
⤷ CA-GTF-TS (Application Component) Technical Application Support
⤷ BK (Package) CO Cross-application Objects
Basic Data
Data Element | PS_PSP_ELE |
Short Description | Work breakdown structure element (WBS element) |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | PS_POSNR | |
Data Type | NUMC | Character string with only digits |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 24 | |
Value Table | PRPS |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | WBS_ELEM | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | WBS elem. |
Medium | 15 | WBS element |
Long | 20 | WBS element |
Heading | 24 | WBS element |
Documentation
Definition
Key identifying a WBS element.
Supplementary Documentation - PS_PSP_ELE0140
Dependencies
This field is only of relevance if the production order is assigned to the account of the project.
Supplementary Documentation - PS_PSP_ELE0600
Use
WBS element to which the order is assigned.
Dependencies
You cannot budget for an order when you assign it to a WBS element, as the order will be budgeted for as part of project budgeting.
Supplementary Documentation - PS_PSP_ELE2120
Use
You can assign a WBS element to a network:
- in the network header
- in the activities
Dependencies
If you maintain a WBS element in the header when creating a network, you must consider that:
- when the network has its account assignment in the header the WBS element will be identified as an account assignment element.
- when the network has its account assignment in the header the WBS element will be copied into every activity in the network.
- The system will copy the corresponding project definitions.
- You can copy the basic dates from the project definition as defaults for the basic dates in the network.
- The scheduled dates for the activities replace the dates in the WBS element via the minimum/maximum rule.