Data Element list used by SAP ABAP View V_TCX02 (Lead time scheduling - planned orders)
SAP ABAP View
V_TCX02 (Lead time scheduling - planned orders) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | BREAKS | Indicator: Scheduling allowing for breaks | ||
| 2 | FEVOR | Production Supervisor | ||
| 3 | LAGE_FR | Latest date for material staging | ||
| 4 | MANDT | Client | ||
| 5 | NAME1 | Name | ||
| 6 | PAART | Order type | ||
| 7 | PHORI | Scheduling horizon (detailed planning) | ||
| 8 | PLNTM_UPD | Indicator: adjust basic dates | ||
| 9 | PRIO1_TMHK | Priority 1 for scheduling | ||
| 10 | PRIO2_TMHK | Priority 2 for scheduling | ||
| 11 | PROT_AUTO | Display scheduling log automatically | ||
| 12 | REDST_MAX | Maximum reduction level | ||
| 13 | REDVS_S1 | Red. of floats before and after production (%) | ||
| 14 | REDVS_S2 | Reduction level 2: Red. of floats bef./after prod. (in %) | ||
| 15 | REDVS_S3 | Reduction level 3: Red. of floats bef./aft. prod. (in %) | ||
| 16 | REDVS_S4 | Reduction level 4: Red. of floats bef./aft. prod. (in %) | ||
| 17 | REDVS_S5 | Reduction level 5: Red. of floats bef./aft. prod. (in %) | ||
| 18 | REDVS_S6 | Reduction level 6: Red. of floats bef./aft. prod. (in %) | ||
| 19 | STVERG | Maximum number of days start date can be in the past | ||
| 20 | TERMKZ | Scheduling type | ||
| 21 | TERMKZ_TXT | Description of scheduling type | ||
| 22 | WERKS_D | Plant |