Data Element list used by SAP ABAP Table PPE_PSIF01_EXT (Selection Criteria for BOM Assignment to PS)
SAP ABAP Table
PPE_PSIF01_EXT (Selection Criteria for BOM Assignment to PS) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | BDMNG | Requirement Quantity | ||
| 2 | CAPID | Application | ||
| 3 | CN_AENNR | Only items changed with the given change number | ||
| 4 | CN_AVCHK | Availability check during save | ||
| 5 | CN_FLG_PRE | In general generate preliminary requirements | ||
| 6 | CN_NODLG | Indicator: Run without dialog, automatic data backup | ||
| 7 | CUOBJ | Configuration (internal object number) | ||
| 8 | EXT_SYST | Copy data from external systems via user exit | ||
| 9 | KOKRS | Controlling Area | ||
| 10 | MATNR | Material Number | ||
| 11 | MAT_BOM | Indicator: only take material BOMs into account | ||
| 12 | NW_AUFNR | Network number | ||
| 13 | NW_AUFNR | Network number | ||
| 14 | PROFILE_IF | Profile for BOM transfer | ||
| 15 | PROJ_BOM | Indicator: Take project BOMs into account | ||
| 16 | PS_POSID | Work Breakdown Structure Element (WBS Element) | ||
| 17 | PS_POSNR | WBS Element | ||
| 18 | PS_POSNR | WBS Element | ||
| 19 | PS_PRDEF | Internal number for project definition | ||
| 20 | PS_PSPID | Project definition | ||
| 21 | SALES_BOM | Indicator: Take sales order BOM into account | ||
| 22 | SERNR | BOM explosion number | ||
| 23 | TECHS | Parameter Variant/Standard Variant | ||
| 24 | WERKS_D | Plant | ||
| 25 | XFELD | Checkbox | ||
| 26 | XFELD | Checkbox | ||
| 27 | XFELD | Checkbox |