Screen |
Short Description |
1 |
0010 |
Empty Dummy Subscreen |
2 |
0100 |
Initial screen operation confirmation for production order |
3 |
0102 |
Window to enter the argument for confirmation parameters |
4 |
0110 |
Confirmation: Fixed parameter |
5 |
0119 |
Primary selection criteria for order selection |
6 |
0120 |
Parameters for selection of prod. order acc. to material |
7 |
0121 |
Parameter for selection production order acc. scheduler |
8 |
0122 |
Parameter for selection production order acc. planner group |
9 |
0123 |
Parameter for selecting production order acc. work center |
10 |
0130 |
List of Selected Production Orders |
11 |
0140 |
List of Selected Operations in a Production Order |
12 |
0150 |
Frame for detail screens for operation conf. prod.order |
13 |
0158 |
Original Screen 0150 from P40 Without Tab Strip |
14 |
0160 |
Detail Screen for Op.Conf.(Prod.Ord): Act. Data(Big Screen) |
15 |
0170 |
List of Individual Capacities |
16 |
0180 |
List of Suboperations |
17 |
0200 |
Variable Parameters |
18 |
0230 |
ALV Tree: Operation Overview Display |
19 |
0240 |
ALV Tree: Operation Overview Cancelation |
20 |
0300 |
Production Order: Collective Confirmation |
21 |
0301 |
Default Values for Actual Data from Collective Confirmation |
22 |
0302 |
Dialog Box for Error Proc. in Collective Conf.: TICKET/CONF. |
23 |
0303 |
Dialog Box for Error Proc.in Collective Conf.:TICKET/ORDERNR |
24 |
0350 |
Subscreen Container for Time Events |
25 |
0400 |
Initial screen header - confirmation for production order |
26 |
0410 |
Frame for Header Confirmation Detail Screens for Prod. Order |
27 |
0500 |
Test Screen for Time Events Initial Screen |
28 |
0600 |
Initial screen for operation confirmation:enter with refer. |
29 |
0700 |
Initial screen cumulative confirmation for production order |
30 |
0750 |
Detail Screens Frame for Progress Conf. of Prod. Orders |
31 |
0758 |
Frame for Detail Screens for Operation Conf. Prod.Order |
32 |
0760 |
Frame for Progress Conf.of Prod.Ord.: Actual Data(BigScreen) |
33 |
0800 |
Include screen for individual screen entry (detail data) |
34 |
0801 |
Detail Screen Confirmation of Time Event R10 |
35 |
0804 |
Detail Screen Confirmation for Time Event R20, R30 and R40 |
36 |
0805 |
Default Screen Collective Confirmation: Time Ticket/Key:CONF |
37 |
0806 |
Input List Collective Confirmation: Time Ticket/ Key: CONF. |
38 |
0807 |
Default Screen Collective Conf.: Time Ticket/Key: AUFNR |
39 |
0808 |
Input List Collective Confirmation: Time Ticket/ Key: AUFNR |
40 |
0811 |
Detail Screen Confirmation of Time Event B10 |
41 |
0814 |
Detail Screen Confirmation for Time Event B20, B30 and B40 |
42 |
0821 |
Detail Screen Confirmation of Time Event A10 |
43 |
0824 |
Detail Screen Confirmation for Time Event A20, A30 and A40 |
44 |
0830 |
Subscreen for confirmation of operation in production order |
45 |
0831 |
Subscreen for Confirmation of Suboperation in Prod. Order |
46 |
0832 |
Subscreen for Confirmation when Splitting a Production Order |
47 |
0833 |
Subscreen for Confirmation when Splitting a Production Order |
48 |
0834 |
Variable Activities for Time Events |
49 |
0835 |
Subscreen for cumul.conf.of a production order |
50 |
0836 |
Activity Confirmation |
51 |
0837 |
Subscreen for Header Confirmation of Production Order |
52 |
0838 |
Subscreen for Confirmation of Time Event: Record Type |
53 |
0844 |
Include Dynpro for Indiv. caps. Header for status of IndCap. |
54 |
0850 |
