SAP ABAP Table MPLAN_MHIS (Maintenance Plan History)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷
PM-PRM-MP (Application Component) Maintenance Plans
⤷
MPLAN_API (Package) Maintenance Plan API

⤷

⤷

Basic Data
Table Category | INTTAB | Structure |
Structure | MPLAN_MHIS |
![]() |
Short Description | Maintenance Plan History |
Delivery and Maintenance
Pool/cluster | ||
Delivery Class | ||
Data Browser/Table View Maintenance | Display/Maintenance Allowed with Restrictions |
Components
![]() |
Field | Key | Data Element | Domain | Data Type |
Length | Decimal Places |
Short Description | Check table |
---|---|---|---|---|---|---|---|---|---|
1 | ![]() |
UPD_KNZ | XFLAG | CHAR | 1 | 0 | Flag: MHIS record must be updated | ||
2 | ![]() |
0 | 0 | Maintenance plan history | |||||
3 | ![]() |
MANDT | MANDT | CLNT | 3 | 0 | Client | * | |
4 | ![]() |
WARPL | WARPL | CHAR | 12 | 0 | Maintenance Plan | MPLA | |
5 | ![]() |
ABNUM | ABNUM | INT4 | 10 | 0 | Maintenance Plan Call Number | ||
6 | ![]() |
PAKETZAEHL | PAKZAE | NUMC | 2 | 0 | Maintenance Package Number | * | |
7 | ![]() |
NPLDA | DATUM | DATS | 8 | 0 | Next planned date | ||
8 | ![]() |
TERMA | CHAR1 | CHAR | 1 | 0 | Scheduling type | ||
9 | ![]() |
STADT | DATUM | DATS | 8 | 0 | Start date | ||
10 | ![]() |
LRMDT | DATUM | DATS | 8 | 0 | Date of last completion in maintenance plan | ||
11 | ![]() |
OFFZE | FLTP | FLTP | 16 | 16 | Offset in current cycle | ||
12 | ![]() |
OFFZO | FLTP | FLTP | 16 | 16 | Previous offset | ||
13 | ![]() |
ABRUD | DATUM | DATS | 8 | 0 | Date of the call | ||
14 | ![]() |
ABRNA | USNAM | CHAR | 12 | 0 | Name of the person who made the call | ||
15 | ![]() |
SFAKT | SFAKT | DEC | 3 | 2 | Cycle modification factor | ||
16 | ![]() |
TERMKNZ | TERMKNZ | CHAR | 1 | 0 | Scheduling indicator | ||
17 | ![]() |
VERSCHPLUS | NUM3 | NUMC | 3 | 0 | Shift Factor for Late Completion | ||
18 | ![]() |
TOLERPLUS | NUM3 | NUMC | 3 | 0 | Tolerance for Late Completion (%) | ||
19 | ![]() |
KNNRM | XFLAG | CHAR | 1 | 0 | Indicator for negative completion confirmation | ||
20 | ![]() |
KNPRM | XFLAG | CHAR | 1 | 0 | Indicator: planned counter reading set manually | ||
21 | ![]() |
NPLDO | DATUM | DATS | 8 | 0 | Last planned date | ||
22 | ![]() |
NPLDZ | DATUM | DATS | 8 | 0 | Completion for Predecessor | ||
23 | ![]() |
MANDA | DATUM | DATS | 8 | 0 | Manual call date | ||
24 | ![]() |
OFFLE | FLTP | FLTP | 16 | 16 | Estimated annual performance | ||
25 | ![]() |
OFFLO | FLTP | FLTP | 16 | 16 | Shift factor | ||
26 | ![]() |
KNZABR | FLAG | CHAR | 1 | 0 | Reserved | ||
27 | ![]() |
KNZSTILL | FLAG | CHAR | 1 | 0 | Indicator for leading cycle (multi-counter plan) -> internal | ||
28 | ![]() |
TSABR | XFLAG | CHAR | 1 | 0 | Scheduling status: planned date called | ||
29 | ![]() |
TSVBT | XFLAG | CHAR | 1 | 0 | Scheduling status: call outstanding | ||
30 | ![]() |
TSENQ | XFLAG | CHAR | 1 | 0 | Scheduling status: call horizon not reached | ||
31 | ![]() |
TSENM | XFLAG | CHAR | 1 | 0 | Scheduling status: stopped manually | ||
