Data Element list used by SAP ABAP Table RM61F (Input/Output Fields)
SAP ABAP Table RM61F (Input/Output Fields) is using
# Object Type Object Name Object Description Note
     
1 Data Element  ABAND Display other versions
2 Data Element  ABBED Display requirements rows
3 Data Element  ABNZU Display quantities still to be assigned
4 Data Element  ABREI Display coverage
5 Data Element  ABVER Display availability
6 Data Element  ADATU Date for beginning of validity
7 Data Element  ALUEB Display all higher-level materials only
8 Data Element  ALUNT Display all lower-level materials only
9 Data Element  ANZKA Only display capacity categories relevant to scheduling
10 Data Element  BDATU Date validity ends
11 Data Element  BEMDV Combination of two planning ISs or planning ID and prod.line
12 Data Element  BRTPL Gross requirements planning in the planning table
13 Data Element  CFRTXTS Data element short text
14 Data Element  CFRTXTS Data element short text
15 Data Element  CFRTXTS Data element short text
16 Data Element  CFRTXTS Data element short text
17 Data Element  CHAR80 Char 80
18 Data Element  DATUM_F First day of period
19 Data Element  DATUM_L Last day of the period
20 Data Element  DISPO MRP controller
21 Data Element  DISPO MRP controller
22 Data Element  DZLSP1 Line
23 Data Element  DZLSP1 Line
24 Data Element  DZLSP1 Line
25 Data Element  DZLSP1 Line
26 Data Element  DZLSP5 Specification: from line/column
27 Data Element  EINH1 Unit of the planning ID 1
28 Data Element  EINH2 Unit of the planning ID 2
29 Data Element  EININ Individual unit according to material
30 Data Element  EINL1 UoM FOR prod.line 1 in graphic: repetitive manufacturing
31 Data Element  EINL2 UoM for prod.line 2 in graphic: repetitive manufacturing
32 Data Element  EINPG UoM of the product group for graphic: repetitive mfg
33 Data Element  ENDAY End of validity period of the RS header
34 Data Element  ERHOE Increase run schedule quantity
35 Data Element  ERWMD Disable extended material data in REM planning table
36 Data Element  FA_SICHTB Production order visible in list printout
37 Data Element  FIXSP Firming date for changes in the planning table
38 Data Element  FKABD Display detailed planning capacity requirements
39 Data Element  FRETX Text stating whether production order is released
40 Data Element  FRZEI Freely definable period
41 Data Element  GRAZM Number of materials dispalyed in the graphic
42 Data Element  GR_COVER Ranges of Coverage Displayed in Graphic
43 Data Element  GR_DEMAND Display requiremenets in the graphic
44 Data Element  GR_KAPDAT Display capacity data in the graphic
45 Data Element  GR_PQUANT Run schedule quantities are displayed in the graphic
46 Data Element  GR_SHOWALL Display all lines in graphic
47 Data Element  GR_VERFUG Available quantities are displayed in the graphic
48 Data Element  GZEIT Total Period
49 Data Element  HNAME Group name
50 Data Element  JAHR1 Start year
51 Data Element  JAHR2 End year
52 Data Element  JAHR2 End year
53 Data Element  KNDPL Make-to-order planning in the planning table
54 Data Element  KOMPF Scaling factor
55 Data Element  KPFLG Indicator: Capacity planning active
56 Data Element  KRIT1 Planning criterion
57 Data Element  LELIW Only select materials with production
58 Data Element  LGOR1 Storage location MRP in the planning table
59 Data Element  LGOR2 Excluded storage locations in the planning table
60 Data Element  LGORT_D Storage location
61 Data Element  MANDT Client
62 Data Element  MATNR Material Number
63 Data Element  MATNR Material Number
64 Data Element  MCSEH Unit for statistics
65 Data Element  MDV01 Production line
66 Data Element  MDV01 Production line
67 Data Element  MDV02 Planning identification 2
68 Data Element  MDV02 Planning identification 2
69 Data Element  MRPPP PPC planning calendar
70 Data Element  MSTPL Direct Production in Planning Table
71 Data Element  NETPL Net requirements segment in the planning table
72 Data Element  PAGEC Page counter
73 Data Element  PAGEC Page counter
74 Data Element  PA_SICHTB Planned order visible in list printout
75 Data Element  PER1 Start period
76 Data Element  PER2 End period
77 Data Element  PER3 Roll forward period
78 Data Element  PERTXT_F First period
79 Data Element  PERTXT_L Last period
80 Data Element  PER_C2 Period with field length 2 (week, month)
81 Data Element  PER_C2 Period with field length 2 (week, month)
82 Data Element  PLID_TEXT Planning identification text
83 Data Element  PLID_TEXT Planning identification text
84 Data Element  PLNAL Group Counter
85 Data Element  PLNAL Group Counter
86 Data Element  PLNAW Application of the task list
87 Data Element  PLNAW Application of the task list
88 Data Element  PLNUM Planned order number
