Data Element list used by SAP ABAP Table RM61F (Input/Output Fields)
SAP ABAP Table RM61F (Input/Output Fields) is using
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
1 | Data Element | ABAND | Display other versions | |
2 | Data Element | ABBED | Display requirements rows | |
3 | Data Element | ABNZU | Display quantities still to be assigned | |
4 | Data Element | ABREI | Display coverage | |
5 | Data Element | ABVER | Display availability | |
6 | Data Element | ADATU | Date for beginning of validity | |
7 | Data Element | ALUEB | Display all higher-level materials only | |
8 | Data Element | ALUNT | Display all lower-level materials only | |
9 | Data Element | ANZKA | Only display capacity categories relevant to scheduling | |
10 | Data Element | BDATU | Date validity ends | |
11 | Data Element | BEMDV | Combination of two planning ISs or planning ID and prod.line | |
12 | Data Element | BRTPL | Gross requirements planning in the planning table | |
13 | Data Element | CFRTXTS | Data element short text | |
14 | Data Element | CFRTXTS | Data element short text | |
15 | Data Element | CFRTXTS | Data element short text | |
16 | Data Element | CFRTXTS | Data element short text | |
17 | Data Element | CHAR80 | Char 80 | |
18 | Data Element | DATUM_F | First day of period | |
19 | Data Element | DATUM_L | Last day of the period | |
20 | Data Element | DISPO | MRP controller | |
21 | Data Element | DISPO | MRP controller | |
22 | Data Element | DZLSP1 | Line | |
23 | Data Element | DZLSP1 | Line | |
24 | Data Element | DZLSP1 | Line | |
25 | Data Element | DZLSP1 | Line | |
26 | Data Element | DZLSP5 | Specification: from line/column | |
27 | Data Element | EINH1 | Unit of the planning ID 1 | |
28 | Data Element | EINH2 | Unit of the planning ID 2 | |
29 | Data Element | EININ | Individual unit according to material | |
30 | Data Element | EINL1 | UoM FOR prod.line 1 in graphic: repetitive manufacturing | |
31 | Data Element | EINL2 | UoM for prod.line 2 in graphic: repetitive manufacturing | |
32 | Data Element | EINPG | UoM of the product group for graphic: repetitive mfg | |
33 | Data Element | ENDAY | End of validity period of the RS header | |
34 | Data Element | ERHOE | Increase run schedule quantity | |
35 | Data Element | ERWMD | Disable extended material data in REM planning table | |
36 | Data Element | FA_SICHTB | Production order visible in list printout | |
37 | Data Element | FIXSP | Firming date for changes in the planning table | |
38 | Data Element | FKABD | Display detailed planning capacity requirements | |
39 | Data Element | FRETX | Text stating whether production order is released | |
40 | Data Element | FRZEI | Freely definable period | |
41 | Data Element | GRAZM | Number of materials dispalyed in the graphic | |
42 | Data Element | GR_COVER | Ranges of Coverage Displayed in Graphic | |
43 | Data Element | GR_DEMAND | Display requiremenets in the graphic | |
44 | Data Element | GR_KAPDAT | Display capacity data in the graphic | |
45 | Data Element | GR_PQUANT | Run schedule quantities are displayed in the graphic | |
46 | Data Element | GR_SHOWALL | Display all lines in graphic | |
47 | Data Element | GR_VERFUG | Available quantities are displayed in the graphic | |
48 | Data Element | GZEIT | Total Period | |
49 | Data Element | HNAME | Group name | |
50 | Data Element | JAHR1 | Start year | |
51 | Data Element | JAHR2 | End year | |
52 | Data Element | JAHR2 | End year | |
53 | Data Element | KNDPL | Make-to-order planning in the planning table | |
54 | Data Element | KOMPF | Scaling factor | |
55 | Data Element | KPFLG | Indicator: Capacity planning active | |
56 | Data Element | KRIT1 | Planning criterion | |
57 | Data Element | LELIW | Only select materials with production | |
58 | Data Element | LGOR1 | Storage location MRP in the planning table | |
59 | Data Element | LGOR2 | Excluded storage locations in the planning table | |
60 | Data Element | LGORT_D | Storage location | |
61 | Data Element | MANDT | Client | |
62 | Data Element | MATNR | Material Number | |
63 | Data Element | MATNR | Material Number | |
64 | Data Element | MCSEH | Unit for statistics | |
65 | Data Element | MDV01 | Production line | |
66 | Data Element | MDV01 | Production line | |
67 | Data Element | MDV02 | Planning identification 2 | |
68 | Data Element | MDV02 | Planning identification 2 | |
69 | Data Element | MRPPP | PPC planning calendar | |
70 | Data Element | MSTPL | Direct Production in Planning Table | |
71 | Data Element | NETPL | Net requirements segment in the planning table | |
72 | Data Element | PAGEC | Page counter | |
73 | Data Element | PAGEC | Page counter | |
74 | Data Element | PA_SICHTB | Planned order visible in list printout | |
75 | Data Element | PER1 | Start period | |
76 | Data Element | PER2 | End period | |
77 | Data Element | PER3 | Roll forward period | |
78 | Data Element | PERTXT_F | First period | |
79 | Data Element | PERTXT_L | Last period | |
80 | Data Element | PER_C2 | Period with field length 2 (week, month) | |
81 | Data Element | PER_C2 | Period with field length 2 (week, month) | |
82 | Data Element | PLID_TEXT | Planning identification text | |
83 | Data Element | PLID_TEXT | Planning identification text | |
84 | Data Element | PLNAL | Group Counter | |
85 | Data Element | PLNAL | Group Counter | |
86 | Data Element | PLNAW | Application of the task list | |
87 | Data Element | PLNAW | Application of the task list | |
