Where Used List (Program) for SAP ABAP Table/Structure Field AFVGD-FSAVZ (AFVGD)
SAP ABAP Table/Structure Field
AFVGD - FSAVZ (AFVGD) is used by
| # | Object Type | Object Name | Object Description | Package | Structure Package | Software Component |
|---|---|---|---|---|---|---|
| 1 | COFORM00 | FORM Routine of Application Area CO (For All Module Pools) | ||||
| 2 | COFORMKD | Interface for serial number processing | ||||
| 3 | COMCJGR1 | Common Part für die Transfertabellen | ||||
| 4 | FCJWBFMS_MS_MODIFY_PAI | Check whether a mask exists for the version number for sim. versions | ||||
| 5 | FCNGRFGB | Project Info System Reporting: Graphics Connection, GANTT Chart | ||||
| 6 | FCOMCJGR | Common part für Projektplantafel | ||||
| 7 | FCOMCJGR_BELTAB_ACT | Include FCOMCJGR_BELTAB_ACT | ||||
| 8 | FGANTT01 | Constants for Gantt Chart in Projects | ||||
| 9 | LBBP_PSFA1 | Subroutines BBP@PS | ||||
| 10 | LCJGRF1H | SCALE_OBJECT | ||||
| 11 | LCJGRF33 | MOVE_OBJ_NW_HORIZONTALLY | ||||
| 12 | LCJGRF34 | MOVE_OBJ_HORIZONTALLY | ||||
| 13 | LCJGRFA5 | SET_LOWER_ELEM_DATES | ||||
| 14 | LCJGRFA6 | SET_LOWER_DATES | ||||
| 15 | LCJTRF59 | GET_OPR_DURATION_ONLY | ||||
| 16 | LCJTRF6S | SCALE_ACT | ||||
| 17 | LCJTRF7H | MOVE_BAR | ||||
| 18 | LCJTRF84 | INSERT_ACT_DATE | ||||
| 19 | LCJTRF8D | FIX_OPERATION | ||||
| 20 | LCJTRF8T | CHANGE_ACT_DATE | ||||
| 21 | LCJTRFBP | OPR_BASIC_DATE_RESET | ||||
| 22 | LCJTRFIL | LCJTRFIL | ||||
| 23 | LCNIF_MATF04 | Include LCNIF_MATF04 | ||||
| 24 | LCO2OF0I | LCO2OF0I | ||||
| 25 | LCO2OF0O | LCO2OF0O | ||||
| 26 | LCO2OF0T | LCO2OF0T | ||||
| 27 | LCOKOFB7 | Include LCOKOFB7 | ||||
| 28 | LCOMKF0H | Transfer Components to Network Activities (External Call) | ||||
| 29 | LCOMKF53 | LCOMKF53 | ||||
| 30 | LCOOCMBCXI | Routine for the post scheduling of operations (CX=sched.) | ||||
| 31 | LCORUF80 | Include LCORUF80 | ||||
| 32 | LCOS6F0Q | Include LCOS6F0Q | ||||
| 33 | LCOSDF11 | BOM_STB_TRANSFER | ||||
| 34 | LCOVFI43 | Include LCOVFI43 | ||||
| 35 | LCOVGFT0 | CIF Get Current Stock | ||||
| 36 | LCOXTF05 | Include LCOXTF05 | ||||
| 37 | LCOXTF15 | LCOXTF15 | ||||
| 38 | LCOXTF23 | Include LCOXTF23 | ||||
| 39 | LCO_SEF05 | Include LCO_SFWS_SCF05 | ||||
| 40 | LCXORF20 | LCXORF20 | ||||
| 41 | LCXORF30 | Network: change component with reference | ||||
| 42 | LCXORF40 | LCXORF40 | ||||
| 43 | LCXORF50 | Include LCXORF50 | ||||
| 44 | LCXOTF10 | LCXOTF10 | ||||
| 45 | LCXTKF20 | Include LCVBAPIF01 | ||||
| 46 | LCXTMF01 | LCXTMF01 | ||||
| 47 | LCY04FA1 | A | ||||
| 48 | LCY04FC2 | Finite Scheduling of Operation | ||||
| 49 | LCY04FC3 | Capacity load update for dispatched operation | ||||
