Data Element list used by SAP ABAP Table RM61F (Input/Output Fields)
SAP ABAP Table
RM61F (Input/Output Fields) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | ABAND | Display other versions | ||
| 2 | ABBED | Display requirements rows | ||
| 3 | ABNZU | Display quantities still to be assigned | ||
| 4 | ABREI | Display coverage | ||
| 5 | ABVER | Display availability | ||
| 6 | ADATU | Date for beginning of validity | ||
| 7 | ALUEB | Display all higher-level materials only | ||
| 8 | ALUNT | Display all lower-level materials only | ||
| 9 | ANZKA | Only display capacity categories relevant to scheduling | ||
| 10 | BDATU | Date validity ends | ||
| 11 | BEMDV | Combination of two planning ISs or planning ID and prod.line | ||
| 12 | BRTPL | Gross requirements planning in the planning table | ||
| 13 | CFRTXTS | Data element short text | ||
| 14 | CFRTXTS | Data element short text | ||
| 15 | CFRTXTS | Data element short text | ||
| 16 | CFRTXTS | Data element short text | ||
| 17 | CHAR80 | Char 80 | ||
| 18 | DATUM_F | First day of period | ||
| 19 | DATUM_L | Last day of the period | ||
| 20 | DISPO | MRP controller | ||
| 21 | DISPO | MRP controller | ||
| 22 | DZLSP1 | Line | ||
| 23 | DZLSP1 | Line | ||
| 24 | DZLSP1 | Line | ||
| 25 | DZLSP1 | Line | ||
| 26 | DZLSP5 | Specification: from line/column | ||
| 27 | EINH1 | Unit of the planning ID 1 | ||
| 28 | EINH2 | Unit of the planning ID 2 | ||
| 29 | EININ | Individual unit according to material | ||
| 30 | EINL1 | UoM FOR prod.line 1 in graphic: repetitive manufacturing | ||
| 31 | EINL2 | UoM for prod.line 2 in graphic: repetitive manufacturing | ||
| 32 | EINPG | UoM of the product group for graphic: repetitive mfg | ||
| 33 | ENDAY | End of validity period of the RS header | ||
| 34 | ERHOE | Increase run schedule quantity | ||
| 35 | ERWMD | Disable extended material data in REM planning table | ||
| 36 | FA_SICHTB | Production order visible in list printout | ||
| 37 | FIXSP | Firming date for changes in the planning table | ||
| 38 | FKABD | Display detailed planning capacity requirements | ||
| 39 | FRETX | Text stating whether production order is released | ||
| 40 | FRZEI | Freely definable period | ||
| 41 | GRAZM | Number of materials dispalyed in the graphic | ||
| 42 | GR_COVER | Ranges of Coverage Displayed in Graphic | ||
| 43 | GR_DEMAND | Display requiremenets in the graphic | ||
| 44 | GR_KAPDAT | Display capacity data in the graphic | ||
| 45 | GR_PQUANT | Run schedule quantities are displayed in the graphic | ||
| 46 | GR_SHOWALL | Display all lines in graphic | ||
| 47 | GR_VERFUG | Available quantities are displayed in the graphic | ||
| 48 | GZEIT | Total Period | ||
| 49 | HNAME | Group name | ||
| 50 | JAHR1 | Start year | ||
| 51 | JAHR2 | End year | ||
| 52 | JAHR2 | End year | ||
| 53 | KNDPL | Make-to-order planning in the planning table | ||
| 54 | KOMPF | Scaling factor | ||
| 55 | KPFLG | Indicator: Capacity planning active | ||
| 56 | KRIT1 | Planning criterion | ||
| 57 | LELIW | Only select materials with production | ||
| 58 | LGOR1 | Storage location MRP in the planning table | ||
| 59 | LGOR2 | Excluded storage locations in the planning table | ||
| 60 | LGORT_D | Storage location | ||
| 61 | MANDT | Client | ||
| 62 | MATNR | Material Number | ||
| 63 | MATNR | Material Number | ||
| 64 | MCSEH | Unit for statistics | ||
| 65 | MDV01 | Production line | ||
| 66 | MDV01 | Production line | ||
| 67 | MDV02 | Planning identification 2 | ||
| 68 | MDV02 | Planning identification 2 | ||
| 69 | MRPPP | PPC planning calendar | ||
| 70 | MSTPL | Direct Production in Planning Table | ||
| 71 | NETPL | Net requirements segment in the planning table | ||
| 72 | PAGEC | Page counter | ||
| 73 | PAGEC | Page counter | ||
| 74 | PA_SICHTB | Planned order visible in list printout | ||
| 75 | PER1 | Start period | ||
| 76 | PER2 | End period | ||
| 77 | PER3 | Roll forward period | ||
| 78 | PERTXT_F | First period | ||
| 79 | PERTXT_L | Last period | ||
| 80 | PER_C2 | Period with field length 2 (week, month) | ||
| 81 | PER_C2 | Period with field length 2 (week, month) | ||
| 82 | PLID_TEXT | Planning identification text | ||
| 83 | PLID_TEXT | Planning identification text | ||
| 84 | PLNAL | Group Counter | ||
| 85 | PLNAL | Group Counter | ||
| 86 | PLNAW | Application of the task list | ||
| 87 | PLNAW | Application of the task list | ||
| 88 | PLNUM | Planned order number | ||