Detail Screen for Operation Confirmation: Qties/Activities |
55 |
0851 |
Detail Screen: Activities for Sub-Operations |
56 |
0855 |
Detail screen cumul.confirmation (prod.ord.):Qty/work |
57 |
0860 |
Detail Screen for Operation Conf.(Prod.Orders): Dates |
58 |
0861 |
Detail Screen for Operation Conf. (Prod.Ord.): Date Details |
59 |
0870 |
Detail Screen for Operation Conf. (Prod.Orders): Personnel |
60 |
0880 |
Detail screen for oper. confirmation(PrO): qty/actvty/forcst |
61 |
0881 |
Detail Screen Forecast for Suboperations |
62 |
0885 |
Detail screen cumul.conf.(prod.ord.): Qty/work/forecast |
63 |
0890 |
Detail Screen: Administration Data |
64 |
0895 |
Detail Screen Operation Confirm. (PrOrd): Cust.-Spec. Fields |
65 |
0900 |
Detail Screen for Op.Confirmation: Actual Data (Big Screen) |
66 |
0905 |
Det Screen for Cumul.Conf. Prod.Ord.:Act.Data (Big Screen) |
67 |
0910 |
Detail Screen: Confirmation for Production Order Header |
68 |
2000 |
Network: Initial Screen |
69 |
2050 |
Network: Initial Screen |
70 |
2100 |
Network: Activity overview |
71 |
2150 |
Network: Activity Overview with Confirmations (Display) |
72 |
2160 |
Network: activity overview with confirmations (reverse) |
73 |
2200 |
Network: Actual Data Detail Screen |
74 |
2250 |
Network: Actual Data Detail Screen (Summary Confirmation) |
75 |
2270 |
Network: detail screen for actual data (individual capacity) |
76 |
2350 |
Network: Collective confirmation with table control |
77 |
2390 |
Network: detail screen for collective confirmation |
78 |
2395 |
Network:detail screen for collective confirmation (ind.cap.) |
79 |
2400 |
Network: Element overview |
80 |
2450 |
Network: split overview |
81 |
2500 |
Network: Confirmation parameters |
82 |
2700 |
Network: Argument TCORU |
83 |
2800 |
Network: Order overview |
84 |
2810 |
Network: MRP selection |
85 |
2820 |
Network: project selection |
86 |
2830 |
Network: Work center selection |
87 |
3000 |
PM Order: Initial Screen |
88 |
3020 |
PM Order: List Screen, No Longer Used |
89 |
3100 |
PM Order: Operation Overview with Text (Entry) |
90 |
3105 |
Maintenance order: oper. overview with work/start date (ent) |
91 |
3150 |
PM Order: Operation Overview with Confirmations (Display) |
92 |
3160 |
PM Order: Operation Overview w.Confirmations (Cancellation) |
93 |
3200 |
PM Order: Detail Screen |
94 |
3250 |
PM Order: Planned Operation Dates |
95 |
3270 |
PM order: detail screen (indiv. capacity) |
96 |
3350 |
PM Order: Collective Confirmation with Table Control |
97 |
3351 |
PS/PM Confirmation: Print |
98 |
3360 |
PM Order: Collective Conf. with Table Control (Subscreen) |
99 |
3390 |
Maintenance order: detail screen for collective confirmation |
100 |
3395 |
Maintenance order: collect. conf. detail screen (ind. cap.) |
101 |
3450 |
PM Order: Split Overview |
102 |
3500 |
PM Order: Parameters |
103 |
3700 |
PM Order: Argument Parameter (TCORU) |
104 |
5100 |
Confirmation of Phase/Secondary Resource: Initial Screen |
105 |
5140 |
Process Order: List of Selected Operations |
106 |
5150 |
Screen Container for PP-PI Time Ticket Conf. with Tabs. |
107 |
5151 |
Frame for detail screens for phase conf. of process orders |
108 |
5158 |
Original Screen 5150 without Tabs. |
109 |
5160 |
Phase Confirmation: Actual Data |
110 |
5180 |
List of Secondary Resources for Operation/Phase |
111 |
5230 |
ALV Tree: Operation Overview Display |
112 |
5300 |
Process Order: Collective Confirmation |
113 |
5302 |