88 | Data Element | PLNUM | Planned order number | |
89 | Data Element | PRGRP | Name of the product group | |
90 | Data Element | PROPL | Planning individual projects in the planning table | |
91 | Data Element | QUOTE | Quota | |
92 | Data Element | RFDA1 | Delete date for the roll forward | |
93 | Data Element | RFDA2 | Start date of period where distribution is done in roll fwd | |
94 | Data Element | RFDA3 | End date of roll forwaard | |
95 | Data Element | RKABD | Display rate-based planning capacity requirements | |
96 | Data Element | SAFER | Run schedule header with production orders | |
97 | Data Element | SAFER | Run schedule header with production orders | |
98 | Data Element | SAKOS | Run schedule header with cost collector | |
99 | Data Element | SAKOS | Run schedule header with cost collector | |
100 | Data Element | SA_AUART | Production type | |
101 | Data Element | SA_AUFNR | Run schedule header number | |
102 | Data Element | SA_AUFSI | Run schedule header visible in list printout | |
103 | Data Element | SA_FLDNN | Value field for planning | |
104 | Data Element | SA_FLDNN | Value field for planning | |
105 | Data Element | SA_FLDNN | Value field for planning | |
106 | Data Element | SA_FLDNN | Value field for planning | |
107 | Data Element | SA_FLDNN | Value field for planning | |
108 | Data Element | SA_KRIT1 | Description for Repetitive Manufacturing | |
109 | Data Element | SA_LFZBG | Start of the Period to Be Evaluated | |
110 | Data Element | SA_LFZEN | End of the period of examination | |
111 | Data Element | SA_LINE1 | Production line for repetitive manufacturing | |
112 | Data Element | SA_LINE2 | Production line 2 for repetitive manufacturing | |
113 | Data Element | SA_LINS | Accessing the planning table via a work center hierarchy | |
114 | Data Element | SA_PERBP | Period: posting period | |
115 | Data Element | SA_PERMO | Bucket: month | |
116 | Data Element | SA_PERNN | Period information | |
117 | Data Element | SA_PERNN | Period information | |
118 | Data Element | SA_PERNN | Period information | |
119 | Data Element | SA_PERNN | Period information | |
120 | Data Element | SA_PERNN | Period information | |
121 | Data Element | SA_PERPK | Bucket: planning calendar | |
122 | Data Element | SA_PERTG | Bucket: day | |
123 | Data Element | SA_PERWO | Bucket: week | |
124 | Data Element | SA_REFNR | Reference order | |
125 | Data Element | SA_TASTA | Partial order status | |
126 | Data Element | SA_TAUFT | Partial order for run schedule header | |
127 | Data Element | SA_XMATN | Access planning table using a material | |
128 | Data Element | SA_XMATN | Access planning table using a material | |
129 | Data Element | SA_XORDR | Carry out planning for a run schedule header | |
130 | Data Element | SA_XPLID | Carry out planning for a planning ID | |
131 | Data Element | SCHICHT_F | Shift number start | |
132 | Data Element | SCHICHT_L | Shift number end | |
133 | Data Element | SCRZE | Period of the planninng screen | |
134 | Data Element | SELED | End date of period of examination for collective assignment | |
135 | Data Element | SELEKT | Selection indicator | |
136 | Data Element | SLDAY | Key date for selection | |
137 | Data Element | SLIN1 | Only the production line as selection criterion | |
138 | Data Element | SMDV1 | Only planning ID 1 as selection criterion | |
139 | Data Element | SMDV2 | Only planning ID 2 as selection criterion | |
140 | Data Element | SOBSL | Special procurement type | |
141 | Data Element | SOBSL | Special procurement type | |
142 | Data Element | SRTAD | Sort according to start date | |
143 | Data Element | SRTED | Sorting by finish date | |
144 | Data Element | SRTLI | Sorting by production line | |
145 | Data Element | SRTMA | Sorting by material | |
146 | Data Element | STALT | Alternative BOM | |
147 | Data Element | STALT | Alternative BOM | |
148 | Data Element | STDAY | Start of the validity period of the RS header | |
149 | Data Element | STLAN | BOM Usage | |
150 | Data Element | STLAN | BOM Usage | |
151 | Data Element | SUMFELD | Element in a totals row | |
152 | Data Element | SUMFELD | Element in a totals row | |
153 | Data Element | TEXT20 | Text (20 Characters) | |
154 | Data Element | TXT20 | Text for Criterion | |
155 | Data Element | TXT20 | Text for Criterion | |
156 | Data Element | TXT40 | Text, length 40 | |
157 | Data Element | TXT40 | Text, length 40 | |
158 | Data Element | TXT40 | Text, length 40 | |
159 | Data Element | UEBUN | Display all lower-level and higher-level materials | |
160 | Data Element | UNIT1 | Unit of the planning ID 1 | |
161 | Data Element | UNIT2 | Unit of the planning ID 2 | |
162 | Data Element | VBELN | Sales and Distribution Document Number | |
163 | Data Element | VERID | Production Version | |
164 | Data Element | VERID | Production Version | |
165 | Data Element | VERRI | Decrease run schedule quantity | |
166 | Data Element | VORPL | Planning without final assembly in the planning table | |
167 | Data Element | VOR_NACH | Indicator: display completed and/or higher-level material? | |
168 | Data Element | WERKS_D | Plant | |
169 | Data Element | WERKS_D | Plant | |
170 | Data Element | XGRUP | Accessing the planning table using a product group | |
171 | Data Element | XKOSA | Access planning table via run schedule header header | |
172 | Data Element | XLIN1 | Accessing the planning table using a production line | |
173 | Data Element | XLISH | Planning table view: production line and shift |