Data Element list used by SAP ABAP Table ATPMAT (ATP Server: Material Table)
SAP ABAP Table
ATPMAT (ATP Server: Material Table) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | ANDEC | No. of decimal places to which rounding should be performed | ||
| 2 | APOKZ | Indicator: Is material relevant for APO | ||
| 3 | AUSDT | Effective-out date | ||
| 4 | BASMG | Base quantity | ||
| 5 | BEARZ | Processing time | ||
| 6 | BERID | MRP Area | ||
| 7 | BESKZ | Procurement Type | ||
| 8 | CUOBM | Internal object number | ||
| 9 | DISGR | MRP Group | ||
| 10 | DISMM | MRP Type | ||
| 11 | DISPO | MRP controller | ||
| 12 | DISST | Low-level code | ||
| 13 | DZEIT | In-house production time | ||
| 14 | EISBE | Safety stock | ||
| 15 | INSMK | Stock Type | ||
| 16 | KZAUS | Discontinuation indicator | ||
| 17 | KZPSP | Indicator for cross-project material | ||
| 18 | KZVBR | Consumption posting | ||
| 19 | KZWSO | Units of measure usage | ||
| 20 | MAKTX | Material description | ||
| 21 | MATNR | Material Number | ||
| 22 | MEINS | Base Unit of Measure | ||
| 23 | MENGU | Quantity Updating in Material Master Record | ||
| 24 | MISKZ | Mixed MRP indicator | ||
| 25 | MTVFP | Checking Group for Availability Check | ||
| 26 | PLIFZ | Planned delivery time in days | ||
| 27 | PRBME | Base unit of measure for product group | ||
| 28 | QMATV | Inspection Setup Exists for Material/Plant | ||
| 29 | RUEZT | Setup and teardown time | ||
| 30 | SOBES | Special procurement type | ||
| 31 | SOBKZ | Special Stock Indicator | ||
| 32 | STRGR | Planning strategy group | ||
| 33 | TRANZ | Interoperation time | ||
| 34 | UMLME | Stock in transfer (plant to plant) | ||
| 35 | UMREFF | Conversion factor: quantities | ||
| 36 | VINT1 | Consumption period: backward | ||
| 37 | VINT2 | Consumption period: forward | ||
| 38 | VPMAT | Planning material | ||
| 39 | VPWRK | Planning plant | ||
| 40 | VRMOD | Consumption mode | ||
| 41 | WEBAZ | Goods receipt processing time in days | ||
| 42 | WERKS_D | Plant | ||
| 43 | WERTU | Value Updating in Material Master Record | ||
| 44 | WZEIT | Total replenishment lead time (in workdays) | ||
| 45 | WZTER | End of replenishment lead time |