Data Element list used by SAP ABAP Table VBBED (Sales Requirement: Dynamic Individual Record)
SAP ABAP Table
VBBED (Sales Requirement: Dynamic Individual Record) is using
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
![]() |
![]() |
|||
1 | ![]() |
APOMOBILE | Indicator for schedule line transfer to APO | |
2 | ![]() |
AUART | Sales Document Type | |
3 | ![]() |
AWAHR | Order probability of the item | |
4 | ![]() |
BDART | Requirement type | |
5 | ![]() |
BERID | MRP Area | |
6 | ![]() |
BERID | MRP Area | |
7 | ![]() |
CHARG_D | Batch Number | |
8 | ![]() |
CUOBJ_VA | Configuration | |
9 | ![]() |
DISMM | MRP Type | |
10 | ![]() |
DISST | Low-level code | |
11 | ![]() |
ETENE | Schedule line | |
12 | ![]() |
ETENR | Schedule line | |
13 | ![]() |
EWERK | Plant | |
14 | ![]() |
KNTTP | Account assignment category | |
15 | ![]() |
KUNAG | Sold-to party | |
16 | ![]() |
KUNWE | Ship-to party | |
17 | ![]() |
KZBWS | Valuation of Special Stock | |
18 | ![]() |
KZVBR | Consumption posting | |
19 | ![]() |
LFDAT_V | Delivery Date | |
20 | ![]() |
LFUHR | Time of delivery | |
21 | ![]() |
LGORT_D | Storage location | |
22 | ![]() |
LGORT_D | Storage location | |
23 | ![]() |
LOGSYSB | Logical system with which document was created | |
24 | ![]() |
MANDT | Client | |
25 | ![]() |
MATNR | Material Number | |
26 | ![]() |
MBDAT | Material Staging/Availability Date | |
27 | ![]() |
MBUHR | Material Staging Time (Local, Relating to a Plant) | |
28 | ![]() |
MEINS | Base Unit of Measure | |
29 | ![]() |
MONKZ | Indicator: for assembly order procedures | |
30 | ![]() |
NODIS | Requirements record not relevant to MRP | |
31 | ![]() |
OMENG | Open Qty in Stockkeeping Units for Transfer of Reqmts to MRP | |
32 | ![]() |
PLART | Planning type | |
33 | ![]() |
PLNKZ | Planning Indicator | |
34 | ![]() |
POSNE | Business item number | |
35 | ![]() |
POSNR_VA | Sales Document Item | |
36 | ![]() |
PRBME | Base unit of measure for product group | |
37 | ![]() |
PROJN | Old: Project number : No longer used --> PS_POSNR | |
38 | ![]() |
PS_POSNR | WBS Element | |
39 | ![]() |
PZMNG | Planned allocation quantity for independent requirements | |
40 | ![]() |
SERNR | BOM explosion number | |
41 | ![]() |
SOBKZ | Special Stock Indicator | |
42 | ![]() |
TECHS | Parameter Variant/Standard Variant | |
43 | ![]() |
TZNTIMESTP | Time Stamp (Date and Time) | |
44 | ![]() |
UMREFF | Conversion factor: quantities | |
45 | ![]() |
UPDKZ_D | Update indicator | |
46 | ![]() |
VBELE | Business document number | |
47 | ![]() |
VBELN_VA | Sales Document | |
48 | ![]() |
VBTYP | SD document category | |
49 | ![]() |
VMENG | Confirmed quantity for availability check in SKU | |
50 | ![]() |
VPMAT | Planning material | |
51 | ![]() |
VPWRK | Planning plant | |
52 | ![]() |
VPZUO | Allocation Indicator | |
53 | ![]() |
WADEL | Delete requirements at goods issue (internal update flag) | |
54 | ![]() |
WERKS_D | Plant |