Dialog Box for Error Proc. in Collective Conf.: TICKET/CONF. |
114 |
5303 |
Dialog Box for Error Proc.in Collective Conf.:TICKET/ORDERNR |
115 |
5350 |
Frame for Detail Screens - Time Events for Process Order |
116 |
5400 |
Confirmation for Process Order Header: Initial Screen |
117 |
5410 |
Frame for Detail Screen:Confirmation of Process Order Header |
118 |
5500 |
Confirmation of Process Ord.: Time Event - Initial Screen |
119 |
5805 |
Process Ord: Default Collective Conf.- Time Ticket/Key:RUECK |
120 |
5806 |
Proc.Ord.: Detail Screen Collect.Conf.-Time Ticket/Key:RUECK |
121 |
5807 |
Process Ord.: Default Collect. Conf - Time Ticket/Key: AUFNR |
122 |
5808 |
Process Ord.: Detail Screen Coll.Conf-Time Ticket/Key:AUFNR |
123 |
5811 |
|
124 |
5814 |
Detail Screen Confirmation for Time Event B20, B30 and B40 |
125 |
5830 |
Phase Confirmation: Header |
126 |
5831 |
Confirmation for secondary resource: Header |
127 |
5834 |
Variable Activities for Time Events |
128 |
5850 |
Detail Screen: Quantities/Activities for Phase |
129 |
5851 |
Detail Screen: Services Secondary Resource |
130 |
5860 |
Detail screen: Dates phases-/secondary resources |
131 |
5870 |
Detail screen conf.of phases/secondary resources (PA): Pers. |
132 |
5880 |
Detail Screen: Quantities/Activities/Forecast |
133 |
5881 |
Detail Screen: Forecast Secondary Resource |
134 |
5895 |
Detail Screen Phase Confirmation (PrOrd) Cust.-Spec. Fields |
135 |
5900 |
Detail screen for Phase PA: Actual Data (Big Screen) |
136 |
5910 |
Detail Screen: Confirmation for Process Order Header |
|
|
|
# |
GUI Status |
Short Description |
1 |
29920 |
Network: Initial screen |
2 |
2AD20 |
Network: Detail screen |
3 |
2AE20 |
Network: Element overview |
4 |
2AP00 |
Network: Parameters |
5 |
2AR20 |
Network: Confirmation overview |
6 |
2AV20 |
Network: Activity overview |
7 |
2AX20 |
Network: Summary confirmation |
8 |
2AY20 |
Network: Individual capacity |
9 |
2AZ20 |
Network: Individual capacity overview |
10 |
2CORU |
Network: Initial screen (parameters) |
11 |
2HA20 |
Network: Initial screen |
12 |
2HC20 |
Network: Detail screen (dark: validation of required field) |
13 |
2HD20 |
Network: Detail screen |
14 |
2HE20 |
Network: Element overview |
15 |
2HR20 |
Network: Confirmation overview |
16 |
2HS20 |
Network: Network overview |
17 |
2HU20 |
Network: Element overview |
18 |
2HV20 |
Network: Activity overview |
19 |
2HY20 |
Network: Individual capacity |
20 |
2RLXX |
Newtork: Collective confirmation with table control |
21 |
2SD20 |
Network: Detail screen with cancellations |
22 |
3AD30 |
PM Order: Detail Screen (Display) |
23 |
3AL30 |
PM order: Standing order list |
24 |
3AP00 |
PM Order: Confirmation Parameters |
25 |
3AR30 |
PM Order: Confirmation Overview (Display) |
26 |
3AY30 |
PM Order: Individual Capacity |
27 |
3AZ30 |
PM Order: Individual Capacity Overview |
28 |
3HA30 |
PM Order: Initial Screen |
29 |
3HC30 |
PM order: Detail screen (creation) - dark |
30 |
3HD30 |
PM Order: Detail Screen (Entry) |
31 |
3HR30 |
PM Order: Confirmation Overview (Cancellation) |
32 |
3HT30 |
PM Order: Operation Dates |
33 |
3HV30 |
PM Order: Operation Overview with Text |
34 |
3HY30 |
PM Order: Individual Capacity |
35 |
3LD30 |
PM Order: Confirmation Detail Screen (Cancellation) |
36 |
3RLXX |
PM order: Collective confirmation with table control |
37 |
ACORU |
PM order: Collective confirmation with table control |
38 |
ADCORU |
PM order: Collective confirmation with table control |