89 Data Element  PRGRP Name of the product group
90 Data Element  PROPL Planning individual projects in the planning table
91 Data Element  QUOTE Quota
92 Data Element  RFDA1 Delete date for the roll forward
93 Data Element  RFDA2 Start date of period where distribution is done in roll fwd
94 Data Element  RFDA3 End date of roll forwaard
95 Data Element  RKABD Display rate-based planning capacity requirements
96 Data Element  SAFER Run schedule header with production orders
97 Data Element  SAFER Run schedule header with production orders
98 Data Element  SAKOS Run schedule header with cost collector
99 Data Element  SAKOS Run schedule header with cost collector
100 Data Element  SA_AUART Production type
101 Data Element  SA_AUFNR Run schedule header number
102 Data Element  SA_AUFSI Run schedule header visible in list printout
103 Data Element  SA_FLDNN Value field for planning
104 Data Element  SA_FLDNN Value field for planning
105 Data Element  SA_FLDNN Value field for planning
106 Data Element  SA_FLDNN Value field for planning
107 Data Element  SA_FLDNN Value field for planning
108 Data Element  SA_KRIT1 Description for Repetitive Manufacturing
109 Data Element  SA_LFZBG Start of the Period to Be Evaluated
110 Data Element  SA_LFZEN End of the period of examination
111 Data Element  SA_LINE1 Production line for repetitive manufacturing
112 Data Element  SA_LINE2 Production line 2 for repetitive manufacturing
113 Data Element  SA_LINS Accessing the planning table via a work center hierarchy
114 Data Element  SA_PERBP Period: posting period
115 Data Element  SA_PERMO Bucket: month
116 Data Element  SA_PERNN Period information
117 Data Element  SA_PERNN Period information
118 Data Element  SA_PERNN Period information
119 Data Element  SA_PERNN Period information
120 Data Element  SA_PERNN Period information
121 Data Element  SA_PERPK Bucket: planning calendar
122 Data Element  SA_PERTG Bucket: day
123 Data Element  SA_PERWO Bucket: week
124 Data Element  SA_REFNR Reference order
125 Data Element  SA_TASTA Partial order status
126 Data Element  SA_TAUFT Partial order for run schedule header
127 Data Element  SA_XMATN Access planning table using a material
128 Data Element  SA_XMATN Access planning table using a material
129 Data Element  SA_XORDR Carry out planning for a run schedule header
130 Data Element  SA_XPLID Carry out planning for a planning ID
131 Data Element  SCHICHT_F Shift number start
132 Data Element  SCHICHT_L Shift number end
133 Data Element  SCRZE Period of the planninng screen
134 Data Element  SELED End date of period of examination for collective assignment
135 Data Element  SELEKT Selection indicator
136 Data Element  SLDAY Key date for selection
137 Data Element  SLIN1 Only the production line as selection criterion
138 Data Element  SMDV1 Only planning ID 1 as selection criterion
139 Data Element  SMDV2 Only planning ID 2 as selection criterion
140 Data Element  SOBSL Special procurement type
141 Data Element  SOBSL Special procurement type
142 Data Element  SRTAD Sort according to start date
143 Data Element  SRTED Sorting by finish date
144 Data Element  SRTLI Sorting by production line
145 Data Element  SRTMA Sorting by material
146 Data Element  STALT Alternative BOM
147 Data Element  STALT Alternative BOM
148 Data Element  STDAY Start of the validity period of the RS header
149 Data Element  STLAN BOM Usage
150 Data Element  STLAN BOM Usage
151 Data Element  SUMFELD Element in a totals row
152 Data Element  SUMFELD Element in a totals row
153 Data Element  TEXT20 Text (20 Characters)
154 Data Element  TXT20 Text for Criterion
155 Data Element  TXT20 Text for Criterion
156 Data Element  TXT40 Text, length 40
157 Data Element  TXT40 Text, length 40
158 Data Element  TXT40 Text, length 40
159 Data Element  UEBUN Display all lower-level and higher-level materials
160 Data Element  UNIT1 Unit of the planning ID 1
161 Data Element  UNIT2 Unit of the planning ID 2
162 Data Element  VBELN Sales and Distribution Document Number
163 Data Element  VERID Production Version
164 Data Element  VERID Production Version
165 Data Element  VERRI Decrease run schedule quantity
166 Data Element  VORPL Planning without final assembly in the planning table
167 Data Element  VOR_NACH Indicator: display completed and/or higher-level material?
168 Data Element  WERKS_D Plant
169 Data Element  WERKS_D Plant
170 Data Element  XGRUP Accessing the planning table using a product group
171 Data Element  XKOSA Access planning table via run schedule header header
172 Data Element  XLIN1 Accessing the planning table using a production line
173 Data Element  XLISH Planning table view: production line and shift