| 50 | LCY04FD1 | Include with all Routines Starting with "D" | ||||
| 51 | LCY04FD2 | Date check for dispatched operation | ||||
| 52 | LCY04FP1 | Predecessor and Successor of Operation | ||||
| 53 | LCY04FP2 | Phases Finite Scheduling | ||||
| 54 | LCY04TOP | LCY04TOP | ||||
| 55 | LCY27F01 | Evaluates the returned table for POI interface | ||||
| 56 | LIBAPI_OF37 | Check Date Restrictions | ||||
| 57 | LIWO_UI_UIFBD | LIWO_UI_UIFBD | ||||
| 58 | LIWO_UI_UITOP | LIWO_UI_UITOP | ||||
| 59 | LMILL_OCTOP | LMILL_OCTOP | ||||
| 60 | LMP01F04 | LMP01F04 | ||||
| 61 | LMP01F05 | LMP01F05 | ||||
| 62 | LMP01F16 | LMP01F16 | ||||
| 63 | LNWGRF0J | INSERT_ACT_DATE | ||||
| 64 | LNWGRF0K | DELETE_ACT_DATES | ||||
| 65 | LNWGRF0N | FIX_OPERATION | ||||
| 66 | LNWGRF0Z | FILL_ELEM | ||||
| 67 | LNWGRF17 | AUSWERTUNG_ELEM | ||||
| 68 | LNWGRF1C | CHANGE_ACT_DATE | ||||
| 69 | LNWGRF1U | MOVE_BAR | ||||
| 70 | LNWGRF1Z | MODIFY_ELEM | ||||
| 71 | LNWGRF2N | SCALE_ACT | ||||
| 72 | PSIS_COMPLETE_2 | forms for completing selected data | ||||
| 73 | RCAMPF01 | Include LCPC3F01 | ||||
| 74 | RCN00FZE | Project Info System: Form Routines for Events and Time Differences | ||||
| 75 | RCNOPER | Excel Value Table - Operations | ||||
| 76 | RCNSOFZG | Project Info System: Form Routines, Data Selection (Get Times) | ||||
| 77 | RIPREG01 | PM: Operation Control Ticket Version 1 | ||||
| 78 | SAPFCJGR_GETDATA_FILL_BARS_ACT | CJPN_PROJEKTNUMMER_EDIT | ||||
| 79 | SAPFCJGR_GETDATA_FILL_BARS_ELM | CJPN_PROJEKTNUMMER_EDIT | ||||
| 80 | SAPLCOIH | SAPLCOIH | ||||
| 81 | SAPLCONW | SAPLCONW | ||||
| 82 | SAPLCONW | SAPLCONW | ||||
| 83 | SAPLCORU | Confirmation: Function Modules and Dialog Control Modules | ||||
| 84 | SAPLCORU | Confirmation: Function Modules and Dialog Control Modules | ||||
| 85 | SAPLCORU | Confirmation: Function Modules and Dialog Control Modules | ||||
| 86 | SAPLCORU | Confirmation: Function Modules and Dialog Control Modules | ||||
| 87 | SAPLCORU | Confirmation: Function Modules and Dialog Control Modules | ||||
| 88 | SAPLCORU | Confirmation: Function Modules and Dialog Control Modules | ||||
| 89 | SAPLCOVF | Operation Detail Processing - Order | ||||
| 90 | SAPLCOVF | Operation Detail Processing - Order | ||||
| 91 | SAPLCOVF | Operation Detail Processing - Order | ||||
| 92 | SAPLCOVF | Operation Detail Processing - Order | ||||
| 93 | SAPLCOVF | Operation Detail Processing - Order | ||||
| 94 | SAPLCOVF | Operation Detail Processing - Order | ||||
| 95 | SAPLCOVF | Operation Detail Processing - Order | ||||
| 96 | SAPLCOVF | Operation Detail Processing - Order | ||||
| 97 | SAPLCOVF | Operation Detail Processing - Order | ||||