39 |
ARD10 |
Production order: Confirmation detail, display time ticket |
40 |
ARD40 |
Process order: Confirmation detail, display time ticket |
41 |
ARE10 |
Prod. order: Confirm., initial screen for display & cancel |
42 |
ARE40 |
Process order: Confirmation, access for display & cancel |
43 |
ARL10 |
Production order: Confirmation overview for display & cancel |
44 |
ARL40 |
Process order: Display confirmation |
45 |
ARO10 |
Confirmation for production order: Initial screen |
46 |
ARO40 |
Process order: Confirmation, display order header |
47 |
ARP00 |
Process order: Confirmation, display order header |
48 |
ARS10 |
Process order: Confirmation, display order header |
49 |
ARS40 |
Process order: Confirmation, display order header |
50 |
ARU10 |
Process order: Confirmation, display order header |
51 |
ASD10 |
Process order: Confirmation, display order header |
52 |
ASD40 |
Process order: Confirmation |
53 |
ASL10 |
Process order: Confirmation |
54 |
BDEA40 |
Production order: Confirmation, display of time event |
55 |
BDED |
Production order: Confirmation, create & display time event |
56 |
BDED40 |
Process order: Confirmation, create & display time event |
57 |
BDEL |
Process order: Confirmation, create & display time event |
58 |
ECORU |
Process order: Confirmation, create & display time event |
59 |
EVENT |
Prod. order:Confirm., initial screen for creating time event |
60 |
EVENT40 |
Process order: Confirmation, access for creating time event |
61 |
FBS10 |
Actual data screen via function module |
62 |
FBSO1 |
Prod.order: Confirmation, creation order header with f.mod. |
63 |
HR20 |
Actual data screen via function module |
64 |
HRA10 |
Confirmation for production order: Initial screen |
65 |
HRA40 |
Confirmation for process order: Initial screen |
66 |
HRD10 |
Production order: Confirmation, create time ticket |
67 |
HRD40 |
Process order: confirmation, create time ticket |
68 |
HRE00 |
Process order: confirmation, create time ticket |
69 |
HRE10 |
Prod. order: Confirm., init. screen for creating time ticket |
70 |
HRE40 |
Prod. order: Confirm., init. screen for creating time ticket |
71 |
HRF10 |
Prod.order: Confirmation, initial screen for wage slip |
72 |
HRI10 |
Prod.order: Confirmation, initial screen for wage slip |
73 |
HRL00 |
Production order: Confirmation, create collective order |
74 |
HRL10 |
Production order: Confirmation, create collective order |
75 |
HRL40 |
Process order: Confirmation, collective entry |
76 |
HRLSE |
Process order: Confirmation, collective entry |
77 |
HRO10 |
Confirmation for production order: Initial screen |
78 |
HRO40 |
Process order: Confirmation, create order header |
79 |
HRS10 |
Process order: Confirmation, create order header |
80 |
HRS40 |
Process order: Confirmation, create order header |
81 |
HRX10 |
Prod.order: Collective conf., processing of entry errors |
82 |
HSD10 |
Process order: Confirmation, create order header |
83 |
HSD40 |
Process order: Confirmation time ticket |
84 |
HSL10 |
Process order: Confirmation time ticket |
85 |
HSL40 |
Process order: Confirmation time ticket |
86 |
LRD10 |
Confirmation for production order: Cancel |
87 |
LRD40 |
Process order: Confirmation, cancel |
88 |
LRE10 |
Process order: Confirmation, cancel |
89 |
LRL10 |
Process order: Confirmation, cancel |
90 |
LRS10 |
Process order: Confirmation, cancel |
91 |
LSD10 |
Process order: Confirmation, cancel |
92 |
LSD40 |
Process order: Cancel time ticket secondary resource |
