SAP ABAP Data Element PLNNR (Key for Task List Group)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       CP (Package) R/3 Application development: PP Task Lists
Basic Data
Data Element PLNNR
Short Description Key for Task List Group  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type PLNNR    
Data Type CHAR   Character String 
Length 8    
Decimal Places 0    
Output Length 8    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID PLN  
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Group 
Medium 15 Group 
Long 20 Group 
Heading Group 
Documentation

Definition

Key identifying a group.

Use

You can use groups, for instance, to identify two routings that have different production steps for one material.

Procedure

Enter the group to which you want to restrict the selection.

Supplementary Documentation - PLNNR 0001

Procedure

To search for a PS text, enter the number of a standard network and press F16.

Supplementary Documentation - PLNNR 0002

Use

If you are maintaining relationships, this field specifies the number of the standard network containing the activity for which you maintain the relationship.

Supplementary Documentation - PLNNR 0003

Procedure

Enter the key of the standard network that you want to transfer from the project management system into an MPX file.

Supplementary Documentation - PLNNR 0004

Dependencies

You can set the key alphanumerically for the group when you create a task list.

If you do not specify a key, a numeric key will be assigned internally by the system.

In the case of external number assignment, you must make sure that the number you specify is within the number range defined for the task list type you are creating.

Supplementary Documentation - PLNNR 0005

Use

Procedure

If you want to limit the selection, enter a group.

Examples

Dependencies

Supplementary Documentation - PLNNR 0033

Procedure

To search for PS texts used in a library network, enter the key for the library network here and press Enter.

Supplementary Documentation - PLNNR 0060

Procedure

Enter the routing/plan group of the routing/plan that you want to change using this change number.

Supplementary Documentation - PLNNR 0660

Use

Enter the task list group of a reference operation set.

Supplementary Documentation - PLNNR 0700

Use

Procedure

Assign a numeric or alphanumeric key here if you want to combine several task lists into one group.

You can assign a numeric key (external assignment) or let the system assign one for you (internal assignment).
If you assign a number externally, make sure it is within the number range for external number assignment. Number ranges are dependent on task list type.

Examples

Dependencies

If you do not enter a group when creating a routing, the system assigns a group from the internal number range. You see the group number on the status line when you save your routing. You can use the group number to change and display the routing. Later you can allocate a material to a task list which you created in this way.

Supplementary Documentation - PLNNR 1000

Definition

Key indicating a library network.

Procedure

To search for PS texts in library network, type in the key for a library network and press Enter.

Supplementary Documentation - PLNNR 2000

Definition

Key indicating a library network.

Supplementary Documentation - PLNNR 3000

Use

For maintenance plans with the maintenance call object notification, you do not, as a rule, have to assign a task list to a maintenance item.

You should only specify a task list if you later want to combine the generated notifications in an order using the list editing function for notifications ("Worklist for planned maintenance").

If you generate an order using the worklist, the system copies the operations of the task list to the order.

Dependencies

Example

History
Last changed by/on SAP  19991124 
SAP Release Created in