SAP ABAP Data Element NZAEH (Next planned counter reading)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       IPRM (Package) Application Development R/3 Preventive Maintenance
Basic Data
Data Element NZAEH
Short Description Next planned counter reading  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type FLTP    
Data Type FLTP   Floating point number, accurate to 8 bytes 
Length 16    
Decimal Places 16    
Output Length 22    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 TL counter 
Medium 15 TL counter 
Long 20 Next TL cntr reading 
Heading  
Supplementary Documentation - NZAEHC 0001

Use

In a performance-based maintenance plan, the planned counter reading is calculated automatically by the system on scheduling.

Example

Package due:            every 5,000 miles

Total counter
reading:                12,300 miles

Next planned
counter reading:        17,300 miles

Supplementary Documentation - NZAEHC 0002

Procedure

If you want to maintain the planned counter reading manually, enter a counter reading in this field.

Example

A pump's counter is reactivated in the preventive maintenance plan after unexpected repairs have been carried out.

The total counter reading is 82,150 liters. A maintenance task is due every 10,000 liters. As the pump has just been repaired outside the normal maintenance cycle, the next task is not to take place at 92,150 liters, but at 100,000 liters instead.

Package due:                every 10,000 L

Total counter reading:        82,150 L

Next theoretical
planned counter reading:    92,150 L

Counter reading
maintained manually:        100,000 L

Supplementary Documentation - NZAEHC 0003

Use

In the case of a multiple counter plan, you can either maintain the planned counter reading manually or have the system calculate it on scheduling.

Procedure

If you want to maintain the planned counter reading manually, call up the function for maintaining a planned counter reading in the change mode, and enter a counter reading in the field NxtPlanCountReading.

Example

A pump's counter is reactivated in the maintenance plan after unexpected repairs have been carried out.

The total counter reading is 82,150 liters. A maintenance task is due every 10,000 liters. As the pump has just been repaired outside the normal maintenance cycle, the next task is not to take place at 92,500 liters, but at 100,000 liters instead.

Package due:                every 10,000 L

Total counter reading:        82,150 L

Next theoretical
planned counter reading:    92,150 L

Counter reading
maintained manually:        100,000 L

History
Last changed by/on SAP  20011009 
SAP Release Created in