| 98 | SAPLCOVF | Operation Detail Processing - Order | ||||
| 99 | SAPLCOVF | Operation Detail Processing - Order | ||||
| 100 | SAPLCOVF | Operation Detail Processing - Order | ||||
| 101 | SAPLCOVF | Operation Detail Processing - Order | ||||
| 102 | SAPLCOVF | Operation Detail Processing - Order | ||||
| 103 | SAPLCOVF | Operation Detail Processing - Order | ||||
| 104 | SAPLCOVF | Operation Detail Processing - Order | ||||
| 105 | SAPLCOVF | Operation Detail Processing - Order | ||||
| 106 | SAPLCOVF | Operation Detail Processing - Order | ||||
| 107 | SAPLCOVF | Operation Detail Processing - Order | ||||
| 108 | SAPLCOVF | Operation Detail Processing - Order | ||||
| 109 | SAPLCOVF | Operation Detail Processing - Order | ||||
| 110 | SAPLCOVF | Operation Detail Processing - Order | ||||
| 111 | SAPLCOVF | Operation Detail Processing - Order | ||||
| 112 | SAPLCOVF | Operation Detail Processing - Order | ||||
| 113 | SAPLCOVG | Operation Processing PP | ||||
| 114 | SAPLCOVG | Operation Processing PP | ||||
| 115 | SAPLCOVG | Operation Processing PP | ||||
| 116 | SAPLCOVG | Operation Processing PP | ||||
| 117 | SAPLCOVG | Operation Processing PP | ||||
| 118 | SAPLCOVG | Operation Processing PP | ||||
| 119 | SAPLCOVG | Operation Processing PP | ||||
| 120 | SAPLCOVG | Operation Processing PP | ||||
| 121 | SAPLCOVG | Operation Processing PP | ||||
| 122 | SAPLCOVG | Operation Processing PP | ||||
| 123 | SAPLCOVG | Operation Processing PP | ||||
| 124 | SAPLCOVG | Operation Processing PP | ||||
| 125 | SAPLCOVG | Operation Processing PP | ||||
| 126 | SAPLCOVG | Operation Processing PP | ||||
| 127 | SAPLCOVG | Operation Processing PP | ||||
| 128 | SAPLCOVG | Operation Processing PP | ||||
| 129 | SAPLCOVG | Operation Processing PP | ||||
| 130 | SAPLCOVG | Operation Processing PP | ||||
| 131 | SAPLCOVG | Operation Processing PP | ||||
| 132 | SAPLCOVG | Operation Processing PP | ||||
| 133 | SAPLCOVG | Operation Processing PP | ||||
| 134 | SAPLCOVG | Operation Processing PP | ||||
| 135 | SAPLCOVG | Operation Processing PP | ||||
| 136 | SAPLCOVG | Operation Processing PP | ||||
| 137 | SAPLCOVG | Operation Processing PP | ||||
| 138 | SAPLCOVG | Operation Processing PP | ||||
| 139 | SAPLCOVG | Operation Processing PP | ||||
| 140 | SAPLFG_DATES | SAPLFG_DATES | ||||
| 141 | SAPLFG_DATES | SAPLFG_DATES | ||||
| 142 | SAPLIWO_UI_UI | SAPLIWO_UI_UI | ||||
| 143 | SAPLIWO_UI_UI | SAPLIWO_UI_UI | ||||
| 144 | SAPLIWO_UI_UI | SAPLIWO_UI_UI | ||||
| 145 | SAPMCNW1 | WWW: Individual Confirmation in the Internet | ||||
| 146 | SAPMCNW1 | WWW: Individual Confirmation in the Internet |