SAP ABAP Data Element PS_PSP_ELE (Work breakdown structure element (WBS element))
Hierarchy
SAP_ABA (Software Component) Cross-Application Component
   CA-GTF-TS (Application Component) Technical Application Support
     BK (Package) CO Cross-application Objects
Basic Data
Data Element PS_PSP_ELE
Short Description Work breakdown structure element (WBS element)  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type PS_POSNR    
Data Type NUMC   Character string with only digits 
Length 8    
Decimal Places 0    
Output Length 24    
Value Table PRPS    
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name WBS_ELEM   
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 WBS elem. 
Medium 15 WBS element 
Long 20 WBS element 
Heading 24 WBS element 
Documentation

Definition

Key identifying a WBS element.

Supplementary Documentation - PS_PSP_ELE0140

Dependencies

This field is only of relevance if the production order is assigned to the account of the project.

Supplementary Documentation - PS_PSP_ELE0600

Use

WBS element to which the order is assigned.

Dependencies

You cannot budget for an order when you assign it to a WBS element, as the order will be budgeted for as part of project budgeting.

Supplementary Documentation - PS_PSP_ELE2120

Use

You can assign a WBS element to a network:

  • in the network header
  • in the activities

Dependencies

If you maintain a WBS element in the header when creating a network, you must consider that:

  • when the network has its account assignment in the header the WBS element will be identified as an account assignment element.
  • when the network has its account assignment in the header the WBS element will be copied into every activity in the network.
  • The system will copy the corresponding project definitions.
  • You can copy the basic dates from the project definition as defaults for the basic dates in the network.
  • The scheduled dates for the activities replace the dates in the WBS element via the minimum/maximum rule.

History
Last changed by/on SAP  19981210 
SAP Release Created in