Hierarchy
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ CP (Package) R/3 Application development: PP Task Lists
Basic Data
Data Element | PSNFH |
Short Description | Item Number for Production Resource/Tool |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | PSNFH | |
Data Type | NUMC | Character string with only digits |
Length | 4 | |
Decimal Places | 0 | |
Output Length | 4 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ITEM_NO_OF_PRODUCTION_RESOURCE | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Item |
Medium | 15 | Item |
Long | 20 | Item |
Heading | 4 | Item |
Documentation
Definition
Number that specifies the sequence in which the production resources/tools allocated to the operation or activity are sorted.
When you assign production resources/tools to an operation/activity , the item numbers are proposed with an increment of 10. You can re-sort the production resources/tools by overwriting the proposed values.
Supplementary Documentation - PSNFH 0001
Use
You can assign to every inspection charactistic a production resource/tool (PRT) as test equipment, if it is assigned to the operation.
Procedure
Enter here the item number of the PRT that you want to assign to the selected inspection characteristic.
Supplementary Documentation - PSNFH 0104
Definition
Key that identifies production resource/tool assignment within an operation or phase.
Use
You use the item number to determine the sequence in which the PRTs are assigned to an operation or phase.
The item number for entering PRTs has as a default a step of ten. You can sort the PRT by overwriting the default value.
Supplementary Documentation - PSNFH 0151
Definition
Key that identifiesKey that identifies <GL:production resource/tool>production resource/tool assignment within an operation or phase.
Procedure
Enter the item number of the PRT that you want to assign to the selected inspection characteristic as test equipment.
History
Last changed by/on | SAP | 20010820 |
SAP Release Created in |