93 |
STATUS_3351 |
Status Screen 3351 |
94 |
UCORU |
Process order: Cancel time ticket secondary resource |
95 |
UDCORU |
Process order: Cancel time ticket secondary resource |
96 |
XSUG10 |
Proposal of actual data using dialog box |
|
|
|
# |
GUI Title |
Short Description |
1 |
3RY |
& PM Order Confirmation: Individual Capacity |
2 |
3RZ |
& PM Order Confirmation: Individual Capacity Overview |
3 |
BDE |
Confirmation of Time Event & : & |
4 |
E20 |
& Network Confirmation: Initial Screen |
5 |
E30 |
& PM Order Confirmation: Initial Screen |
6 |
EF0 |
Progress Confirmation for Prod. &: Initial Screen |
7 |
ER0 |
& Production Order Confirmation: Initial Screen |
8 |
ER4 |
& Process Order Confirmation: Initial Screen |
9 |
ERR |
Enter Confirmation Using Ref. Confirmation: Initial Screen |
10 |
FB1 |
Confirmation of Production Order |
11 |
FB2 |
Confirmation of Process Order |
12 |
L13 |
Confirmation for PM Order: Standing Order List |
13 |
LE2 |
& Network Confirmation: Element Overview |
14 |
LR0 |
& Production Order Confirmation: Operation Overview |
15 |
LR2 |
& Network Confirmation: Activity Overview |
16 |
LR3 |
& PM Order Confirmation: Operation Overview |
17 |
LR4 |
& Process Order Confirmation: Operation/Phase Overview |
18 |
LRB |
& Process Order Confirmation: Summary Confirmation |
19 |
LRC |
& Production Order Confirmation: Individual Capacities |
20 |
LRU |
& Production Order Confirmation: Summary Confirmation |
21 |
LS2 |
Network Confirmation: Collective Confirmation |
22 |
LS3 |
PM Order Confirmation: Collective Confirmation |
23 |
LV2 |
Pool Name |
24 |
LV3 |
Pool Name |
25 |
PR0 |
Fixed Parameters |
26 |
PR2 |
Parameters for Network Confirmation |
27 |
PR3 |
Parameters for Maintenance Order Confirmation |
28 |
PR4 |
Parameters for Process Order Confirmation |
29 |
RR3 |
& PM Order Confirmation: Confirmation Overview |
30 |
S20 |
Network Selection |
31 |
S2A |
Network/Work Center Selection |
32 |
S2D |
Network/MRP Controller Selection |
33 |
S2X |
Networks/Project Selection |
34 |
SB0 |
Process Order Selection |
35 |
SBA |
Process Order/Work Center Selection |
36 |
SBD |
Process Order/MRP Controller Selection |
37 |
SBM |
Process Order/Material Selection |
38 |
SBP |
Process Order/Production Scheduler Selection |
39 |
SR0 |
Production Order Selection |
40 |
SRA |
Production Order/Work Center Selection |
41 |
SRD |
Production Order/MRP Controller Selection |
42 |
SRM |
Production Order/Material Selection |
43 |
SRP |
Production Order/Production Scheduler Selection |
44 |
TITLE_3351 |
Print |
45 |
TR0 |
Parameters for Order Confirmation |
46 |
TR3 |
& PM Order Confirmation: Operation Dates |
47 |
TRA |
Display Parameters for Order Confirmation |
48 |
TRU |
Maintain Parameters for Order Confirmation |
49 |
VR0 |
Variable Parameters |
50 |
X99 |
Process Network Confirmation |
51 |
XR0 |
Confirmation of Production Order & : & |
52 |
XR2 |
& Network Confirmation: & |
53 |
XR3 |
& PM Order Confirmation: & |
54 |
XR4 |
Process Order Confirmation &1 : &2 |
55 |
XR5 |
Progress Confirmation for Production Order &: & |
56 |
XRD |
& |
57 |
XRE |
Fast Entry: & |
58 |
XRL |
Collective Entry: & |
59 |
XRP |
& Confirmation of Process Order: Create Time Event |
60 |
XRT |
Create Time Event |
61 |
XRX |
& Network Confirmation: Summary Confirmation |
62 |
XRY |
& Network Confirmation: Individual Capacity |
63 |
XRZ |
& Network Confirmation: Individual Capacity Overview |
|
|
|