Data Element list used by SAP ABAP Table PBETVB (Reference structure for XPBET)
SAP ABAP Table
PBETVB (Reference structure for XPBET) is using
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
![]() |
![]() |
|||
1 | ![]() |
AENAM | Name of Person Who Changed Object | |
2 | ![]() |
AUFTV | Split already exists | |
3 | ![]() |
BEDPP | Requirements plan item | |
4 | ![]() |
CUOBJ | Configuration (internal object number) | |
5 | ![]() |
CUOBJ | Configuration (internal object number) | |
6 | ![]() |
DAT01 | Delivery/order finish date | |
7 | ![]() |
DATPO | Date postponed | |
8 | ![]() |
DBMNG | Planned quantity in the data base | |
9 | ![]() |
DBVKZ | Indicator: reqmts date already exists in database | |
10 | ![]() |
DBVKZ | Indicator: reqmts date already exists in database | |
11 | ![]() |
DZUOKR | Criterion for allocation | |
12 | ![]() |
ENTLU | Period indicator (day, week, month, posting period) | |
13 | ![]() |
ENTMG | Withdrawal quantity | |
14 | ![]() |
ENTMG | Withdrawal quantity | |
15 | ![]() |
ERFME | Unit of entry | |
16 | ![]() |
ERFMG | Quantity in unit of entry | |
17 | ![]() |
HISET | Processing a plan with or without history | |
18 | ![]() |
LAEDA | Date of Last Change | |
19 | ![]() |
LOEIN | Deletion indicator | |
20 | ![]() |
MEINS | Base Unit of Measure | |
21 | ![]() |
MENGE_D | Quantity | |
22 | ![]() |
PERXX | Planning period | |
23 | ![]() |
PLNMG | Planned quantity | |
24 | ![]() |
PLNMG | Planned quantity | |
25 | ![]() |
PRGRS | Date type (day, week, month, interval) | |
26 | ![]() |
SERNR | BOM explosion number | |
27 | ![]() |
SHVIS | Schedule line visible | |
28 | ![]() |
SPRAS | Language Key | |
29 | ![]() |
STPKT | Supporting point for independent requirements | |
30 | ![]() |
TECHS | Parameter Variant/Standard Variant | |
31 | ![]() |
TECHS | Parameter Variant/Standard Variant | |
32 | ![]() |
TXTKZ | Indicator: long text exists | |
33 | ![]() |
TXTKZ | Indicator: long text exists | |
34 | ![]() |
UMREN | Denominator for conversion to base units of measure | |
35 | ![]() |
UMREZ | Numerator for Conversion to Base Units of Measure | |
36 | ![]() |
UPDKO | UPDKZ Configuration | |
37 | ![]() |
UPDKZ_D | Update indicator | |
38 | ![]() |
UPDPA | UPDKZ Period split | |
39 | ![]() |
UPLMG | Originally planned quantity | |
40 | ![]() |
UZEIT | Time | |
41 | ![]() |
VERID | Production Version | |
42 | ![]() |
WDATU | Reqstd date | |
43 | ![]() |
WERTPB | Independent requirements value per period |