SAP ABAP Data Element ETFIX (Schedule Line is "Fixed")
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
SRM-EBP (Application Component) Enterprise Buyer
⤷
BBP_APPLICATION (Package) Structure Package EBP
⤷
ME (Package) Application development R/3 Purchasing
⤷
⤷
⤷
Basic Data
| Data Element | ETFIX |
| Short Description | Schedule Line is "Fixed" |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | XFELD | |
| Data Type | CHAR | Character String |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Fixed |
| Medium | 15 | Fixing Ind. |
| Long | 20 | Fixing Indicator |
| Heading | 2 | Fx |
Documentation
Definition
Fixes the schedule line and determines that it cannot now be automatically changed as a result of materials planning and control/MRP activities.
Procedure
The indicator is set automatically if:
- You make manual changes to a line of a scheduling agreement delivery schedule that was created via the materials planning process
- You create a schedule line manually
Examples
Dependencies
You can specify whether Materials Planning/MRP can change delivery schedule lines within the firm and trade-off zones in the additional data for the scheduling agreement item.
History
| Last changed by/on | SAP | 19980218 |
| SAP Release Created in |