SAP ABAP Table PSIS_GEN_EKET_PR (Generated structure for LDB PSJ. Do not modify manually.)
Hierarchy
SAP_APPL (Software Component) Logistics and Accounting
   PS-IS (Application Component) Information System
     CNIS (Package) Application development R/3 PS information system
Basic Data
Table Category INTTAB    Structure 
Structure PSIS_GEN_EKET_PR   Table Relationship Diagram
Short Description Generated structure for LDB PSJ. Do not modify manually.    
Delivery and Maintenance
Pool/cluster      
Delivery Class      
Data Browser/Table View Maintenance     Display/Maintenance Allowed with Restrictions 
Components
     
Field Key Data Element Domain Data
Type
Length Decimal
Places
Short Description Check
table
1 .INCLUDE       0   0   Generated structure for LDB PSJ. Do not modify manually.  
2 EBELN EBELN EBELN CHAR 10   0   Purchasing Document Number *
3 EBELP EBELP EBELP NUMC 5   0   Item Number of Purchasing Document *
4 MANDT MANDT MANDT CLNT 3   0   Client *
5 ETENR EETEN EETEN NUMC 4   0   Delivery Schedule Line Counter *
6 EINDT EINDT DATUM DATS 8   0   Item delivery date  
7 SLFDT SLFDT DATUM DATS 8   0   Statistics-Relevant Delivery Date  
8 LPEIN LPEIN PRGBZ CHAR 1   0   Category of delivery date *
9 MENGE ETMEN MENGE QUAN 13   3   Scheduled Quantity  
10 AMENG VOMNG MENG13V QUAN 13   3   Previous Quantity (Delivery Schedule Lines)  
11 WEMNG WEEMG MENG13 QUAN 13   3   Quantity of goods received  
12 WAMNG WAMNG MENG13 QUAN 13   3   Issued quantity  
13 UZEIT LZEIT UZEIT TIMS 6   0   Delivery Date Time-Spot  
14 BANFN BANFN BANFN CHAR 10   0   Purchase requisition number  
15 BNFPO BNFPO BNFPO NUMC 5   0   Item number of purchase requisition *
16 ESTKZ ESTKZ ESTKZ CHAR 1   0   Creation indicator (purchase requisition/schedule lines)  
17 QUNUM QUNUM QUNUM CHAR 10   0   Number of quota arrangement  
18 QUPOS QUPOS NUM03 NUMC 3   0   Quota arrangement item  
19 MAHNZ MAHNZE PACK2 DEC 3   0   No. of Reminders/Expediters for Schedule Line  
20 BEDAT ETBDT DATUM DATS 8   0   Order date of schedule line  
21 RSNUM RSNUM RSNUM NUMC 10   0   Number of reservation/dependent requirements *
22 SERNR SERNR SERNR CHAR 8   0   BOM explosion number *
23 FIXKZ ETFIX XFELD CHAR 1   0   Schedule Line is "Fixed"  
24 GLMNG GLMNG MENG13 QUAN 13   3   Quantity Delivered (Stock Transfer)  
25 DABMG DABMG MENGE QUAN 13   3   Quantity Reduced (MRP)  
26 CHARG CHARG_D CHARG CHAR 10   0   Batch Number *
27 LICHA LICHN LICHN CHAR 15   0   Vendor Batch Number  
28 CHKOM CHKOM XFELD CHAR 1   0   Components  
29 VERID VERID VERID CHAR 4   0   Production Version *
30 ABART MEABART ABART CHAR 1   0   Scheduling agreement release type  
31 MNG02 MNG06 MENGV13 QUAN 13   3   Committed quantity  
32 DAT01 DAT05 DATUM DATS 8   0   Committed date  
33 ALTDT ALTDT DATUM DATS 8   0   Previous delivery date  
34 AULWE AULWE AULWE CHAR 10   0   Route Schedule *
35 MBDAT MBDAT DATUM DATS 8   0   Material Staging/Availability Date  
36 MBUHR MBUHR TIME_PLANT TIMS 6   0   Material Staging Time (Local, Relating to a Plant)  
37 LDDAT LDDAT DATUM DATS 8   0   Loading Date  
38 LDUHR LDUHR TIME_SHIPP TIMS 6   0   Loading Time (Local Time Relating to a Shipping Point)  
39 TDDAT TDDAT_D DATUM DATS 8   0   Transportation Planning Date  
40 TDUHR TDUHR TIME_SHIPP TIMS 6   0   Transp. Planning Time (Local, Relating to a Shipping Point)  
41 WADAT WADAT DATUM DATS 8   0   Goods Issue Date  
42 WAUHR WAUHR TIME_PLANT TIMS 6   0   Time of Goods Issue (Local, Relating to a Plant)  
43 ELDAT ELDAT ELDAT DATS 8   0   Goods Receipt End Date  
44 ELUHR ELUHR ELUHR TIMS 6   0   Goods Receipt End Time (Local, Relating to a Plant)  
45 KEY_ID WRF_BUDG_KEY_ID WRF_BUDG_KEY_ID NUMC 16   0   Unique Number of Budget  
46 OTB_VALUE WRF_POTB_VALUE WRF_POTB_VALUE CURR 17   2   Required Budget  
47 OTB_CURR WRF_POTB_CURRENCY WAERS CUKY 5   0   OTB Currency *
48 OTB_RES_VALUE WRF_POTB_RES_VALUE WRF_POTB_RES_VALUE CURR 17   2   Reserved Budget for OTB-Relevant Purchasing Document  
49 OTB_SPEC_VALUE WRF_POTB_SPECIAL_VALUE WRF_POTB_SPECIAL_VALUE CURR 17   2   Special Release Budget  
50 SPR_RSN_PROFILE WRF_POTB_SPR_RSN_PROFILE WRF_POTB_SPR_RSN_PROFILE CHAR 4   0   Reason Profile for OTB Special Release  
51 BUDG_TYPE WRF_BUDG_TYPE WRF_BUDG_TYPE CHAR 2   0   Budget Type  
52 OTB_STATUS WRF_POTB_STATUS WRF_POTB_STATUS CHAR 1   0   OTB Check Status  
53 OTB_REASON WRF_POTB_STATUS_REASON WRF_POTB_STATUS_REASON CHAR 3   0   Reason Indicator for OTB Check Status  
54 CHECK_TYPE WRF_BUDG_OTB_CHECK WRF_BUDG_OTB_CHECK CHAR 1   0   Type of OTB Check  
55 DL_ID WRF_PSCD_DL_ID SYSUUID_22 CHAR 22   0   Date Line ID (GUID)  
56 HANDOVER_DATE WRF_PSCD_HANDOVER_DATE DATS DATS 8   0   Transfer Date  
57 NO_SCEM WRF_PSCD_NO_SCEM CHAR1_X CHAR 1   0   Purchase Order Not Transferred to SCEM  
58 DNG_DATE WRF_PCTR_DNG_DATE DATUM DATS 8   0   Creation Date of Reminder Message Record  
59 DNG_TIME WRF_PCTR_DNG_TIME UZEIT TIMS 6   0   Creation Time of Reminder Message Record  
60 CNCL_ANCMNT_DONE WRF_PCTR_CNCL_ANCMT_DONE CHAR1_X CHAR 1   0   Cancellation Threat Made  
61 DATESHIFT_NUMBER WRF_PCTR_DATESHIFT_NUMBER DEC3 DEC 3   0   Number of Current Date Shifts  
History
Last changed by/on SAP  20110901 
SAP Release Created in