Where Used List (Table) for SAP ABAP Table T024F (Production scheduler)
SAP ABAP Table
T024F (Production scheduler) is used by
| # | Object Type | Object Name | Object Description | Package | Structure Package | Software Component |
|---|---|---|---|---|---|---|
| 1 | AFFW | Goods Movements with Errors from Confirmations | ||||
| 2 | AFKO | Order Header Data PP Orders | ||||
| 3 | AFKO_INC | Order Header Data PP Orders | ||||
| 4 | AFKO_UPDATE_RELEVANT | Fields that are relevant for update from AFKO (sim. vers.) | ||||
| 5 | AUFKR | Order Master Data Structure for Project Reporting | ||||
| 6 | BAPIMATMRC | BAPI CRS Structure for MARC (Material) | ||||
| 7 | BAPIPLAF_E1 | Transfer Structure: Planned Order | ||||
| 8 | BMMH1 | Material Master: Transfer of Main Data | ||||
| 9 | CAUFVDQ | Order header structure | ||||
| 10 | CAUFVTAB | Maps Database View CAUFV as Internal Table | ||||
| 11 | COCF_S_PM_ORD_LIST | Maintenance orders | ||||
| 12 | CORUF | Input/output fields for order confirmations | ||||
| 13 | DCAUFV_ST | Work Center Header Data | ||||
| 14 | EMARC1 | Data Division MARC: Division 1 | ||||
| 15 | MCAFKO | Order header data PP orders | ||||
| 16 | MT61D | Material Master: MRP | ||||
| 17 | NETZR | Network Master Data Structure for Project Reporting | ||||
| 18 | PLAF | Planned Order | ||||
| 19 | PRSEL | Dialog structure for entering selections for printing | ||||
| 20 | RC27C | Initial screen for updating material master records | ||||
| 21 | RC27D | Initial fields for mass update of material masters | ||||
| 22 | RM61E | Pull List: General Input/Output Fields | ||||
| 23 | ROIO_HD_PM_LIST | List fields for held PM orders | ||||
| 24 | ROIO_HD_PM_LIST_CMP | Fields for list of PM order components | ||||
| 25 | SMB_UIE_MTS_PRODSCHED_LT | Production scheduler UI information | ||||
| 26 | T399X | Parameters dependent on order type | ||||
| 27 | TCX00 | Scheduling: Planning Levels and Control Parameters | ||||
| 28 | TCX01 | Control Table for Scheduling | ||||
| 29 | TCX02 | Scheduling Parameters for Scheduling - Planned Orders | ||||
| 30 | TCX03 | Control Parameters for Scheduling: SOP Orders | ||||
| 31 | TCX0L | Scheduling long term planning: Levels and control parameters | ||||
| 32 | TXI_T024F | Production scheduler | ||||
| 33 | VSAFKO_CN | Version: Order header data for PP orders |