| 89 | PRGRP | Name of the product group | ||
| 90 | PROPL | Planning individual projects in the planning table | ||
| 91 | QUOTE | Quota | ||
| 92 | RFDA1 | Delete date for the roll forward | ||
| 93 | RFDA2 | Start date of period where distribution is done in roll fwd | ||
| 94 | RFDA3 | End date of roll forwaard | ||
| 95 | RKABD | Display rate-based planning capacity requirements | ||
| 96 | SAFER | Run schedule header with production orders | ||
| 97 | SAFER | Run schedule header with production orders | ||
| 98 | SAKOS | Run schedule header with cost collector | ||
| 99 | SAKOS | Run schedule header with cost collector | ||
| 100 | SA_AUART | Production type | ||
| 101 | SA_AUFNR | Run schedule header number | ||
| 102 | SA_AUFSI | Run schedule header visible in list printout | ||
| 103 | SA_FLDNN | Value field for planning | ||
| 104 | SA_FLDNN | Value field for planning | ||
| 105 | SA_FLDNN | Value field for planning | ||
| 106 | SA_FLDNN | Value field for planning | ||
| 107 | SA_FLDNN | Value field for planning | ||
| 108 | SA_KRIT1 | Description for Repetitive Manufacturing | ||
| 109 | SA_LFZBG | Start of the Period to Be Evaluated | ||
| 110 | SA_LFZEN | End of the period of examination | ||
| 111 | SA_LINE1 | Production line for repetitive manufacturing | ||
| 112 | SA_LINE2 | Production line 2 for repetitive manufacturing | ||
| 113 | SA_LINS | Accessing the planning table via a work center hierarchy | ||
| 114 | SA_PERBP | Period: posting period | ||
| 115 | SA_PERMO | Bucket: month | ||
| 116 | SA_PERNN | Period information | ||
| 117 | SA_PERNN | Period information | ||
| 118 | SA_PERNN | Period information | ||
| 119 | SA_PERNN | Period information | ||
| 120 | SA_PERNN | Period information | ||
| 121 | SA_PERPK | Bucket: planning calendar | ||
| 122 | SA_PERTG | Bucket: day | ||
| 123 | SA_PERWO | Bucket: week | ||
| 124 | SA_REFNR | Reference order | ||
| 125 | SA_TASTA | Partial order status | ||
| 126 | SA_TAUFT | Partial order for run schedule header | ||
| 127 | SA_XMATN | Access planning table using a material | ||
| 128 | SA_XMATN | Access planning table using a material | ||
| 129 | SA_XORDR | Carry out planning for a run schedule header | ||
| 130 | SA_XPLID | Carry out planning for a planning ID | ||
| 131 | SCHICHT_F | Shift number start | ||
| 132 | SCHICHT_L | Shift number end | ||
| 133 | SCRZE | Period of the planninng screen | ||
| 134 | SELED | End date of period of examination for collective assignment | ||
| 135 | SELEKT | Selection indicator | ||
| 136 | SLDAY | Key date for selection | ||
| 137 | SLIN1 | Only the production line as selection criterion | ||
| 138 | SMDV1 | Only planning ID 1 as selection criterion | ||
| 139 | SMDV2 | Only planning ID 2 as selection criterion | ||
| 140 | SOBSL | Special procurement type | ||
| 141 | SOBSL | Special procurement type | ||
| 142 | SRTAD | Sort according to start date | ||
| 143 | SRTED | Sorting by finish date | ||
| 144 | SRTLI | Sorting by production line | ||
| 145 | SRTMA | Sorting by material | ||
| 146 | STALT | Alternative BOM | ||
| 147 | STALT | Alternative BOM | ||
| 148 | STDAY | Start of the validity period of the RS header | ||
| 149 | STLAN | BOM Usage | ||
| 150 | STLAN | BOM Usage | ||
| 151 | SUMFELD | Element in a totals row | ||
| 152 | SUMFELD | Element in a totals row | ||
| 153 | TEXT20 | Text (20 Characters) | ||
| 154 | TXT20 | Text for Criterion | ||
| 155 | TXT20 | Text for Criterion | ||
| 156 | TXT40 | Text, length 40 | ||
| 157 | TXT40 | Text, length 40 | ||
| 158 | TXT40 | Text, length 40 | ||
| 159 | UEBUN | Display all lower-level and higher-level materials | ||
| 160 | UNIT1 | Unit of the planning ID 1 | ||
| 161 | UNIT2 | Unit of the planning ID 2 | ||
| 162 | VBELN | Sales and Distribution Document Number | ||
| 163 | VERID | Production Version | ||
| 164 | VERID | Production Version | ||
| 165 | VERRI | Decrease run schedule quantity | ||
| 166 | VORPL | Planning without final assembly in the planning table | ||
| 167 | VOR_NACH | Indicator: display completed and/or higher-level material? | ||
| 168 | WERKS_D | Plant | ||
| 169 | WERKS_D | Plant | ||
| 170 | XGRUP | Accessing the planning table using a product group | ||
| 171 | XKOSA | Access planning table via run schedule header header | ||
| 172 | XLIN1 | Accessing the planning table using a production line | ||
| 173 | XLISH | Planning table view: production line and shift |