32 | ![]() |
HORDA | DATUM | DATS | 8 | 0 | Call date | ||
33 | ![]() |
TSTAT | FLAG | CHAR | 1 | 0 | Scheduling status | ||
34 | ![]() |
FIXDU | USNAM | CHAR | 12 | 0 | Fixed or skipped by | ||
35 | ![]() |
FIXDA | DATUM | DATS | 8 | 0 | Fixed/skipped on | ||
36 | ![]() |
VGNUM | OBJKN | INT4 | 10 | 0 | Previous maintenance plan call | * | |
37 | ![]() |
DZYK_ZEIT | FLTP | FLTP | 16 | 16 | Maintenance package cycle/offset | ||
38 | ![]() |
DZYK_LEIST | FLTP | FLTP | 16 | 16 | Total counter reading on call date | ||
39 | ![]() |
PUFF_VORL | NUM3 | NUMC | 3 | 0 | Lead Float in Days | ||
40 | ![]() |
PUFF_NACHL | NUM3 | NUMC | 3 | 0 | Follow-up float in days | ||
41 | ![]() |
SZAEH | FLTP | FLTP | 16 | 16 | Start counter reading | ||
42 | ![]() |
RZAEH | FLTP | FLTP | 16 | 16 | Counter reading confirmation | ||
43 | ![]() |
NZAEH | FLTP | FLTP | 16 | 16 | Next planned counter reading | ||
44 | ![]() |
USERMOD | CHAR1 | CHAR | 1 | 0 | Scheduling determined by user | ||
45 | ![]() |
0 | 0 | Append Structure 1 for MHIS Table | |||||
46 | ![]() |
IMRC_POINT | IMRC_POINT | CHAR | 12 | 0 | Measuring Point | * | |
47 | ![]() |
ANDOR | RADIO | CHAR | 1 | 0 | Indicator for OR or AND link | ||
48 | ![]() |
TGON | NUM3 | NUMC | 3 | 0 | Scheduling to reoccur when lead float reached | ||
49 | ![]() |
DZYK_ZEIT | FLTP | FLTP | 16 | 16 | Maintenance package cycle/offset | ||
50 | ![]() |
DZEIEH | MEINS | UNIT | 3 | 0 | Unit for the performance of maintenance tasks | * | |
51 | ![]() |
DZYK_OFFZT | FLTP | FLTP | 16 | 16 | Start offset of a time-based maintenance package | ||
52 | ![]() |
NZAEH | FLTP | FLTP | 16 | 16 | Next planned counter reading | ||
53 | ![]() |
TIME_START | TIME | TIMS | 6 | 0 | Start Time for Scheduling | ||
54 | ![]() |
TIME_CONF | TIME | TIMS | 6 | 0 | Time of Last Completion in Maintenance Plan | ||
55 | ![]() |
CYCLESETSEQ | NUMC2 | NUMC | 2 | 0 | Cycle Set Sequence | ||
56 | ![]() |
DATE_START_EX | DATUM | DATS | 8 | 0 | Maintenance Plan Start Date Set Externally | ||
57 | ![]() |
TIME_START_EX | TIME | TIMS | 6 | 0 | Maintenance Plan Start Time Set Externally | ||
58 | ![]() |
DATE_START_SYST | DATUM | DATS | 8 | 0 | System Date for Maintenance Plan Start | ||
59 | ![]() |
TIME_START_SYST | TIME | TIMS | 6 | 0 | System Time for Maintenance Plan Start | ||
60 | ![]() |
J_OBJNR | J_OBJNR | CHAR | 22 | 0 | Object number | * | |
61 | ![]() |
IND_SET_REPEAT | NUMC2 | NUMC | 2 | 0 | Repeat Factor for Cycle Set Sequence | ||
62 | ![]() |
IND_MPLA_API | IND_API | CHAR | 2 | 0 | Maintenance Plan Was Created/Changed by API | ||
63 | ![]() |
TIME_START | TIME | TIMS | 6 | 0 | Start Time for Scheduling |
Foreign Keys
![]() |
Source Table | Source Column | Foreign Table | Foreign Column | Dependency Factor | Cardinality left | Cardinality right |
---|---|---|---|---|---|---|---|
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
1 | MPLAN_MHIS | WARPL | ![]() |
![]() |
KEY | 1 | CN |
History
Last changed by/on | SAP | 20130529 |
SAP Release Created in | 700 |